This document is a Statement of Need for a Pull Behind Air Compressor. The 9th Civil Engineer Squadron at Beale Air Force Base requires a new pull-behind air compressor to replace their inoperable existing unit. The new compressor must be capable of providing at least 250 CFM of airflow and have a diesel engine with a 3-year or longer warranty, as well as a 5-year or longer warranty on the air compressor components. The compressor is needed to manually transfer fuel and perform tank cleanings, and must have features such as dual air outlets, auto load/unload, and a 12-volt key start. The contractor will be responsible for delivering the compressor within 2-3 weeks of award, coordinating the delivery time with the government point of contact. The compressor will be delivered to Beale AFB and the contractor's personnel must comply with base access and traffic regulations.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF NEED

FOR

9CES PULL BEHIND AIR COMPRESSOR

BACKGROUND:

The 9th Civil Engineer Squadron enables the 9th Reconnaissance Wing mission by providing superior facility, airfield, and utility system construction, operations, and maintenance; fire emergency services, explosive ordnance disposal, and emergency management; unaccompanied along with privatized family housing facilities and programs;

asset optimization; and environmental security. The air compressor used by LFM to power pneumatic tools, pumps, fans, and other equipment has broken and is inoperable. 9 CES worked with the 940th AGE to restore the compressor. Due to it being an old model, they do not have or make the parts for it.

SCOPE:

The Contractor shall provide one (1) Pull Behind Air Compressor that can push a minimum of 250 CFM (Cubic Feet per Minute). This equipment is required to manually transfer fuel and perform tank cleanings. The addition of this compressor will allow for continued efficient and swift mission effectiveness.

REQUIREMENTS:

The Government requires one (1) Pull Behind Air Compressor. The compressor shall include both a three (3) year or longer engine warranty and a five (5) year or longer air component warranty. The compressor is also required to manually transfer fuel and perform tank cleanings. The contractor shall be responsible for the delivery of the compressor with the following specifications:

• Singler/Dual axel trailer

• Fuel - Diesel

• No DEF or DPF emissions equipment

• 8 hours of continuous run time on a single tank

• 100 PSI minimum

• 250 CFM minimum

• (2) - ¾” air outlets

• (1) - 1” air outlet

• Auto Load/ Unload (to prevent loaded shutdown and blowback)

• Spin-On compressor oil filters

• Fully enclosed with open canopy design

• 12-Volt Key start

DELIVERY:

Contractor shall coordinate a delivery time with the Government Point of Contact (POC) identified in the inspect and accept information section of the contract at least two (2) weeks prior to anticipated delivery. Contractor shall deliver product two (2) – three (3) weeks after payment within the prescribed hours and location coordinated by the Government Point of Contact (POC).

LOCATION AND HOURS OF WORK:

The 9 CES’s location of operations is 6599 B St Bldg. 2565, Beale AFB, CA 95903. The following Federal holidays are observed:

New Year's Day 1 January Martin Luther King’s Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Juneteenth 19 June Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December

ACCESS:

Contractor Manager or alternate shall complete an entry authorization list (EAL) for access to Beale Air Force Base. The request shall be submitted within two (2) weeks of delivery to Pass and Registration via the Government Point of Contact (POC) identified in the inspect and accept information section of the contract. All contractor vehicles must enter the base via the Wheatland Gate and shall be subject to inspection. All contractor personnel must obtain base passes or be listed on the Entry Access List (EAL) throughout duration of work performance. Any persons in the EAL are required to bring two (2) forms of identification or REAL ID to access the base.

TRAFFIC LAWS:

The contractor and their employees shall comply with all installation traffic regulations.

CELLULAR PHONE OPERATION POLICY:

The contractor shall comply with local base policies regarding cellular phone operation.