Statement of Need 28 August 24 (final).pdf
PDF 115 KB Posted
- Attached to
- NOTICE OF INTENT TO SOLE SOURCE: Kovatch Mobile Equipment (KME)/Hale main water pump and gearbox
- Solicitation number
- FA442724Q0161
About this file
This document is a Statement of Need (SON) for a sole source requirement to purchase a brand-new original equipment manufacturer (OEM) Kovatch Mobile Equipment (KME)/Hale main water pump and gearbox assembly for a Rapid Intervention Vehicle (RIV) P-34 Firetruck. The part number for the pump and gearbox assembly is HAL501-0024-010-50. The contractor shall pre-assemble the pump and gearbox into an Ultra High-Pressure Pump Assembly (UHP) and provide a 1-year warranty on all parts and labor. The contractor shall perform any required warranty work at Travis AFB. The 60th Logistics Readiness Squadron (LRS) Vehicle Management at Travis AFB is responsible for installing the UHP assembly into the Firetruck. Delivery is required within 120-160 days after receipt of award. The related federal contract opportunity is a Special Notice for this sole source requirement, which the 60th Contracting Squadron at Travis AFB intends to award to Burton's Fire, Inc.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Need (SON) Kovatch Mobile Equipment (KME)/HALE
Water Pump and Gearbox Assembly
SOLE SOURCE
22 August 2024
The 60th Logistics Readiness Squadron (LRS) Vehicle Management at Travis AFB has a sole source requirement for a brand-new original equipment manufacturer (OEM) Kovatch Mobile Equipment (KME)/Hale main water pump and gearbox assembly for a Rapid Intervention Vehicle (RIV) P-34 Firetruck. Pump and gear box assembly part number: HAL501—0024-010-50
Description:
1. The contractor shall provide a brand-new OEM, KME/Hale main water pump and gearbox Firefighting Water Pump and Gear Box assembly from the original parts manufacturer (Hale Pumps) for the RIV (P-34) fire truck.
2. Contractor shall pre-assemble pump and gearbox into a Ultra High-Pressure Pump Assembly (UHP) and provide a standard manufacturer warranty of at least 1-year on all parts and labor required for assembling the UHP.
3. Contractor shall perform any required warranty work in Travis AFB local area.
4. Contractor shall pre-assemble pump and gearbox. The 60th LRS is responsible for installing UHP assembly into the Firetruck.
5. Contractor shall ensure UHP meets original OEM specifications and performance.
Delivery: 120-160 days after receipt of award, sooner if possible.
Point of contact after the contract is awarded:
Mr. Miguel Delgado at Vehicle Management: p) 707.424.3179 SSgt Ryan Abella at Vehicle Management: p) 707.424.5307
File details come from the government source that posted it. Updated .