This statement of need describes a requirement for a decontamination trailer to support the 9MXS T-38 aircraft at an Air Force base. The Air Combat Command seeks to procure a trailer capable of decontaminating aircraft exposed to chemical or biological contaminants. The trailer must include a power-wash station, containment area, waste storage tanks, air filtration system, and be transportable by truck. Bidders should be able to deliver the trailer within 180 days of award. The statement provides specifications for the required decontamination systems, trailer size and build materials, power requirements, safety features, and manuals/training to be provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Decon Layout.png | PNG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
HEADQUARTERS 9TH RECONNAISSANCE WING (ACC)
BEALE AIR FORCE BASE, CALIFORNIA
MEMORANDUM FOR RECORD
TO: 9 CONS/PKB
FROM: 9 MXS/CC
SUBJECT: Statement of Need for a New Decontamination Unit
1. Purpose. The current decontamination unit in Building 1071 does not meet the transition area requirements outlined in United Facilities Criteria UFC 4-211-02-2012.
This poses a significant health and safety hazard as personnel are unable to effectively decontaminate themselves and their personal items. It is crucial to have a proper decontamination unit in place to ensure that Corrosion Control personnel are free from any potential health risks from performing painting, de-painting, and other corrosion preventative actions.
2. Requirements. The contractor shall be responsible for providing all necessary resources to install a new temporary decontamination unit. The installation process shall require minimal facility adjustments and the unit shall meet the requirements specified in UFC 4-211-02 Figure 2-5 Cleaning Dirty Schematic. Include the following components:
a. Air Shower
b. Washer & Dryer connections
c. Stainless Steel Shower and sink
d. Regular Shower
e. Clean Locker Room
f. Fully finished interior
g. Thermostat controlled heat/cool. Separate for “hot” and “cold” sides
h. Ventilation to keep contaminates on “hot” side
i. LED Lighting
j. Respirator storage area
k. Shelving
l. Fire extinguisher
m. Portable eye wash station
n. Covered walk-way to temporary unit
o. 125-amp NEMA 1 electrical panel with NEMA 3 service connect and disconnect
p. 1 duplex GFI outlet and 8 duplex 110v outlets
a. Contractor shall abide by National Electric Codes.
q. Water connection to base infrastructure utilizing ¾ copper type K piping
a. Contractor shall abide by National Standard Plumbing Codes
r. Connect unit to 2000-gal waste storage tank (provided by (9 MXS)
s. Remove and Disposal of existing de-commissioned decontamination tow-behind trailer (approx.: 150 sq ft)
3. Period of Performance. 30 days from off site to onsite from manufacture date.
Installation: 30 days.