Statement of Requirements.pdf
PDF 538 KB Posted
- Attached to
- Replace Entrance Sign, Front Gate Federal contract opportunity
- Solicitation number
- W50S7K-21-R-0019
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid sheet.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Requirements to Replace Entrance Sign, Front Gate
Contractor shall field verify all site conditions, quantities, measurements, and project requirements.
Contractor shall protect all structures, utilities, vegetation, sidewalks, and vehicles from damage at all times. Replace all damaged materials with new materials to the satisfaction of the Government, at no additional cost to the Government.
Contractor shall bring any differing site conditions or unforeseen project conditions to the attention of the CO immediately. Differing site conditions, which may alter the scope of work, shall be approved by the CO prior to such work being performed.
Contractor shall ensure any and all new components are compatible with existing components not being replaced.
All work performed must adhere to manufacturer’s instructions and applicable NEC requirements.
The contractor shall properly dispose of all removed components, debris, and waste from work site daily.
The project will consist of replacing an outdated dual sided, stand alone, monument sign that has reached the end of its service life and is currently non-operational.
Current sign has (2) 20 Amp Breakers and conduit in place
Current Sign has (2) 88” x 33” screen panels
Current Sign has 12’ x 4’ foundation pad
Current Sign monument has cosmetic damage from age and wear and tear. Monument is a medal frame, with aluminum panels and sprayed stucco finish.
Contractor will furnish and install one (1) double-sided, monument style, outdoor LED 36” x 96” sign.
The contractor shall supply and install electric power wiring, fiber optic communication cable and all required power supply systems and surge suppression systems per manufacturer.
Acceptable Display Resolution: 6mm, 8mm or 10mm
Connectivity: Stand Alone Network, Sign will be hardwired to Laptop that must be programmed offline.
Electrical: Current sign conduit will be used for new electric power wiring and fiber optic or other acceptable communication cable.
Monument: Current sign foundation will be used. New monument must fit on 12’ x 4’ Foundation pad.
New monument must have: “Air National Guard Combat Readiness Training Center”. New Monument colors will match current sign. (See Appendix 1)
Warranty: Contractor will provide One (1) Year Workmanship warranty and Five (5) Year Material warranty.
Statement of Requirements to Replace Entrance Sign, Front Gate
Front of Current Sign
Back of Current Sign
File details come from the government source that posted it. Updated .