Statement of Work - 363d ISR Targeting Center Signage.pdf
PDF 402 KB Posted
- Attached to
- 363d ISR Targeting Center Signage
- Solicitation number
- FA480025Q0052
About this file
This Statement of Work (SOW) details signage replacement for the Air Force Targeting Center (AFTC) at Langley AFB, VA. The project requires demolishing the existing "363D ISR GROUP" exterior sign, repairing brickwork, and installing a new 80' wide by 3.5' tall tan-colored sign reading "AIR FORCE TARGETING CENTER". The contractor must comply with multiple regulatory standards including Unified Facilities Criteria, Air Force Corporate Facilities Standards, and the 2018 International Building Code. Key requirements include coordinating with the Contracting Officer and Project Manager, protecting adjacent property during installation, disposing of debris daily, and providing a minimum one-year warranty on services and installed equipment. Work is limited to normal business hours (Monday-Friday, 8:00 am to 4:00 pm), with potential for after-hours work if approved 14 days in advance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation - FA480025Q0052.pdf | ||
| Wage Determinaton 2015-4341 Rev 31.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
AIR FORCE TARGETING CENTER (AFTC) SIGNAGE
1. Demolition and Removal
1.1. The contractor shall demolish and remove existing exterior “363D ISR GROUP” sign and repair respective holes in exterior brickwork and mortar.
2. Project Scope Requirements
2.1. Fabricate and install an exterior facility sign stating "AIR FORCE TARGETING CENTER" centered in the requested location at Langley AFB, VA (see Figure 1).
2.2. Signage shall be size 80’ wide and 3.5’ tall to fit in the requested space (Figure 2) and signage color shall be tan color to closely match the mortar.
3. Regulatory Compliance and Standards
3.1. All work shall be in strict compliance with all applicable codes, references, and standards:
3.1.1. All applicable Unified Facilities Criteria (UFC) and applicable Unified Facility Guide Specifications (UFGS). This are posted at:
https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc).
3.1.2. Air Force Corporate Facilities Standards (AFCFS) located at:
https://afcfs.wbdg.org. This document is an interactive online tool.
3.1.3. Langley Air Force Base Installation Facilities Standards.
3.1.4. UFC 1-200-01 DoD Building Code (General Building Requirements).
3.1.5. UFC 3-201-01, Civil Engineering.
3.1.6. International Building Code (IBC) 2018.
3.2. Installation Services
3.3. The Contractor shall be responsible for providing a complete and usable product/system and shall be responsible for accomplishing all tasks outline herein, drawings, and specifications.
3.4. Facility/User Coordination
3.4.1. Project Coordination: All work shall be coordinated with the Contracting Officer (CO) in conjunction with the Project Manager (PM); the PM shall coordinate with the facility manager.
3.5. Staging, Storage, and Parking
3.5.1. The Government will designate an area for installation, staging and storage. The exact location will be discussed and determined in the pre-installation meeting. The location shall not impede access for emergency response vehicles and personnel.
https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc
3.5.2. Parking shall be in designated parking spaces and in designated parking areas. Exact areas designations to be discussed during the pre- installation meeting. Parking will not be allowed on sidewalks or grass areas.
3.5.3. Installation shall not commence without prior coordination with CO, Civil
Engineering (CE), and PM.
3.6. Availability of Site
3.6.1. Normal workdays are Monday through Friday, 8:00 am to 4:00 pm, excluding Federal holidays and family days.
3.6.2. Holidays: All Federal holidays are observed and are not considered duty days.
3.6.3. Work after business hours, on weekends, or federal holidays will be allowed if requested 14 days in advance to the CO in writing for approval and not interfere with base or user’s missions. After business hours, Federal holidays, and weekend work requests are dependent on the user’s ability to support the request.
3.7. Site Protection, Cleanup, Repair or Replace, and Differing Site Conditions
3.7.1. Ensure that all adjacent property, buildings, and contents are protected from dust, dirt, runoff, debris, and other damages resulting from project activities.
The contractor shall provide plastic sheeting, covering of ventilation, and the use of sticky mats to minimize the transfer of installation dust and debris to the occupied areas of the building during installation. Contractor shall ensure that all trash and debris shall be disposed of on a regular basis.
3.7.2. Blockages or obstructions of any doorway or building egress shall be coordinated with the PM.
3.7.3. Replace or Repair: Contractor shall replace or repair to match original existing conditions, all existing adjacent finished surfaces, utilities, equipment, products, vegetation, and structures or parts thereof that have been damaged or removed to perform the work. Contractor shall inform the CO, PM, and CE in sufficient time to permit scheduling of all work prior to being enclosed.
3.7.4. Contractor shall ensure that all non-recyclable trash, debris, refuse, garbage, etc. is disposed of daily.
3.8. Warranty. Contractor shall at minimum furnish an overall one-year warranty on services/workmanship performed and any equipment/items the Contractor purchases/installs for this effort. The warranty shall take effect upon the Beneficial Occupancy Date (BOD) by the Government after installation is completed.
Contractor shall coordinate with any/all manufacturers’ extended warranties for special components and systems. Extended warranties shall identify exactly what component or system is being warrantied and the duration of the warranty. The specifications prepared by the Contractor shall include all specific extended warranty requirements for special components and systems.
Figure 1: Air Force Targeting Center Photo
Figure 2: Air Force Targeting Center Dimensions and Signage Location