This document is a Statement of Need for a Double Stacked Floor Model Convection Steamer required by the David Grant Medical Center (Nutritional Medicine Flight) at Travis AFB. The contractor shall provide an energy efficient convection steamer with specific salient characteristics, remove the existing steamer, perform the installation, and upgrade the electrical connection as necessary. The contractor shall also provide training on the proper operation and cleaning of the steamer. This Statement of Need is related to a pre-solicitation Federal Contract Opportunity (Solicitation Number FA442725QZ005) issued by the Department of the Air Force Air Mobility Command to identify sources that can provide the required equipment. The government is conducting market research and is not yet committed to procuring the equipment. Respondents are requested to provide business information, capabilities to meet the requirements, and input on the Statement of Need.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Need
For
60th MDTS/Nutritional Medicine Flight
Double Stacked Floor Model Convection Steamer
Description: David Grant Medical Center (Nutritional Medicine Flight) requires the installation of a new convection steamer for food production and inpatient care services to include electrical upgrade, as necessary, for the convection steamer to be electrically connected and operational. The steamer must be easily moveable for routine maintenance.
Contractor shall provide/perform the following:
1. Energy Efficient Floor Model Convection Steamer Vulcan Model C24ET10 or Equal To.
1.1. Salient Characteristics/Features
1.1.1. Stainless steel interior, exterior, and cabinet base
1.1.2. 2 compartments/7-10 pan capacity with separate controls
1.1.3. No more than 5’8” H / 28” D / 3’3” W
1.1.4. Legs with flanged feet
1.1.5. Drain with temperature control
1.1.6. Split water connection
2. Removal of Existing Steamer
2.1. The contractor shall disconnect and remove existing steamer.
2.2. The contractor shall turn in the removed steamer to MEMO prior to installation of new
Steamer.
3. Installation
3.1. The contractor shall provide all labor, materials, and specialized equipment necessary to perform the installation of Steamer.
4. Electrical Upgrade (as necessary). The existing utilities are two circuits that are both 208V 3phase 40amp shut trip breakers.
4.1. The contractor shall provide all labor, materials, and specialized equipment to upgrade the electrical connection required to install and connect the steamer, if necessary.
5. Special Requirements
5.1. Training (hands-on training for proper operation and cleaning)
5.2. Standard industry warranty