This document contains a statement of work and sources sought notice for a Coast Guard logistics support contract. The statement of work requires transportation of vehicles, boats, equipment and supplies from various locations to Puerto Rico for a Coast Guard training exercise from April 7-27, 2024. Services such as water, portable restrooms and showers, laundry, lighting, pest control and fencing are also required at the training sites. The sources sought notice requests capability statements from interested parties by January 30, 2024 to inform the agency's market research prior to potential contract award. Relevant experience and business size information should be included in any responses.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Mobility Operation April FY24

USCG Port Security Unit 309

1. Scope of Work:

a. The Coast Guard is seeking 21 days of direct logistics and direct support, not inclusive of necessary pre- and post- exercise line hauling and barge transport for

PSU 309 Mobility Operations for approximately 230 Coast Guard personnel to conduct a Full Mission Profile (FMP) Field Training Exercise (FTX)

b. The period of performance is 07 APR 2024 – 27 APR 2024 for the actual on-site period. The contractor shall perform logistics before and after to transport equipment as necessary, not to exceed 30 days prior or after the period of performance.

c. Authorized Unit points of contact:

i. Will be provided upon award.

2. Requirements of Contractor:

a. Provide all line hauling and barge logistics to transport the following materials from

Port Clinton, OH to Ceiba, Puerto Rico:

i. (6) 32’ Transportable Port Security Boats w/ trailers

1. Line haul trailers need to be Extendable Removable Gooseneck

Trailers (RGN)

ii. (6) F-450 Trucks

iii. F-Ton All Terrain Forklift

iv. (3) trailered generators

v. (3) Polaris ATVs

vi. (18) ISU Container Units

vii. (10) Gear Pallets

viii. (1) Water Buffalo

b. Provide all line hauling and barge logistics to transport the following materials from

Fort Eustis, VA to Mosquito, Vieques, Puerto Rico:

i. (6) 32’ Transportable Port Security Boats w/ trailers

1. Line haul trailers need to be Extendable Removable Gooseneck

Trailers (RGN)

ii. (6) F-450 Trucks

iii. F-Ton All Terrain Forklift

iv. (3) trailered generators

v. (3) Polaris ATVs

vi. (18) ISU Container Units

vii. (10) Gear Pallets

viii. (1) Water Buffalo

c. Provide all line hauling and barge logistics to transport the following materials from

Clearwater, FL to Mosquito Pier in Vieques, Puerto Rico:

i. (1) 32’ Transportable Port Security Boats w/ trailer

1. Line haul trailers need to be Extendable Removable Gooseneck

Trailers (RGN)

ii. (5) Gear Pallets

iii. (2) trailered generators

iv. (3) ISU Container Units

d. Contractor to provide three-week supply of bottled water for 125 personnel at Ceiba, Puerto Rico and three-week supply of bottled water for 125 personnel at Vieques, Puerto Rico.

e. Contractor to provide portable restrooms, hand washing stations, and portable showers for 125 personnel at Ceiba, Puerto Rico and 125 personnel at Vieques, Puerto Rico for the period of performance.

f. Garbage collection to account for 125 personnel at Ceiba, Puerto Rico and for 125 personnel at Vieques, Puerto Rico.

g. Laundry service for 125 personnel at Ceiba, Puerto Rico, and 125 personnel at

Vieques, Puerto Rico, provided at the one-week and two-week mark.

h. Provide eight portable light towers at Ceiba, Puerto Rico, and eight portable light towers at Vieques, Puerto Rico.

i. Organize a Tactical Combat Casualty Course training coordinator to provide training to personnel in both Ceiba and Vieques, Puerto Rico during the period of performance.

j. Provide videography of key exercise events in the vicinity of Vieques from April 15

–25, 2024.

k. 1400’ Portable Fence installed at the Vieques event location, and torn down at the conclusion of the event.

l. Provide Pest control at the Vieques location prior to the beginning of the event and as needed during the event to control rodents and other pests.

u.Contractor shall provide Drone video footage and photography support of entire event v.Contract portable military tower system to act as over watch during event.

3.Allowed Contract Charges:

a.The Government will only pay for the items/services required on the purchase order itself.

b.The Government is exempt from Federal, State, Territory, and local taxes.

4.Admin:a.Contractor shall provide a copy of the final invoice and folio to the following:

Will be provided upon award.