Statement of Work AE IDIQ Revised.pdf

PDF 324 KB Posted

Attached to
Mechanical Electrical Plumbing A/E IDIQ
Solicitation number
AMD-SSN-26-0007
Issued by

About this file

This is a Statement of Work (SOW) for a Mechanical/Electrical/Plumbing (MEP) Architect & Engineer (A&E) Indefinite Delivery/Indefinite Quantity (IDIQ) contract with the National Institute of Standards and Technology (NIST). The Government seeks to award up to three offerors to provide A&E services for planning, evaluation, design, and engineering services for the maintenance, modification, and improvement of specialized facility mechanical and electrical systems at the NIST Gaithersburg campus (52 buildings on 578 acres) and other Montgomery County, Maryland facilities. The contract consists of one base-year plus four one-year ordering periods, with specific schedule of deliverables and period of performance defined at the task order level. Performance shall occur at the NIST Gaithersburg campus and Montgomery County locations as defined by individual task orders.

The SOW encompasses multi-disciplined A&E services including evaluation and feasibility studies with engineering modeling and simulation; facility repairs and upgrades (architectural, mechanical, electrical, communications, structural, fire protection, building enclosure); cost estimating at various levels; life cycle cost analysis; hazardous material surveys; roofing and waterproofing services; commissioning support; Program of Requirements development; value engineering analysis; record drawings; surveying; permit applications; and construction quality management. All designs, drawings, and specifications must be prepared using AUTODESK AUTOCAD 2025 per applicable state codes and sound engineering practices. The A&E Contractor must appoint a project manager/coordinator as single point of contact (POC) to NIST, submit monthly updates addressing accomplishments, problems, and delays, and attend progress meetings with senior-level staff. Submittals, RFIs, and change orders must be reviewed and returned within five calendar days; site visits at 25%, 50%, 75%, 90%, and final inspection phases are required. All deliverables must be accepted or rejected within 21 days unless otherwise specified at task order level. NIST retains ownership of all CAD files, BIM Models, engineering calculations, and facility data. The A&E Contractor must comply with HSPD-12 security requirements, provide safety training and equipment, and submit staff rosters with background investigations at the Low Risk sensitivity designation level. Payment terms are Net 30 days upon receipt and acceptance of proper invoices, with no advance payment authorized and no partial shipments or invoices accepted unless pre-approved.

View the file

Other files

File Type Posted
MEP Sources Sought.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Title: Mechanical Mechanical/Electrical/Plumbing (MEP) Architectural & Engineering (AE) Indefinite Delivery/Indefinite Quantity (IDIQ) Contract

I. BACKGROUND INFORMATION

The National Institute of Standards and Technology (NIST) Gaithersburg, Maryland campus is a Research and Development (R&D) facility with 52 buildings located on a 578-acre campus.

Other facilities are located within Montgomery County, Maryland.

Most R&D buildings are technically sophisticated laboratory facilities with specialized environmental and utility systems required for research and experimental activities. Laboratory facilities typically utilize specialized controls such as uninterrupted power, compressed gas systems, clean-room technologies, and tight-tolerance air temperature control systems for the conduct of research and experimental studies.

Utilities are distributed to the individual buildings by underground pipe and electrical distribution systems from central plant services owned and operated by NIST. NIST campus facilities provide chilled water, steam, and compressed air from a centralized utility generation plant located on the campus. Commercial high-voltage electricity is received at a main sub-station and distributed radially by multiple facility spot networks. Laboratory facilities typically utilize specialized services such as uninterrupted power, compressed gas systems, clean-room technologies, and tight-tolerance control systems for conducting research.

Existing buildings are 3-60 years old and generally steel superstructure with block and brick wall construction. Several facilities have specialized layouts with below grade concrete sub-basements and/or combination window/panelized storefront facade. Facility interior and exterior rehabilitation and renovations are continuous as buildings and systems age, or scientific projects require new layouts to accommodate on-going research.

