Statement of Requirement (SOR)

42 CES/CEF

1.0 PURPOSE: INSTALL HEAT INSULSTION MATERIAL IN FIRST FLOOR BURN ROOM

MAXWELL FIRE DEPARTMENT TRAINING BRUN HOUSE.

2.0 DESCRIPTION OF REQUIREMENT. The contractor shall meet the following objectives for performance under this contract: Remove and replace existing burn liner in Maxwell AFB’s WHP Structural Fire Trainer. 1st floor burn room, 666 Ft2 wall and 342 Ft2 Ceiling) allowing for a total of w/5% overage = 1,060 Ft2. Does not include doors and shutters. Contractor must be trained and have experience in providing this type of service. All installations shall be IAW with Environmental Protection Agency (EPA) and National Fire Protection Association (NFPA), NIOSH, OSHA Standards. Materials such as tin/or materials fabricated solely of all metal and or sheetrock or materials made of similar materials are not requested. Installing burn liner/insulation in 1st floor burn room will enable the department to meet the proficiency training as mandated IAW AFI 32-2001 and AFMAN 6055.6

2.1. SPECIFICATIONS:

2.1.1 (Add burn liner specifications here. What standard must the liner meet? Heat resistance standards? Are meeting EPA and NFPA standards enough as listed above?)

2.1.2 Contractor will provide training on care and maintenance of installed materials

2.1.3 Contractor will perform an operational test and inspection on the installed burn room liner/insulation.

3.0 DELIVERY REQUIREMENTS:

3.1 Delivery location: Maxwell Fire Department fire training site bldg. 1217

4.0 INSTALLATION REQUIREMENTS: CONTRACTOR WILL INSTALL ALL MATERIALS IN

ACCORDANCE WITH MANUFACTURES SPECIFICATIONS

5.0 TRAINING REQUIREMENTS: Contractor will offer training on care and maintenance of installed Materials.

6.0. STANDARD WARRANTY: Contractor must offer 24-7-365 telephone support, n materials at no additional cost to the Government.

6.1 Prior to project acceptance, the contractor shall provide the customer with all manufacturer warranties as needed for any component incorporated into this project such as equipment manuals, literature, CDs and DVDs and other documentation on all equipment and software if applicable.

6.2 Prior to project acceptance, the contractor shall provide written procedures, points of contact within company, and required information for all warranty services prior to project acceptance. This information shall include written confirmation of the warranty period, phone numbers and contact information/procedures for technical support, troubleshooting assistance, and replacement of faulty equipment.

7.0 GENERAL INFORMATION: ITEMS MUST BE BRAND NEW. REFURBISHED ITEMS ARE NOT AUTHORIZED.

KERSEY, JEREMY B GS-13 USAF AETC 42 CONS/LGCA