Statement of Work - 860th Cabinet Installation.pdf
PDF 74 KB Posted
- Attached to
- 860 AMXS Cabinet Installation Federal contract opportunity
- Solicitation number
- FA442724Q0128
About this file
This document is a Statement of Work (SOW) for the installation of kitchen cabinets in the Hangar 837 breakroom for the 860th Aircraft Maintenance Squadron. The key requirements are:
The contractor shall remove the existing kitchen cabinets, base, associated plumbing, and hardware, conduct post-removal repairs and wall preparation, and install new laminate or hardwood kitchen cabinets, drawers, and hardware. The cabinet configuration and color shall be similar to the existing layout (see attached pictures for reference). The contractor shall also transport, furnish, and install the new cabinets, remove and dispose of all old materials, and clean the new and existing kitchen components. Special requirements include performing work with minimal disruption to the occupied facility and correcting any damage caused by the project.
This SOW is associated with a federal contract opportunity (Solicitation Number FA442724Q0128) issued by the Department of the Air Force Air Mobility Command to provide the cabinet installation and associated services outlined in the SOW.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers Excel.xlsx | XLSX spreadsheet | |
| Combo - 860 AMXS Cabinet Installation - Amendment 002.pdf | ||
| Enlarged Floor Plan - Admin Area.pdf | ||
| Combo - 860 AMXS Cabinet Installation - Amendment 001.pdf | ||
| Enlarged Finish Plan - Admin Area.pdf | ||
| Questions and Answers Excel.xlsx | XLSX spreadsheet | |
| Cabinet Install Pictures 2.pdf | ||
| Floor Power Plan - Admin Area.pdf | ||
| Combo - 860 AMXS Cabinet Installation.pdf | ||
| Cabinet Install Pictures.pdf | ||
| Travis AFB Contract Security Requirements.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) for
Hangar 837 Breakroom Kitchen Cabinets
860th Aircraft Maintenance Squadron has a requirement to replace the kitchen cabinets in the Hangar 837 breakroom.
Description: The following outline of the principal features of work does not in any way limit the responsibility of the contractor to perform all work and furnish all materials to do a complete removal and installation of the kitchen cabinets, base, associated plumbing, and associated hardware within the intent of the specifications, sketches, drawing, and contract.
1. The contractor shall remove existing kitchen materials i.e., cabinets, base, associated plumbing, associated hardware. The existing kitchen countertop shall be reused for new installation.
2. The contractor shall conduct all post-removal repairs, wall preparation, and paint.
3. The contractor shall use paint that matches the current room wall color of white.
4. The contractor shall transport, furnish, and install new kitchen cabinets, base, associated plumbing, and associated hardware. Cabinet color shall be similar to the current color (See Attachment 0001 – Cabinet Install Pictures for reference).
5. The contractor shall remove and dispose of all removed cabinets and materials, debris, scraps, trash, etc.
6. The contractor shall clean new kitchen cabinets, existing countertop, sink, and work area of dust, debris, dirt, trash, etc.
Minimum Salient Characteristics:
- Laminate or hardwood cabinets
- Drawers and cabinets designed and built for added rigidity
- The cabinet configuration shall be similar to the current configuration and color (See Attachment 0001 – Cabinet Install Pictures for reference)
- Cabinets will be added above the sink
- There will be two cubby holes to fit a large microwave (the current microwave measures at 32” long x 16” deep x 17” tall)
- All cabinets and drawers will have handles
- Cabinets will have soft close hinges
Special Regulations to Meet: All materials and work will be environmentally safe meeting all requirements of local, state, and federal environmental agencies.
Special Requirements: The facility and adjacent area(s) will likely be occupied and utilized during the project phase(s). The contractor shall perform work in such a manner as to cause the minimum of interference to the facility and the surrounding area. The contractor shall be responsible for correcting any damage caused by or incidental to, this project. Upon contractor request, the occupant will remove any items, as necessary, to facilitate their unimpeded completion of the project.