II. PURPOSE:

The Government seeks to award up to three offerors to provide mechanical/electrical Architect & Engineer (A&E) services via an IDIQ contract for planning, evaluation, design and engineering services for the maintenance, modification, and improvement of specialized facility mechanical and electrical systems.

III. PLACE OF PERFORMANCE

Performance shall take place within the NIST Gaithersburg campus and other facilities located in Montgomery County, Maryland as defined by the Task order.

IV. PERIOD OF PERFORMANCE

NIST intends to conduct a competitive acquisition that consists of one (1) base-year contract plus four (4), one-year ordering periods. Each task order will specify its period of performance.

V. TASKS

This Statement of Work (SOW) sets forth the general requirements for the performance of various services required under this Contract. Multi-disciplined A-E services are required for reports, basis of design, drawings, specifications, cost estimates, calculations, and schedules associated with the following tasks:

• Create and deliver evaluation and feasibility studies to include engineering modeling and simulation

• Provide demolition of NIST structures, utilities, and infrastructure

• Repair and/or repair by replacement, modification/reconfiguration, and upgrades to

NIST facilities (e.g., laboratories/scientific research, office, industrial). Including but not limited to architectural, mechanical, electrical, communications, structural, fire protection, and building enclosure (e.g., roofs, windows, foundations).

• Repair and/or repair by replacement, modification/reconfiguration for campus utility systems and supporting underground structures

• Produce comprehensive historical assessments for the preservation, rehabilitation, and restoration of historic property

• Provide interior design services consisting of programming and space assessment, fit plans, and office furniture to enhance aesthetics, comfort, efficiency, and workplace safety.

• Cost estimating for different levels (e.g., concept, detailed program, project)

• Conduct life cycle cost analysis identifying cost elements from initial concept through operations, support, and disposal

• Prepare Hazardous material survey and risk assessment (e.g., asbestos, mold, lead paint)

• Perform roofing and waterproofing services such as visual inspections and existing conditions surveys, failure investigation, and design for repairs.

• Generate Commissioning including assistance with development of Owner’s Project

Requirements (OPR), design document reviews, development of commissioning specifications, and initial commissioning plan

• Construct Program of Requirements (POR) development by meeting with campus personnel and confirming design intent for major systems (e.g., mechanical, electrical, plumbing, structural, controls, security, fire alarm, etc.)

• Provide value engineering analysis to achieve design goals while lowering life cycle costs and maintaining the required performance, quality, reliability, and maintainability.

• Record drawings development from compiled as-built set.

• Conduct surveying (e.g., ALTA/ASCM, boundary, topographic, construction, site planning)

• Perform evaluation of items requiring earthwork such as excavation, grading, ponds, drainage, foundation, and footings

• Prepare permit applications submission to regulatory authorities based on specific project requirements. To be coordinated with COR and AHJ for acceptance and or approval

• Ensure environmental compliance (State or Federal) conforming to laws, regulations, standards, and other requirements

• Provide construction quality management for submittal reviews and commissioning services

The following are examples of potential tasks for this contract. This list is intended to provide an idea of the type of work envisioned, but NIST makes no assurances that these projects will be included in this IDIQ. Task specifications will be added at the Task Order level to include any additional task requirements.

1.1- Replace Potable Water Lines in Service Entry Rooms 2.1- Major Electrical Equipment Replacement 3.1- Short Circuit Study 4.1- Modify Electrical Relaying Study 5.1- Building Fire Alarm Panel and Audio/Visual Device Replacement 6.1- Laboratory and Office Renovations to meet Occupant’s Needs 7.1- Air Handling Unit Replacement 8.1- Elevator Modernization 9.1- Replacement of Building Steam Stations and associated components 10.1-Restroom Renovations 11.1-Replace/Upgrade building-wide hydronic cooling systems 12.1-Installation of building-wide metering systems

VI. GENERAL REQUIREMENTS:

A. A-E Services- The A-E Contractor shall perform all or part of the following services as identified in each Task Order.

