This is a Statement of Work (SOW) for USGS contract work focused on enhancing the Land Use and Carbon Scenario Simulator (LUCAS) model to improve wildfire risk assessment and fuel load tracking across the conterminous United States.

The contractor will provide two categories of deliverables: (A) General Technical Support, including configuration and parameterization of fuel load variables and fire transition probabilities, processing external remote sensing vegetation data for model inputs, developing post-processing analytical tools to generate fire-risk maps and hazard assessments, and collaborating on scientific publications and reports; and (B) Software Enhancements to the SyncroSim/ST-Sim platform, including new features for simulating complex fire-regime interactions and fuel treatment effectiveness, code modifications to improve scaling for large-area wildfire simulations, updated documentation and training materials, and ensuring compatibility with current USGS data standards and high-performance computing environments. The Performance Assessment Plan establishes detailed monitoring standards across multiple dimensions: timeliness requirements (deliverables by Task Order dates, technical support responses within 3 business days, 10 business day advance notice for at-risk milestones), software delivery specifications (repository-based releases, direct scripts/data files, platform updates with documentation), internal quality review confirmation, documentation sufficiency for qualified USGS scientists to independently understand and reproduce work, demo sessions where scoped, data reproducibility standards, parameterization review sign-off prior to full model runs, formal 15 business day acceptance process with 10 day contractor response period, and progress reporting requirements (quarterly written updates and meetings for Task Orders exceeding 90 days).

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Introduction

Understanding the e ects of land use and land cover (LULC) change and ecosystem disturbances on wildfire vulnerability and fuel loading is a critical requirement for national safety and resource management. Modeling how changes in vegetation and land management influence fire behavior is a priority goal identified for the USGS Ecosystems Mission Area. The USGS has previously developed methodologies to quantify past and current LULC change and project future scenarios, linking these data with ecological models to estimate how "fuels"—represented by biomass and carbon stocks—accumulate and interact with natural disturbances over space and time.

While initial assessments provided a foundation for understanding landscape change, significant technical gaps remain regarding the integrated linkage between LULC dynamics and wildfire risk. Specifically, there is a need for an integrated, easy-to-use, open-source model that emphasizes the spatial and temporal variability of fuel loads and the resulting fire consequences. Through a collaboration between a contractor and USGS, a proof-of-concept model was developed: the Land Use and Carbon Scenario Simulator (LUCAS).

Built upon the SyncroSim/ST-Sim state-and-transition simulation modeling framework, this tool was designed to produce reliable estimates of changes in LULC and the associated biomass (carbon) stocks that serve as primary fire fuels.

The next phase of this e ort involves refining the model to better simulate fire regimes, fuel transitions, and the impact of various land-management strategies on fire risk. This includes structural improvements to how the model treats biomass accumulation and decay, enhancements to fire-spread visualization, and the ability to run high-resolution simulations in high-performance computing environments.

The USGS seeks to continue the development of this model to track land-based fuels and fire risk across the conterminous U.S. This contract supports the development of operational and scientific improvements to the model, focusing on its ability to project how natural and anthropogenic processes—including climate change, urbanization, and land management—alter the wildfire landscape.

As specified in this contract, the Contractor will design and complete enhancements to the ST-Sim software as requested and approved by the USGS Point-of-Contact to support these wildfire and land-use objectives.

Deliverables

Anticipated deliverables are divided into two categories and will be specifically defined as individual tasks:

A. General Technical Support Provide technical support to the USGS in the use, application, and customization of the SyncroSim/ST-Sim software module. This includes:

• Assisting in the configuration and parameterization of fuel load variables and fire transition probabilities.

• Calculating and processing external data (e.g., remote sensing vegetation data) to provide input model parameters.

• Developing post-processing analytical tools to translate model outputs into fire-risk maps and hazard assessments.

• Collaborating on scientific meetings, publications, and reports regarding LULC-driven fire dynamics.

B. Software Enhancements Provide software enhancements to the SyncroSim/ST-Sim application to support ongoing program requirements. This includes:

• Adding new features to simulate complex fire-regime interactions and fuel treatment e ectiveness.

