Statement of Need - Convection Steamer.pdf

PDF 89 KB Posted

Attached to
Convection Steamer (Including Installation and Electrical Upgrade)
Solicitation number
FA442725QZ005
Issued by

About this file

This document is a Statement of Need for a Double Stacked Floor Model Convection Steamer required by the David Grant Medical Center (Nutritional Medicine Flight) at Travis AFB. The contractor shall provide an energy efficient convection steamer with specific salient characteristics, remove the existing steamer, perform the installation, and upgrade the electrical connection as necessary. The contractor shall also provide training on the proper operation and cleaning of the steamer. This Statement of Need is related to a pre-solicitation Federal Contract Opportunity (Solicitation Number FA442725QZ005) issued by the Department of the Air Force Air Mobility Command to identify sources that can provide the required equipment. The government is conducting market research and is not yet committed to procuring the equipment. Respondents are requested to provide business information, capabilities to meet the requirements, and input on the Statement of Need.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Need

For

60th MDTS/Nutritional Medicine Flight

Double Stacked Floor Model Convection Steamer

Description: David Grant Medical Center (Nutritional Medicine Flight) requires the installation of a new convection steamer for food production and inpatient care services to include electrical upgrade, as necessary, for the convection steamer to be electrically connected and operational. The steamer must be easily moveable for routine maintenance.

Contractor shall provide/perform the following:

1. Energy Efficient Floor Model Convection Steamer Vulcan Model C24ET10 or Equal To.

1.1. Salient Characteristics/Features

1.1.1. Stainless steel interior, exterior, and cabinet base

1.1.2. 2 compartments/7-10 pan capacity with separate controls

1.1.3. No more than 5’8” H / 28” D / 3’3” W

1.1.4. Legs with flanged feet

1.1.5. Drain with temperature control

1.1.6. Split water connection

2. Removal of Existing Steamer

2.1. The contractor shall disconnect and remove existing steamer.

2.2. The contractor shall turn in the removed steamer to MEMO prior to installation of new

Steamer.

3. Installation

3.1. The contractor shall provide all labor, materials, and specialized equipment necessary to perform the installation of Steamer.

4. Electrical Upgrade (as necessary). The existing utilities are two circuits that are both 208V 3phase 40amp shut trip breakers.

4.1. The contractor shall provide all labor, materials, and specialized equipment to upgrade the electrical connection required to install and connect the steamer, if necessary.

5. Special Requirements

5.1. Training (hands-on training for proper operation and cleaning)

5.2. Standard industry warranty