B. Project Management and Quality Services

(1) The A-E Contractor shall appoint a project coordinator or manager and alternate to serve as a single point of contact (POC) and liaison between the A-E and the Contracting Officer (CO) and/or their representative for the services required under the Contract.

a. The project manager shall be responsible for the coordination of the services provided under the Contract and shall respond to questions regarding clarification of project deliverables during controls and review procedures to minimize conflicting errors and omissions and provide for the technical adequacy of design information.

(2) Point of contact: The A-E Contractor shall provide and designate a single point of contact (POC) to represent the A-E’s design team throughout the design and construction administration. The POC shall coordinate all communications between NIST and the A-E and act as a central path of communication.

a. The designated POC shall communicate directly to the NIST through written requests and responses and provide documentation as requested to NIST in the form a design progress/issues log. Upon request, an example of the approved issue log format will be provided.

b. The design progress/issues log shall:

i. Summarize current design progress made during that week

ii. Log all sent and received requests for design information as well as other pertinent matters of communication

iii. Document all pending matters that will potentially affect the delivery schedule defined in the task document

iv. Identify upcoming actions that may require advanced preparations (i.e. on-site project meetings, site visits, and construction administration visits).

(3) Meetings: Progress and review meetings shall be held at a mutually agreed upon time and location for discussion of questions and problems relating to the work under the Contract.

a. Attendees shall be key players for the task order in question; if the assigned expert is not available then an expert with equal qualifications may be substituted.

b. If the assigned design team/A-E service team-member is not available, then an expert with equal qualifications may be substituted.

c. Attendees from the A-E firm shall be conversant with the project and be of appropriate experience and skillset to the items discussed. Senior level A-E staff that are knowledgeable about the project and specific task order shall be present for all meetings involving project decisions.

d. The A-E shall take meeting notes for all meetings and provide a written copy within 5 business days to NIST.

(4) Monthly Updates: The A-E Contractor shall submit a monthly update report in writing for each individual task order. The report may be submitted by email to the Contracting Officer (CO), Contract Specialist (CS), and respective Contracting Officer Representative (COR) and shall address the following per project/task order:

a. Major Accomplishments, Significant Problems and Proposed Solutions, Issues with Contractual Requirements, Issues with Meeting the Task Order Deliverable Dates/Delays, and Contractor's Proposed Action to Remediate the Delays, if applicable.

(5) Quality Assurance - The A-E Contractor designated POC shall document and track all quality control feedback from NIST and coordinate responses to these items.

a. Quality control and assurance reporting shall be coordinated through the A-E

POC.

(6) Coordination- When directed by the CO, the A-E Contractor shall be required to coordinate with other consultants involved with specific design aspects of projects being developed under any separate Contracts.

(7) Value Engineering- The A-E Contractor shall cooperate with an “outside” (i.e., a third party) VE consultant when directed by the COR. This may require the A-E to respond to VE recommendations and incorporated recommendations of the VE consultants into the design.

a. If the A-E is required to incorporate VE changes to the design documents, this work may be included by a modification to the task order if so, determined by the CO.

C. Design Services

(1) All designs, drawings, and specifications shall be prepared by the A&E Contractor using a computer aided drafting system with AUTODESK AUTOCAD 2025 in accordance with applicable codes and regulations applicable to the state in which the project will be developed and shall conform to sound engineering practices.

a. All criteria, factors, assumptions and codes upon which the design is based are to be documented and provided to NIST as well as the justification for the selection of these criteria.

D. Construction Services

(1) The A-E Contractor shall attend any Pre-Bid site visits as applicable and respond with recommendations for any questionable items. If necessary, develop amendments or assist with project procurement. A written response is required.

a. Attend as applicable pre-construction meetings, after award of construction Contract, and once prior to start of any additional phase.

b. Attend one (1) commissioning/project schedule coordination meeting after award of construction Contract (telephone attendance mandatory, site attendance optional).

