This Statement of Objectives (SOO) details a fire detection and sprinkler system installation project for the U.S. Coast Guard's Aviation Technical Training Center (ATTC) Maintenance Training Unit in Elizabeth City, NC. The government seeks a contractor to design, provide, and install new fire detection and sprinkler systems in the MTU Fixed Wing Training Center and Training Simulator Data Room, with specific technical requirements including: installing two sprinkler heads in the data room using a 6" fire main, using Schedule 40 black steel pipe painted red, and adding five multi-criteria photo/heat/infrared detectors, one duct detector housing, one control relay module, and two ceiling-mounted strobe lights. The work must be completed during normal business hours (Monday-Friday, 0700-1530) and requires drawings prepared by a minimum NICET Level IV designer. The contract will be a single firm-fixed price purchase order, with work expected to commence immediately upon award, and The Hiller Companies, Inc. is the required installer to meet National Fire Protection Association 72 standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Objectives
70Z03825QS0000006
Introduction and Instructions
This Statement of Objectives (SOO) describes the objectives and desired end result for the Aviation Technical
Training Center (ATTC) Maintenance Training Unit (MTU) fire detection system and data room sprinklers.
Offerors shall use this SOO with applicable portions of solicitation as the basis for preparing their quote. Offerors shall ensure that all aspects of the SOO are thoroughly addressed in their quotes.
Point of Contact (POC) – Jeremy A. Wood
(206) 820-4324 jeremy.a.wood@uscg.mil
Contents
1.0 Purpose
2.0 Scope
3.0 Period and Place of Performance
4.0 Background
5.0 Objectives
5.1 Technical Objectives
5.2 Safety Objectives
1.0 Purpose
The purpose of this SOO is to obtain contractor support with the knowledge, skills, and abilities to provide the labor and materials needed to design, provide, and install the requirements needed in the
MTU Fixed Wing Training Center and Training Simulator Data Room.
2.0 Scope
The ATTC MTU’s scope of work:
• Remove the existing panel and devices and install new devices, tying into the existing Fire
Alarm Control Unit’s nearest Signaling Line Circuit (SLC) and Notification Appliance Circuit
(NAC) inside the hangar bay, alongside the new Mobile Server Unit.
• Tying into existing 6” fire main in the warehouse area, install two sprinkler heads in the Training
Center Data Room.
The Contractor shall:
• Develop a proposed solution to include NICET Level III (minimum) detailed drawings depicting the work to be accomplished.
• Develop a list of equipment/parts required to accomplish the work.
• Provide all labor, material, design drawings, transportation, supervision, and accessories necessary to complete this requirement.
• Prepare and submit an implementation plan and timeline to accomplish the work.
3.0 Period of Performance
The Government will award a single firm-fixed price purchase order to support this effort. Upon awarding the purchase order document, work is expected to commence as soon as possible. All work to be accomplished at ATTC, 1664 Weeksville Road, Bldg. 21, Elizabeth City, NC 27909.
Statement of Objectives
70Z03825QS0000006
4.0 Background
The HC-144 Maintenance Training Unit was delivered to the Aviation Technical Training Center (ATTC) without a compatible Detection system. The current detection and protection systems within building 21 are proprietary to The Hiller Companies, Inc. ATTC requires the installation to be completed by The
Hiller Companies, Inc. to meet compliance IAW National Fire Protection Association 72 standards.
5.0 Objectives
5.1 Technical Objectives
• Training Simulator Data Room Sprinklers
▪ Starting at existing 6” fire main in warehouse over the data room, tie-in to this fire main with an approved mechanical tee and drop-down pipe to the top of the data room. This pipe will supply two fire sprinkler heads located inside the data room.
▪ The sprinkler heads will be white with a skirt and cage for protection from damage.
▪ Piping will be accomplished with Schedule 40 black steel pipe, and painted red to match other fire protection piping.
▪ Work to be accomplished during normal business hours Monday – Friday, 0700 – 1530.
▪ Drawings shall be prepared by a minimum NICET Level IV designer.
• HC-144 Fire Detection System
▪ Provide five (5) multi-criteria photo, heat, and infrared detectors
▪ Provide one (1) duct detector housing, including one (1) resettable smoke detector, one (1) five (5) foot long sampling tube, one (1) remote test switch
▪ Provide one (1) control relay module
▪ Provide two (2) ceiling mount strobe lights in white
5.2 Safety Objectives
• The Contractor is solely responsible for compliance will all federal, state, and local laws, including but not limited to the OSHA (Public Law 91-596) and resulting standards, OSHA Standard 29 CFR
1910 and any ALC Instructions as applicable, and the protection of their employees.
Note: ALC Instructions are annotated because many of the USCG/ALC standards exceed the OSHA standard criteria. If a conflict is noted, the most stringent requirement takes precedence. The