Statement of Objectives.pdf

PDF 10 KB Posted

Attached to
Door and Windows Replacement - USCG Station Sault Saint Marie - Michigan
Solicitation number
2121301PCV490
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR #: 2121301PCV490

STATEMENT OF OBJECTIVES

LAST UPDATED: 05/20/2021 PAGE 1/1

STATEMENT OF OBJECTIVES (SOO) FOR SAM PROJECT 17429552, PR

#2121301PCV490

PURPOSE. The purpose of this Statement of Objectives is to replace faulty facility equipment at Station Sault Sainte Marie Mi. Station has five windows and an exterior door that are in need of replacement. The windows do not function as intended due to broken mechanical balances. The windows seals and weather-stripping are worn causing increased energy consumption and extra work on the station HVAC system to maintain temperature. The exterior door frame is badly corroded and affecting the ability to remain weathertight.

SCOPE OR MISSION.

1. Remove 05 windows roughly 48x42 and replace with new commercial grade windows.

2. Set in place foam/calk and trim interior and exterior.

3. Remove 01 service door and replace with new commercial windowed steel entry door.

4. Refer to SSMR, SAM Project 17429552 for additional information.

PERIOD OF PERFORMANCE.

The period of performance for this statement of objectives is prior to winter of 2021.

PLACE OF PERFORMANCE.

The primary place of performance will be at Coast Guard Station Sault Sainte Marie MI. 337 E Water St. Sault Sainte Marie MI 49783

BACKGROUND.

PERFORMANCE OBJECTIVES.

1. Reduce work-load on HVAC system.

2. Decrease energy consumption.

3. Prevent future damage to station building.

4. Follow the mission statement of CG-46 - "To optimize energy delivery systems and enhance management programs to support routine and contingent operations effectively, maximize future flexibility and reduce cost while promoting energy stewardship."

OPERATING CONSTRAINTS. Station does not foresee any operating constraints until Winter.

APPLICABLE DOCUMENTS OR REFERENCES.

1. SAM Project 17429552

File details come from the government source that posted it. Updated .