(2) Submittal, Request for Information (RFI), and Change Order Review (cost and no cost change orders)

a. The A-E firm shall review and respond to all: submittals, change orders, commissioning reports, equipment startup reports, functional test reports, and commissioning issue reports.

b. All submittals, RFI’s and change order proposals will be reviewed for compliance with the specifications and reasonable costs and returned to COR within five (5) calendar days after receipt.

c. The A-E shall support commissioning inquiries related to the designed mechanical, electrical, plumbing, fire protection, lighting, and other building systems included in this project’s scope. Where required by the commissioning authority, the A-E shall actively respond to design intent clarification requests that occur while inspecting and testing any systems.

(3) Commissioning Support- As applicable, the A-E Contractor shall work with the commissioning agent throughout the design and construction process to ensure all sustainable objectives are met. The A-E shall support construction phase commissioning project meetings, reports and inquiries.

(4) Site Visits (In addition to site visits listed in this section)

a. The A-E Contractor shall visit the site at the request of the COR or

CO to answer technical questions and/or provide clarification to documents due to errors or omissions at no additional cost to the government.

b. Attend and assist with site inspections as requested by the COR or CO at the 25%, 50%, 75%, 90%, and final inspection of percent complete for all construction projects.

Government Responsibilities

a. Administration of Contract The Contracting Officer is responsible for the administration of the Contract. No change shall be made in the provision of this Contract without written authorization of the Contracting Officer.

ii. Re-submittal – In the event that documents submitted for review, as described in this document, are deficient or incomplete as specifically defined in the task order for a particular stage of completion, the A-E shall correct the deficiencies and resubmit the documents. No partial re-submittals will be permitted. The Contractor shall assume all costs and schedule requirement due to the re-submittal of documents.

b. Government Furnished Information The Government, through the office of the Contracting Officer, will furnish within five days after issuance of a Task Order, applicable data and information (as available) for the execution of the work described. Data shall be returned to the Contracting Officer upon completion of the individual work order.

iii. Data will include where applicable and available the following:

a. General Site Plan

b. Small scale layout drawing or sketch showing possible arrangement of space (to serve as guide only).

c. Basic floor plan showing locations of project (as required).

d. Existing record drawings as available.

e. Topographic data as available.

f. Existing utilities information as available.

g. Special requirements for preparation of drawings, reports, specifications, cost estimates, and design analysis.

h. Government-furnished equipment list, if applicable.

i. Accuracy of Planning Information. The A-E shall visit the project site to investigate the information shown on the Government Furnished drawings, record (as- built) drawings and other planning documents which are part of this Contract. This information is the best available, but the Government does not guarantee its accuracy or completeness. The A-E investigation of field conditions shall be performed in a competent professional manner in accordance with the Guidelines for OFPM Contractor and A/E Firms Performing Site Investigations, Fieldwork, and Construction at the National Institute of Standards and Technology.

ii. Discrepancies in Planning Information. The A-E shall promptly report to the Contracting Officer in writing any discrepancies between this Contract and the planning information provided by the Government. The A-E shall make no adjustments for this work due to the discrepancy before the Contracting Officer has reviewed the matter and forwarded his determination to the A-E. The A-E's failure to report any such discrepancy discovered or to wait for Contracting Officer's determination shall be at his risk and expense.

iii. The A-E shall always maintain close liaison with the COR by the appropriate means to assure maximum coordination in accomplishment of the work.

iv. The A-E shall advise the COR of any discrepancies, ambiguities and lack of clarity noted in plans and specifications furnished for use in connection with each Task Order.

v. During the execution of the work under each Task Order, the Architect-Engineer shall keep in close liaison with the COR who will coordinate the work with the using agency and other agencies.

vi. All letters, reports, plans, sketches, specifications, estimates, computation sheets and other documents prepared by the A-E shall be marked “FOR OFFICIAL USE ONLY”.

Any other Government furnished property, material, equipment, or information needed in the performance of this requirement will be detailed in each task order.

