Statement of Objectives - Lighting Replacement - West Hartford (CT011).pdf
PDF 566 KB Posted
- Solicitation number
- W15QKN24RA001
About this file
This document is a Statement of Objectives (SOO) for a federal contract opportunity to replace the parking lot lighting at the Berry-Rosenblatt Army Reserve Center (AFRC) in West Hartford, Connecticut.
The overall objective is to replace and install 18 solar-powered lighting poles to illuminate the facility entrance, walkways, and parking area. The general requirements include installing the solar-powered lighting poles along the sidewalks and parking area. The impact of the current deficiency is poor visibility and safety concerns during early morning, late evening, fall, and winter seasons. The expected result of the completed project is the installation of 18 solar-powered lighting poles at the specified locations.
The related federal contract opportunity is a sources sought notice for the replacement of the parking lot lighting at the same location. The contractor shall provide all labor, equipment, materials, transportation, supervision, and technical expertise to replace the parking lot lighting in accordance with the specifications. The anticipated period of performance is from September 2025 to January 2026, with work to be performed between 0730 and 1600, Monday through Friday, excluding federal holidays. Interested contractors are invited to submit a statement of interest with specified information by August 7, 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Objectives
99th Readiness Division Directorate of Public Works Fort Dix, New Jersey 08640
The Statement of Objectives (SOO) identifies the broad, basic, top-level objectives of an acquisition/procurement.
Date: 12/13/2023 Title: Replace Parking Lot Lighting CSS# 91090 RFOS: Louis Corbo
Center: Berry-Rosenblatt AFRC
(CT011)
Field Eng. Tech.: Gabriel Yang
Address: Quaker Ln S AFOS: Thomas Oconnor West Hartford, CT 06110 BLDG MGR:
Other POC:
Other POC:
1. Overall Objective:
Replace and install eighteen solar lighting pole to illuminate the facility entrance, walkways, and parking area located at the MEP lots.
2. General Requirements:
Install eighteen solar powered lighting poles, along the sidewalks and parking area.
3. Impact of Deficiency:
Life/Health/Safety. The entrance and majority of the back MEP area is not illuminated. Early morning and late evening visibility is poor, and visibility during the Fall and Winter seasons is non-existent.
4. Rough Estimate(s):
5. Expected Results of Completed Project:
Eighteen solar powered lighting poles, installed at the locations per the attached drawing.
6. Attachments:
File details come from the government source that posted it. Updated .