Statement_of_Work_070621_20210818000409.557_X.pdf

PDF 200 KB Posted

Attached to
CUSTOM HOLDERS Federal contract opportunity
Solicitation number
80NSSC211931
Issued by
National Aeronautics and Space Administration Shared Services Center

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements Mechanical holders, covers, plates, frames, posts and washers..

2. Characteristics, Scope, and Specs The contractor shall provide the following mechanical items:

5 Shield detector lamp 10 Holder detector lamp

2 Cover top lamp 13 Collimator plate 4 Frame PCB .740” 4 Frame PCB .540” 4 Mounting foot 2 Cover Bottom 10 Foil plate .020” thk.

4 Frame PCB .700” (10x10cm) 4 Frame PCB .480” (10x10cm)

4 OPENING_REPELLER_PLATE_IONIZER

4 REPELLER_PLATE_IONIZER

8 POST_IONIZER

4 BASE_IONIZER

12 Shoulder washer 12 Shoulder isolator washer

3. Place of Performance Vendor facility

4. Period of Performance The estimated period of performance or lead-time for delivery is 6 months ARO.

File details come from the government source that posted it. Updated .