VII. SCHEDULE OF DELIVERABLES

The A-E Contractor shall prepare drawings using a computer aided drafting system with AUTODESK AUTOCAD 2025 unless otherwise approved.

Specific schedule of deliverables shall be defined for each task order.

Standards of Acceptance: The NIST POC or COR shall review all the above deliverables and respond with an acceptance or request for revision email to the Contractor Point of Contact (POC) within 21 days of receipt of deliverable unless otherwise defined at the task order level.

This section applies to deliverables which must be reviewed and approved for acceptance (e.g., draft plans, drawings, etc.).

VIII. DELIVERY TERMS FOR ITEMS/PRODUCTS

Delivery shall be F.O.B Destination and shall occur in accordance with the delivery due dates provided at the task order level.

FOB Destination means: The contractor shall pack and mark the shipment in conformance with carrier requirements, deliver the shipment in good order and condition to the point of delivery specified in the purchase order, be responsible for any loss of and/or damage to the goods occurring before receipt and acceptance of the shipment by the consignee at the delivery point specified in the purchase order; and pay all charges to the specified point of delivery.

The contractor shall deliver all Line Items to:

The National Institute of Standards and Technology 100 Bureau Drive, Building 301 (C/O POC/COR Name and Building Number) Gaithersburg, MD 20899-1640

***Due to ongoing limited site access of the NIST facilities, the Awardee SHALL confirm with the Designated Government Official and the Contracting Officer prior to ANY shipment to NIST***

IX. SPECIAL REQUIREMENTS

a. Architect-Engineer Qualifications The Architect-Engineer Contractor must submit a completed Standard Form 330, which will contain information about their professional qualifications, to be considered for award as part of the IDIQ Evaluation Process.

b. Ownership of Documents and Intellectual Properties

NIST has ownership of the rights to all CAD files, BIM Model, engineering calculations and Facility Data developed for the Project. NIST may make use of this data following any deliverables. All designs, drawings, specifications, notes, and other work developed in the performance of this Contract shall be and remain the sole property of the Government and may be used on any other work without additional compensation. With respect thereto, the Architect Engineer agrees not to assert any rights and not to establish any claim under the design patent or copyright laws. The Architect Engineer for a period of 3 years after project closeout agrees to furnish and provide access to all retained materials at the request of the Contracting Officer. Unless otherwise provided in this Contract, the Architect Engineer shall have the right to retain copies all such materials beyond such period.

c. Task Order Procedures

The following is a preliminary guide of how procedures will be followed for issuance of a Task Order under this Contract unless otherwise notated at the Task Order level:

1. The Contracting Officer will issue a "Request for Task Order Proposal.” A statement of work and any other related project documents will be attached to the notice. The A/E shall review the documents attached to the notice and formulate any questions that they may have regarding the project.

2. The AE shall identify any issues with the Statement of Work and review the contracting procedures for the project. The A/E will have a chance to perform some preliminary Site Investigation necessary to provide a cost proposal.

3. AE will submit a cost proposal and a preliminary design schedule.

4. Government will review the cost proposal and schedule negotiations as necessary.

5. Government will issue a Task Order

6. Government will issue “Notice to Proceed” for the work.

d. Training

The AE shall provide safety-related training required by applicable OSHA, state and local regulations or standards to affected contractor personnel (including subcontractor personnel) that perform work under this award. Such training may include, for example, training for proper use of PPE, respirator use, fall protection, crane operation, forklift operation; electrical safety, or other safety-related topics.

Maintain records of safety training provided to contractor personnel (including subcontractor personnel) that perform work on this award. The contractor shall make those records available to the contracting officer’s representative (COR), or other authorized personnel within 7 days of receipt of their written request, and annually thereafter or upon request.

Require contractor personnel (including subcontractors) to attend required NIST-specific health or safety training that is required by the award.

e. Liability The A-E shall be liable for, and shall indemnify and hold harmless the Government against, all actions or claims for loss of or damage to property or the injury or death of persons, arising out of or resulting from the fault, negligence, or act or omission of the A-E, its agents, or employees.

