This Statement of Work outlines requirements for certifying lifting equipment at the USCG Yard in Baltimore, MD, covering three work items: certification of an 87' WPB spreader bar, an 87' WPB docking cradle, and a 65' WYTL spreader bar. Each item requires inspection services to meet SFLC Standard Specification 8634 requirements, with no re-load testing needed as the equipment was previously load tested.
The contractor must complete all work within 30 days of contract award and deliver certification reports for each item that include a Professional Engineer's (Maryland) signature and seal, completed appendices B-2, B-23, and B-24, inspection findings, surveyor's endorsement, and NDT weld test reports. The related solicitation (70Z04025Q60217Y00) indicates this will be awarded as a firm-fixed-price purchase order using simplified acquisition procedures, with quotes due by January 31, 2025, at 8:00 AM Eastern. Award will be made on a lowest-price technically acceptable basis, with payment terms of Net 30 through the IPP system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70Z04025P60217Y00 RFQ.docx | DOCX document | |
| Smart Matrix Acquisition.GOV.pdf | ||
| WAGE DETERMINATION.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purchase Request # 2125405Y6175K99002 Statement of Objectives
WI-001: 87’ WPB Lift Rig - Spreader Bar Recertification
1. SCOPE
Intent: The Contractor shall provide services to certify 01 spreader bar.
2. REFERENCES
COAST GUARD PUBLICATIONS
· Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2014, Drydocking
· United States Coast Guard Drawing No. 87WPB 085-12, Rev -- , 87 Ft Coastal Patrol Boat Lifting Cradle
OTHER REFERENCES – Available post-award upon request
· Previous certification reports
· Docking history
· Last Non-Destructive Inspection (NDI) Report
· Last completed load test
3. REQUIREMENTS
3.1 The Contractor shall conduct all necessary inspections required to certify 01 spreader bar, constructed in accordance with referenced drawings. Certification shall meet requirements stated within SFLC STD Spec 8634. Certifying Authority shall provide requirements for type of weld inspection and length of weld inspection required for certification. The cradle has been previously load tested; re-load testing is not required.
3.2 Location: All inspections shall be conducted at USCG Yard, Baltimore MD 21226.
3.3 Period of Performance: All work and applicable deliverables shall be provided within 30 days of award of contract.
3.4 Deliverable Requirements: Contractor shall provide a Certification Report, which shall include – at minimum – the following:
3.4.1 Appendix B-2 (of SFLC STD Spec 8634), signed and sealed by a Professional Engineer (State of Maryland)
3.4.2 Appendix B-23 and Appendix B-24 of SFLC STD Spec 8634, completed.
3.4.3 Inspection Overview
3.4.4 Proof Testing, as applicable.
3.4.5 Inspection Findings with supporting documentation, as applicable.
3.4.6 Surveyor’s Endorsement, annotated as “SATISFACTORY” or “UNSATISFACTORY”. Any contingencies to endorsement must be clearly noted.
3.4.7 NDT Weld Test Report
WI-002: 87’ WPB Lift Rig - Cradle Recertification
1. SCOPE
1.1 Intent: The Contractor shall provide services to certify 01 docking cradle.
2. REFERENCES
COAST GUARD PUBLICATIONS
· Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2014, Drydocking
· United States Coast Guard Drawing No. 87WPB 085-12, Rev A, 87 Ft Coastal Patrol Boat Lifting Cradle
OTHER REFERENCES – Available post-award upon request
· Previous certification reports
· Docking history
· Last Non-Destructive Inspection (NDI) Report
· Last completed load test
3. REQUIREMENTS
3.1 The Contractor shall conduct all necessary inspections required to certify 01 docking cradles, constructed in accordance with referenced drawings. Certification shall meet requirements stated within SFLC STD Spec 8634. Certifying Authority shall provide requirements for type of weld inspection and length of weld inspection required for certification. The cradle has been previously load tested; re-load testing is not required.
3.2 Location: All inspections shall be conducted at USCG Yard, Baltimore MD 21226.
3.3 Period of Performance: All work and applicable deliverables shall be provided within 30 days of award of contract.
3.4 Deliverable Requirements: Contractor shall provide a Certification Report, which shall include – at minimum – the following:
3.4.1 Appendix B-2 (of SFLC STD Spec 8634), signed and sealed by a Professional Engineer (State of Maryland)
3.4.2 Appendix B-23 and Appendix B-24 of SFLC STD Spec 8634, completed.
3.4.3 Inspection Overview
3.4.4 Proof Testing, as applicable.
3.4.5 Inspection Findings with supporting documentation, as applicable.
3.4.6 Surveyor’s Endorsement, annotated as “SATISFACTORY” or “UNSATISFACTORY”. Any contingencies to endorsement must be clearly noted.
WI-003: 65’ WYTL Lift Rig - Spreader Bar Recertification
1. SCOPE
Intent: The Contractor shall provide services to certify 01 spreader bar.
2. REFERENCES
COAST GUARD PUBLICATIONS
· Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2014, Drydocking
OTHER REFERENCES – Available post-award upon request
· Previous certification reports
· Docking history
· Last Non-Destructive Inspection (NDI) Report
· Last completed load test
· McLean Drawing LB_72
· McLean Drawing LP_15_A-D
3. REQUIREMENTS
3.1 The Contractor shall conduct all necessary inspections required to certify 01 spreader bar, constructed in accordance with referenced drawings. Certification shall meet requirements stated within SFLC STD Spec 8634. Certifying Authority shall provide requirements for type of weld inspection and length of weld inspection required for certification. The cradle has been previously load tested; re-load testing is not required.
3.2 Location: All inspections shall be conducted at USCG Yard, Baltimore MD 21226.
3.3 Period of Performance: All work and applicable deliverables shall be provided within 30 days of award of contract.
3.4 Deliverable Requirements: Contractor shall provide a Certification Report, which shall include – at minimum – the following:
3.4.1 Appendix B-2 (of SFLC STD Spec 8634), signed and sealed by a Professional Engineer (State of Maryland)
3.4.2 Appendix B-23 and Appendix B-24 of SFLC STD Spec 8634, completed.
3.4.3 Inspection Overview
3.4.4 Proof Testing, as applicable.
3.4.5 Inspection Findings with supporting documentation, as applicable.
3.4.6 Surveyor’s Endorsement, annotated as “SATISFACTORY” or “UNSATISFACTORY”. Any contingencies to endorsement must be clearly noted.