Statement Of Work 47317 Crack open bridge console.docx

DOCX document 439 KB Posted

Attached to
47FT VESSEL BRIDGE CONSOLE WELD REPAIR
Solicitation number
70Z04023QSBPL0092
Issued by

About this file

This statement of work outlines requirements for general welding repairs to a port open bridge control console aboard a Coast Guard vessel. The contractor will be required to repair a crack on the port open bridge control console, perform nondestructive evaluation of the repair, and prepare and coat any new or disturbed exterior and interior surfaces. The period of performance is 21 calendar days at the Coast Guard facility in Ilwaco, Washington. The contractor must submit credentials of the certified welder and qualified weld inspector, as well as the qualified weld procedure specification to be used. The contractor is responsible for maintaining safe conditions for hot work in accordance with OSHA regulations. Upon completion, the contractor must submit documentation including the weld procedure, repairs performed, inspection results.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX A (Commercial repairs)

WORK ITEM SPECIFICATION: GENERAL WELDING, PROVIDE

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to provide general welding repairs as outlined in Paragraph 3.2.1.

· Repair and weld crack Port Open Bridge Control Console

1.2 Government-furnished property.

NONE

2. REFERENCES

Coast Guard Drawings None Coast Guard Publications Coast Guard Technical Publication (TP) 4934, SWBS 074, Sep 2014, Small Boat Diagrams for Hotwork Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

3. REQUIREMENTS

3.1 General.

3.1.1 Period of Performance. The period of performance of this contract shall not exceed 21 calendar days from the date of award.

3.1.2. Place of Performance. The primary place of performance will be the United States Coast Guard at 322 Coast Guard RD Ilwaco, WA 98624

3.1.3. Hours of operation. Contractor employees shall generally perform all work between the hours of 0800 – 1600 local time, Monday through Friday. However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW.

3.1.4 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.5 Interferences. The Contractor shall remove all interferences in way of specified work, as necessary, and restore all removed interferences upon completion of the specified work. The Contractor may exercise the discretion to work around certain interferences, when possible, so long as the specified work is successfully accomplished.

3.1.6 Credentials and Specifications. The Contractor shall submit the credentials of the Certified Welder and Qualified Weld Inspector, and the qualified Weld Procedure Specification (WPS) to be utilized, to the CG representative.

3.1.7 Safe for hot work conditions. The Contractor shall provide the services of a Marine Chemist to certify the vessel as “Gas Free” IAW 29 CFR 1915.15, and maintain that condition through the completion of the work.

3.2 Requirement. The Contractor shall provide general welding including, but not limited to; fabrication, brazing, inspection, plate renewal, crack repair, overlay, and associated processes on Coast Guard vessels and/or equipment.

3.2.1 Repair. The Contractor shall repair the following:

· Repair and weld crack on Port Open Bridge Control Console

3.2.2 Post Repair Testing. The Contractor shall perform a Nondestructive evaluation (NDE) of repair(s). Include type(s) of NDE performed and results in documentation required by 3.4 below.

3.3 Touch-up preservation, general. The Contractor shall prepare and coat any new or disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces.

3.4 Documentation. Within 24 hours of completion of repair work the Contractor shall submit to the CG representative a report including, but not limited to:

· Weld procedure utilized

· Repairs performed

· Inspections completed & results of inspections

4. Attachments.

image2.jpeg image1.jpeg