X. INSPECTION & ACCEPTANCE

In addition to the inspection and acceptance terms articulated in 52.212-4, the Government reserves the right to perform performance tests and evaluations as defined below to verify specified performance. Specific inspections may be required at the task order level for commissioning services.

Performance Tests:

1. Such tests and evaluations, if performed, shall be conducted within the environment that the task is to be operated. The Contractor has the right to be present during the tests and evaluations, if performed, at the Contractor’s expense.

NIST may choose at its discretion to forgo this part of acceptance testing.

A visual inspection of the equipment will be performed by the NIST POC to identify surface defects or any form of indication that any equipment was damaged during transport to NIST. The Government shall have sole discretion to require repair or replacement of damaged and/or nonconforming supplies at no cost to the Government. The Government at any time prior to acceptance shall reject the equipment due to defects and/or nonconformance. The vendor is responsible for latent defects discovered any time after final inspection. However, the extent of its liability shall be prorated over the useful life of the equipment.

Ownership of the equipment shall be transferred to NIST upon acceptance by the Government.

The Government will test, inspect, and accept or reject the equipment within (10 days) of receipt of the equipment unless otherwise indicated above. The Government reserves the right to conduct quality assurance testing to confirm that a given instrument(s) meets the manufacturer’s and/or the Government’s performance specifications. It is anticipated that the equipment will meet all manufacturer’s specifications and/or the Government’s performance specifications identified in the most recent operations and maintenance manual for each piece of equipment and/or in this document.

Warranty As applicable, the contractor shall warranty the entire system for a period of a minimum of five years after receipt of the service or equipment and shall be in accordance with terms in FAR 52.212-4. Warranty shall commence upon acceptance of the system by the Government and at a minimum shall include the following:

XI. SAFETY ON THE NIST CAMPUS

NIST is committed to maintaining a work environment that safeguards the public and the environment, as well as personnel and property.

If the task order requires field investigation by the Contractor, including subcontractors, at NIST-owned and operated sites, the Contractor shall:

Complete the “A/E Design Consultant Safety Checklist” and provide Activity Hazard Analysis (AHA) if required by the checklist based on the planned activities. Provide this information within 7 days of task order award

NIST will provide a copy of the signed checklist or will provide written comments regarding the AHA within seven (7) days of receipt. The AE will be required to submit a revised AHA within seven (7) days after that to NIST for their review. This cycle may be repeated, if necessary, until NIST determines that the safety plan to be acceptable.

Safety-Related Equipment The AE Contractor shall provide all safety-related equipment required to perform the work under this award, including personal protective equipment (PPE) and other equipment that is required or appropriate to protect contractor personnel and other personnel on the NIST campus.

Contractor-provided personal protective equipment may include hard hats, safety shoes, safety glasses (prescription or standard), respiratory protection (powered air purifying respirator or full-face mask respirator), high visibility clothing and gloves that meet applicable OSHA standards for PPE.

Health Hazard Assessments and Medical Evaluations The AE Contractor shall provide required health hazard exposure assessments, medical evaluations and screenings, and exposure monitoring required by applicable OSHA requirements. Ensure PII information is protected.

Homeland Security Presidential Directive (HSPD)-12 The Contractor (and/or any subcontractor) and its employees who require physical access to NIST facilities or logical access to NIST IT networks or systems must comply with Homeland Security Presidential Directive (HSPD)-12, Policy for a Common Identification Standard for Federal Employees and Contractors; OMB M-05-24; OMB M-19-17; FIPS 201, Personal Identity Verification (PIV) of Federal Employees and Contractors; NIST HSPD-12 policy; and Executive Order 13467, Part 1 §1.2.

Roster The Contractor (and/or any subcontractor) must submit a roster by name, position, e-mail address, phone number and responsibility, of all staff working under this acquisition where the Contractor will develop, can access, or host and/or maintain a government information system(s).

