STATEMENT OF WORK AGS Short Term HE Rental March 2026 (1).docx

DOCX document 40 KB Posted

Attached to
Heavy Equipment Short-term Lease - AGS Taxiway Project - Quarry Dump Truck
Solicitation number
M0068126Q0027
Issued by

About this file

This is a Statement of Work for a short-term heavy equipment lease at Aviation Ground Support (AGS) Detachment, Marine Corps Air Ground Combat Center, Twentynine Palms, California. The lease period runs from March 9, 2026 through May 29, 2026 (83 days total), with equipment delivery and pick-up services included. The contractor must maintain all equipment in working order and provide warranty service calls during regular working hours with professional administrative, technical, and transportation support.

The required equipment includes: two 50-ton quarry dump trucks with 340 hp hydraulic lift beds and climate-controlled cabs (March 9–May 29); four front-end loaders with 15-ton bucket capacity and 417 hp enclosed cabs with air conditioning (March 9–May 29); one 4,000-gallon water truck equipped with fire hydrant hookups, PTO sprayers, and climate-controlled cab (March 30–May 29); one double drum vibratory roller compactor with 84-inch roller width and climate-controlled cab (March 30–May 29); one pulverizer/reclaimer with 20-inch cutting depth and 96-inch cutting width (March 15–27); and one grader with minimum 4-wheel drive capability equivalent to or exceeding a 672 model John Deere (March 9–May 29). The place of performance is Building 5701 at the Marine Corps Air Ground Combat Center in Twentynine Palms, California.

View the file

Other files

File Type Posted
Solicitation Amendment M0068126Q00270001 SF 30 (1).pdf PDF
Admendment - Equipment Schedule.xlsx XLSX spreadsheet
Admendment - STATEMENT OF WORK.docx DOCX document
Equipment Schedule.xlsx XLSX spreadsheet
Solicitation - M0068126Q0027.pdf PDF
Wage Determination.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

DESCRIPTION

This statement of work describes the lease of heavy construction equipment located at Aviation Ground Support (AGS) Detachment, Exercise Support Division (ESD), Marine Corps Air Ground Combat Center, Twentynine Palms, California. The contractor shall provide all equipment and maintain equipment in working order for the duration of the lease, delivery and pick-up of the equipment.

Salient Characteristics of the equipment should be as follows:

CLIN

Required Salient Characteristics (Physical, Functional and Performance)

0001
Quarry Dump Truck (x2)
50 Ton Capacity

· 50 Ton

· 340 hp.

· Hydraulic Lift Bed

· Climate Controlled Cab

· Full Load Height NTE 33 Feet

CLIN

Required Salient Characteristics (Physical, Functional and Performance)

0002
Front End Loader (x4)
Front End Loader

· 15 Ton Bucket Capacity/ 8.0 Cu. Yd.

· 417 hp.

· Enclosed Cab w/ac

CLIN

Required Salient Characteristics (Physical, Functional and Performance)

0003
4000 Gallon (x1) Capacity Water Truck
Water Truck

· 4000 Gallon capacity water truck capable of operation in sandy conditions.

· Fire hydrant hookups

· PTO equipped with front, side, and rear sprayers

· 50 Hose with spray attachments

· Hydraulic Hook Ups

· Climate Controlled Cab

CLIN

Required Salient Characteristics (Physical, Functional and Performance)

0004
Double Drum Vibratory Roller, Compactor (x1)
Double Drum Roller

· 84” Roller Width

· Climate Controlled Closed Cab

CLIN

Required Salient Characteristics (Physical, Functional and Performance)

0005
Pulverizer/Reclaimer
Pulverizer/Reclaimer

· 20 Inch Cutting Depth

· 96 Inch Cutting Width

· Climate Controlled Closed Cab

CLIN

Required Salient Characteristics (Physical, Functional and Performance)

0006
Grader (x1)
2 X Grader

- Minimum 4 Wheel Drive

- Minimum 672 Model John Deer or Equivalent

DURATION

This lease will commence on 9 March 2026 and end on 29 May 2026 or a total of 83 days. The dates for each piece of equipment will not span the entire POP for some of the equipment. Below are the dates for each piece (reference Attachment #1, Equipment Schedule).

AGS Equipment CLIN 1- Quarry Dump (X2) – March 9 – May 29 CLIN 2 – Front End Loader (X4) – March 9 – May 29 CLIN 3 – Water Truck (x1) – March 30 – May 29 CLIN 4 – Vibratory Roller – March 30 – May 29 CLIN 5 – Reclaimer – March 15 – March 27 CLIN 6 – Grader (x1)– March 9 – May 29

CONTRACTOR REQUIREMENTS

The contractor shall have adequate procedures for receiving and responding to warranty service calls during regular working hours. The contractor shall provide professional, administrative, technical services and transportation to perform warranty service calls.

PLACE OF PERFORMANCE AND LOCATION OF WORK

Aviation Ground Support Detachment (AGS Det), Exercise Support Division (ESD), Marine Corps Air Ground Combat Center, Twentynine Palms, California, Building 5701.

GOVERNMENT RESPONSIBILITY

Provide a point of contact for contractor.