About this file
This is a Statement of Objectives (SOO) for a roof replacement project at Naval Air Station Joint Reserve Base (NAS JRB) Fort Worth, Texas, dated 30 April 2026. The project involves replacing the upper roof on Building B3356, which sustained damage during high winds that elevated the existing 60 mil TPO (thermoplastic polyolefin) roof and separated the TPO membrane from the parapet wall connections. The contractor must provide all equipment, tools, materials, supplies, transportation, labor, supervision, and management necessary to complete the work. All materials must be new and not refurbished.
The primary work requirements include: removing and salvaging lightning protection for reinstallation; removing the existing parapet wall cap, termination bars, and roofing system; furnishing and sheathing the roof and walls with 7/16" OSB using adhesive and drop anchors; furnishing and installing 60 mil single-ply TPO with t-joint covers over the roof and up and over walls; installing a new parapet wall cap around the perimeter in a color matching the existing or Dark Bronze; reinstalling the salvaged lightning protection; and patching 10 failing spots and curb joints on the lower section of the roof. The site is located on a military installation; the contractor must provide its own toilet facilities and water sources, though power connections for tools are available on-site.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF OBJECTIVES
(SOO)
For
Replacement of Upper Roof on B3356
NAS JRB Fort Worth, TX
30 April 2026
STATEMENT OF OBJECTIVES (SOO)
For
Replacement of Upper Roof on B3356
NAS JRB Fort Worth, TX
1. INTRODUCTION
This Statement of Objectives (SOO) defines the requirements for the contractor to replace the B3356 Upper Roof. The damage occurred during high winds, elevating the current 60 mil TPO roof and separating the TPO on the roof from the TPO on the side parapet walls. Photograph of work area is attached to page 3, other photographs are not available due to site security restrictions.
2. REQUIREMENTS
Unless otherwise specifically noted herein, the contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this SOO. All supplies and materials provided shall be new and not refurbished.
The site location is located on NAS JRB Fort Worth, TX. Contractor must be prepared to provide their own toilet facilities and water sources. Power connections for tools are available at the site. Refer to the attached photo for additional details.
2.1. Remove and save lightning protection for reinstallation.
2.2. Remove Parapet wall cap and termination bars on the upper roof.
2.2. Remove Existing Roof and Roofing System on the Upper Roof walls and roof.
2.3. Furnish and sheath roof and wall with 7/16” OSB using adhesive and drop anchors.
2.4. Furnish and install Single Ply TPO 60 Mil including t-joint covers over roof, up and over walls to be covered with new wall cap.
2.5. Install new parapet wall cap around perimeter, matching existing or Dark Bronze.
2.6. Install salvaged lightning protection.
2.7. Patch 10 spots and curb joints on the lower section of the roof that are failing.