The roster must be submitted to the COR and/or CO within 14 days of the effective date of this contract. Any revisions to the roster as a result of staffing changes must be submitted within 14 days of the change. The COR will notify the Contractor of the appropriate level of investigation required for each staff member. If the employee is filling a new position, the Contractor must provide a position description, and the Government will determine the appropriate suitability level.

Position Sensitivity Designations Requirement

All Contractor (and/or any subcontractor) employees must obtain a background investigation commensurate with their position sensitivity designation that complies with Parts 1400 and 731 of Title 5, Code of Federal Regulations (CFR).

The following position sensitivity designation levels apply to this solicitation/contact: Low Risk

XII. REQUIREMENTS FOR CONTRACTOR PERSONNEL

Safety: The Contractor employee must be responsible for knowing and complying with all installation safety prevention regulations. Such regulations include, but are not limited to, general safety, fire prevention, and waste disposal.

Security: NIST is a restricted campus. An identification badge is required for access and entry into buildings and is shown to the armed Security Police when entering the campus.

Identification Badges: Contractor employees must comply with NIST identification and access requirements. Each Contractor employee must wear a visible identification badge provided by the NIST Security Office.

Vehicle Registration: All Contractor employees must register their vehicles with the NIST Security Office to gain access to the campus. A valid driver’s license, Government-furnished civilian ID, proof of insurance and current registration must be presented to the NIST Security Office, at which time a NIST vehicle pass will be issued. The pass must be displayed on the vehicle in accordance with NIST Security Office instructions.

XIII. PAYMENT SCHEDULE

The Government shall pay the Contractor the contract price per the appropriate clauses as provided in the Contract. Invoice instructions will be provided for each Task Order.

Advance payment is not authorized unless otherwise approved. The Contractor must invoice in the arrears according to the payment schedule. The Contractor shall be paid, in accordance with

Net 30-day payment terms, upon receipt and acceptance of a proper invoice, in accordance with the following schedule:

1. Submission of each deliverable.

2. If applicable, successful demonstration of any technical requirements set forth at the task order level.

3. After receiving an invoice submitted properly, according to all invoice terms and conditions.

NOTE: Partial shipments and partial invoices will not be accepted, unless otherwise requested and accepted by the Contracting Officer prior to award offer. Proposed payment schedules shall be submitted with vendor’s response to the RFQ for consideration.

Federal Holidays

The NIST campus will be closed on all federal holidays. When a holiday falls on a weekend, the holiday is observed on either the Friday prior or Monday after the holiday. Below is a list of federal holidays:

1. New Year’s Day

2. Birthday of Martin Luther King, Jr.

3. Inauguration Day – occurs every fourth year on January 20th

4. Washington’s Birthday

5. Memorial Day

6. Juneteenth National Independence Day

7. Independence Day

8. Labor Day

9. Columbus Day

10. Veterans Day

11. Thanksgiving Day

12. Christmas Day

End of Statement of Work

a. Administration of Contract
***Due to ongoing limited site access of the NIST facilities, the Awardee SHALL confirm with the Designated Government Official and the Contracting Officer prior to ANY shipment to NIST***
IX. SPECIAL REQUIREMENTS
a. Architect-Engineer Qualifications
b. Ownership of Documents and Intellectual Properties
c. Task Order Procedures
d. Training
The AE shall provide safety-related training required by applicable OSHA, state and local regulations or standards to affected contractor personnel (including subcontractor personnel) that perform work under this award. Such training may include, for ...
Maintain records of safety training provided to contractor personnel (including subcontractor personnel) that perform work on this award. The contractor shall make those records available to the contracting officer’s representative (COR), or other aut...
Require contractor personnel (including subcontractors) to attend required NIST-specific health or safety training that is required by the award.
e. Liability
X. INSPECTION & ACCEPTANCE
XI. SAFETY ON THE NIST CAMPUS
XII. REQUIREMENTS FOR CONTRACTOR PERSONNEL
XIII. PAYMENT SCHEDULE

File details come from the government source that posted it. Updated .