Statement of Objectives Sheppard Air Force Base, Texas

Internet Connectivity for Building 2560—80 FTW

1.0. SCOPE

The focus of this project is to provide Internet access to one (1) building on Sheppard Air Force Base (SAFB): 2308 K Ave Building 2560.

1.1. OBJECTIVE

This project will involve providing Internet connectivity to one building on SAFB, with minimum bandwidth of 1Gigabytes per second (1Gbps) download and upload. Internet connectivity shall be provisioned to Building 2560.on SAFB.

1.2. ORDER TYPE

This effort is proposed on a Firm Fixed Price (FFP) basis.

2.0. REQUIREMENTS

The contractor shall provide 1 Gbps fiber commercial Internet connectivity to the 80FTW, Building 2560. (listed in part 1.1.).

2.1. SPECIFICATIONS OF REQUIREMENT

The contractor shall provide installation on a one-time basis, and operations and maintenance on a 24-hours, 7 day per week, 365 days per year basis for commercial Internet connectivity. The contractor shall provide a minimum bandwidth connection of 1Gbps download and 1Gbps upload.

The contractor shall provide an Ethernet and Wi-fi interface to allow for client systems to utilize the provided Internet connection, and must provide a firewall to ensure client machines are not exposed directly to the Internet. The contractor shall provide service and support contact information. Installation could involve potential construction depending on the vendor's current fiber presence on SAFB and the effort required to connect to building 2560.

3.0. SCHEDULE

The contract will extend for a twelve-month base period and four 1-year option periods, with the base period beginning after completion of all installation actions.

- Base Year: Dates TBD

- Option Year 1: Dates TBD

- Option Year 2: Dates TBD

- Option Year 3: Dates TBD