Statement of Objectives.pdf

PDF 144 KB Posted

Attached to
CCTV Package
Solicitation number
FA3010_CCTV_WILLIAMS
Issued by

About this file

This document is a Statement of Objectives for a CCTV system to be installed at Keesler AFB, MS. The key objectives are to provide a CCTV system with video storage capabilities that covers specific areas of the facility, including patient treatment areas, entry areas, and a classroom. Requirements include PTZ or stationary cameras with no blind spots, wireless camera display and audio to laptops and tablets, 2-way audio in training areas, 36TB or larger storage without internet connection, and quarterly maintenance. The Government is conducting market research through a Sources Sought announcement to identify potential sources that can meet the stated requirements. Interested parties must submit a written statement confirming compliance by the deadline of 3:00 PM CST on May 6, 2024. This is not a solicitation, and no contract will be awarded at this time.

View the file

Other files

File Type Posted
Diagram.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Objectives

1. Objective: Install CCTV System with video storage capabilities.

2. Requirement: The Contractor shall provide all services, supplies, transportation, equipment, test sets, tools, materials, labor supervision, management, and other incidentals necessary to Engineer, Furnish, Install, and Test pan/tilt/zoom (PTZ) cameras or mounted stationary cameras. CCTV package shall include the following:

• Camera’s need to cover entire room area identified in drawing with no blind spots (see attached diagram for approximate room sizes and layout) o Two patient treatment areas (15’ x 15’) o Main entry area (33’ x 21’) o Secondary entry area ( 8’x 35’ ) o Classroom (14’ x 40’) o Two Patient treatment area (12’ x 7’)

• 1 IR camera per room and both entrances.

• Provide four tablets and two laptops and be able to be easily transferred to audiovisual equipment in SimLab.

• Cameras need to wirelessly display visual and project sound to both laptops and tablets.

• Package must include 2-way audio in all training areas.

• Storage capability of 36TB or larger that doesn’t require internet connection.

• Provide quarterly maintenance.

• Must provide step by step operation and troubleshooting training for 10 people.

File details come from the government source that posted it. Updated .