• Modifying underlying code to improve the scaling of large-area wildfire simulations.

• Updating documentation and training materials to reflect new wildfire-centric modeling capabilities.

• Ensuring ongoing compatibility of the software with current USGS data standards and high-performance computing requirements.

Performance Assessment Plan / Monitoring Methods

Description / Desired Outcome

Performance Standard Monitoring Method

Timeliness – scheduled deliverables

Deliverables submitted by dates specified in each Task Order.

Review of deliverable submission dates against Task Order schedule at each progress meeting.

Timeliness – technical support responses

Written or verbal responses to USGS technical inquiries provided within 3 business days, Technical Liaison tracks response times on an ongoing basis; flagged if unless a longer timeline is mutually agreed.

pattern of late responses emerges.

Timeliness – at-risk milestones

If a milestone is at risk, Contractor notifies USGS Technical Liaison and Contracting Officer in writing at least 10 business days in advance with explanation and revised schedule.

Technical Liaison evaluates whether advance notice was provided and revised schedule is reasonable.

Software delivery – repository-based (e.g., LUCAS, WISDM)

Functional release or tagged commit delivered to designated public repository, with written Technical Liaison notification upon release.

Technical Liaison confirms release availability in repository and reviews release notes.

Software delivery – direct scripts and data

Task-specific scripts and data files delivered in agreed formats, with documentation sufficient for a qualified USGS scientist to understand and run the materials.

Technical Liaison reviews delivered files for completeness against Task Order SOW.

Software delivery – SyncroSim platform updates

Functional software release incorporating specified enhancements is made available, with written Technical Liaison notification and updated documentation.

Technical Liaison installs release and confirms specified features are functional as described in Task Order SOW.

Internal review prior to delivery

Contractor confirms in writing that all deliverables have been internally reviewed prior to submission.

Written confirmation reviewed by Technical Liaison as part of acceptance process.

Quantitative performance targets (where applicable)

Where Task Order specifies quantitative targets (e.g., model calibration thresholds, processing speed benchmarks), these are met or exceeded.

Technical Liaison or designated evaluator evaluates outputs against specified targets.

Documentation – general

All deliverables include documentation sufficient for a qualified USGS scientist to independently understand, use, and reproduce the work.

Technical Liaison reviews documentation as part of formal acceptance review.

Documentation – software features

Each new software feature accompanied by updated user-facing documentation (e.g., help

Technical Liaison confirms documentation is present page, vignette, or user guide section).

and covers new functionality.

Demo sessions (where scoped)

Where included in the Task Order as a line item, Contractor delivers a demonstration session for significant new model features.

Technical Liaison confirms session was held and key USGS users attended.

Data and reproducibility

All model inputs, outputs, and analytical scripts associated with task deliverables are delivered to USGS upon task completion, in formats specified in the Task Order. Results are reproducible from delivered materials.

Technical Liaison spot-checks reproducibility by running delivered scripts against delivered inputs.

Parameterization review

For parameterization tasks, model parameters are reviewed and accepted by USGS technical liaison prior to the full model run.

Written sign-off by Technical Liaison before full run is initiated.

Formal acceptance process

Upon delivery, USGS Technical Liaison has 15 business days to provide written acceptance or written comments. Contractor has 10 business days to address comments and resubmit. Final written acceptance required before task is complete for invoicing.

Technical Liaison tracks acceptance correspondence;

contracting records maintained for each Task Order.

Progress reporting – written updates

For Task Orders with period of performance exceeding 90 days, Contractor provides written progress updates at least quarterly covering work completed, work planned, budget status, and any risks.

Technical Liaison reviews progress reports; flags if reports are missing or inadequate.

Progress reporting – meetings

For longer or more complex Task Orders, quarterly meetings with Technical Liaison are held as scoped in the Task Order.

Meetings may be in-person or virtual as mutually agreed.

Technical Liaison confirms meetings are held on schedule; meeting notes maintained.