Statement of Work Army T1 to Ethernet PSNET 081825 (DRAFT).pdf

PDF 691 KB Posted

Attached to
USARPAC G6 IP2LMR T1 to Ethernet
Solicitation number
W912CN25RA011
Issued by

About this file

This is a Draft Statement of Work (SOW) for a DISA mandate to migrate current T1 PSNET circuits to Ethernet via DISA Storefront before contract termination on 8 September 2025. The contractor is required to perform comprehensive network conversion and migration activities across multiple sites in Hawaii, including Kahuku, Mt. Kaala, Aliamanu, Fort Shafter, Schofield, WAAF IOC, TAMC, and Coop locations. Key responsibilities include reviewing purchase orders, tracking shipping, inventorying equipment, coordinating cutover plans, reporting site outages, reconfiguring network infrastructure, upgrading firmware, performing link testing, and updating network documentation.

The Government will provide project support by offering a Point of Contact, base access, required Ethernet circuits, physical installation space, operational circuits to connect to the Zone 3 Master Site, and dedicated electrical circuits. The contractor must also turn over all core equipment removed from the Zone 3 master site to IP2LMR for property book accountability. The technical scope involves comprehensive network reconfigurations, including updating core routers, dispatch site routers, backhaul switches, firewalls, and gateways, with specific requirements for cybersecurity hardening, firmware upgrades, and ensuring end-to-end connectivity across the specified sites.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

Statement of Work In support of the DISA mandate to migrate current T1 PSNET circuits to Ethernet via DISA Storefront before contract termination on 8 September 2025. Overview

• Contractor Responsibilities:

• Contractor shall review the purchase order from IP2LMR for accuracy, then order and track the shipping process and keep IP2LMR team of the shipping status.

• Contractor shall unpack and inventory all new equipment, checking or order compliance and completeness.

• Contractor shall work with supplier to correct any fault or deficiencies.

• Contractor shall coordinate cutover plan and activities with IP2LMR.

• Contractor shall report the site outage and work being performed to Motorola System support.

• Contractor shall assume the responsibility for the installation and performance of the affected system conversion and circuit migration for the T1s associated with the following sites:

o Kahuku (Layer 3 config only) o Mt. Kaala o Aliamanu o Fort Shafter 1292 o Fort Shafter PMO Bldg 118 o Fort Shafter CAC Building 113 and 600 o Schofield PMO Bldg 3010 o WAAF IOC Bldg 106 o TAMC ER and EOC o Coop

• Contractor shall reconfigure the core and local network configurations as required.

• Contractor shall update the following but not limited to Zone 3 core routers, dispatch site routers, backhaul switches, firewalls, and gateways impacted by the change.

• Contractor shall configure switches to ensure proper end-to-end connectivity of sites to the core.

• Contractor shall harden switches per Cyber IA requirements.

• Contractor shall upgrade firmware per IA requirements prior to install.

• Contractor shall perform basic link testing for each site.

• Contractor shall update and provide network as built documentation to reflect changes.

• Contractor shall verify all operations and updates are provisioned to include RF sites and dispatch console operations.

• Contractor shall remove and dispose of any debris that was made during the removal, configuration, and installation.

DRAFT

• All core equipment removed from the Zone 3 master site is to be turned into IP2LMR for property book accountability.

Government responsibilities:

• Provide Point of Contact (POC) for the project.

• Provide base access and escort if required.

• Provide required Ethernet circuits.

• Provide physical space for installation of switches into racks.

• Provide operational circuit to connect to Zone 3 Master Site.

• Provide dedicated electrical circuit with dedicated outlet with a minimum of 15 amp circuit.