This is a Statement of Need (SON) for Youth Center Bleachers issued by the 72 FSS/FSY Youth Center dated August 12, 2026. The requesting organization seeks to replace existing bleachers installed 25 years ago that have reached end-of-service life due to safety concerns and base safety write-ups.
The vendor must provide and fully install Hussey Seating Company MAXAM Telescopic Series bleachers (or approved equivalent meeting identical specifications) including demolition and removal of existing bleachers. The system specifications include: wall-attached, manually operated, multi-tier retractable spectator seating approximately 45 feet in installed length with maximum 9 feet 1 inch deployed depth; 5 rows of seating with 22-24 inch row spacing; heavy-duty structural steel frame with black powder coat finish; minimum 5/8-inch exterior-grade plywood decks with non-slip overlay; CourtSide collection contoured HDPE seats (10-inch depth); minimum four ADA-compliant wheelchair spaces with companion seating; center-aisle handrails and full-height end guardrails; and automatic mechanical tier locks. The system must comply with IBC and ICC 300 standards with minimum 120 lbs/sq ft active live load capacity and specified sway load requirements. Installation must be executed by a factory-certified installer with formal structural and operational safety testing prior to government acceptance. Required delivery is 60 days after contract award to Building 5520 (POC: Mindy Whittington, 734-7866). The vendor is responsible for all removal and installation work and must provide comprehensive on-site operational and safety training to at least five designated staff members. A manufacturer's 5-year warranty and 24/7 technical support are required. An OPSEC review letter was signed by the current OPSEC manager and submitted to the Contracting Office.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF NEED (SON)
Project / Requirement Title: Youth Center Bleachers
Requesting Organization: 72 FSS/FSY Youth Center
Date: August 12, 2026
1.0 Background and Objective
Purchase is required to satisfy Youth Center seating issues and Base Safety concerns and write ups.
• The current bleachers were installed 25 years ago and have reached the end of their service life. Replacement is necessary to ensure continued safety, reliability for all Youth Center spectators.
2.0 Scope
The vendor will provide MAXAM telescopic bleachers manufactured by Hussey Seating Company that will perform full installation of the system. The scope of work includes demolition and removal of the existing bleacher system. The new bleachers will be attached to the wall and designed to retract to extend maximum available floor space.
3.0 Essential Characteristics and Requirements
System Classification
• Brand & Model: Hussey Seating Company MAXAM Telescopic Series (or approved equivalent meeting identical dimensional and safety tolerances).
• Design: Wall-attached, manually operated, multi-tier retractable spectator seating system designed specifically for indoor gymnasium environments.
Physical Dimensions
• Installed Length: Approximately 45 feet (45' total continuous length).
• Fully Deployed Depth: Maximum 9 feet, 1 inch (9' 1") from the mounting wall.
• Row Quantity & Spacing: 5 rows (tiers) of seating with a standard 22-inch to 24-inch row spacing to ensure adequate legroom and egress.
Material & Construction
• Understructure Frame: Heavy-duty, high-tensile structural steel shapes forming a rigid, self-supporting understructure, finished with a corrosion-resistant black powder coat.
• Decks & Under-decking: Minimum 5/8-inch exterior-grade plywood panels with a durable, non-slip textured poly-wear surface overlay.
• Seating Type: CourtSide collection contoured HDPE (High-Density Polyethylene) seats, 10-inch (254 mm) depth, featuring an anatomical curved design with a front "waterfall" edge to alleviate thigh pressure.
Demolition & Site Prep
• Complete demolition and removal of existing 25-year-old bleachers with zero damage to surrounding walls, gym floor, or utility lines.
• 100% damage-free. Any accidental damage must be repaired/restored to original condition at contractor expense within 5 business days.
• 100% Inspection by COR and Youth Center Facility Manager.
Operational Method
• Operation: Manual operation utilizing a high-efficiency pull-handle/draw-bar system.
• Tracking: Must feature self-supporting first-row wheels and structural guide tracks to allow smooth, single-operator extension and retraction without binding.
• Operational Training: Provide comprehensive, on-site operational and safety training to at least five (5) designated Youth Center staff members.
Accessibility Compliance (ADA)
• Wheelchair Spaces: Minimum of four (4) integrated, ADA-compliant wheelchair seating locations recovered within the footprint.
• Companion Seating: Adjacent companion seating structurally integrated as required by the Americans with Disabilities Act (ADA) and the International Building Code (IBC).
Safety & Egress Features
• Aisle Handrails: Center-aisle, self-storing, or removable structural steel handrails with round profiles, finished in high-visibility safety colors.
• End Rails (Guardrails): Full-height steel guardrails at both open ends of the bleacher system, meeting a minimum lateral load requirement of 50 lbs/ft at the top rail.
• Locking Mechanisms: Automatic mechanical tier locks that securely lock each row in the fully extended position to prevent accidental retraction during occupancy.
Structural Load Standards
• Compliance: Must conform to IBC (International Building Code) and ICC 300 (Standard for Bleachers, Folding and Telescopic Seating, and Grandstands) load ratings.
• Active Live Load: Minimum 120 lbs/sq ft active horizontal framework capacity.
• Sway Load: 24 lbs/linear ft parallel to seats; 10 lbs/linear ft perpendicular to seats.
Execution & Safety Certification
• Installation: Must be executed by a factory-certified installer.
• Testing: Installer must conduct a formal structural and operational safety test prior to government acceptance.
4.0 Compatibility and Integration
• Bleacher system must attach to the wall in order to replace the existing 25-year-old bleachers and be the same size.
5.0 Delivery and Schedule
Detail the timeline and location for delivery.
• Required Delivery Date (RDD): 60-Days After Contract Award
• Delivery Location (DoDAAC / Address): Bldg 5520 POC Mindy Whittington-734-7866
• Special Shipping Instructions: The vendor will be responsible for removal and installation.
6.0 Warranty, Maintenance, and Training (If Applicable)
State any requirements beyond the standard commercial warranty.
• Warranty: Manufacturers’ 5 year warranty
• Support: [e.g., Requires 24/7 technical phone support]
• Training: on-site training upon installation.
7.0 Security and Environmental Requirements (If Applicable)
List any specific clearances, OPSEC requirements, or environmental standards (e.g., Energy Star, MIL-STD-810G for ruggedization).
OPSEC review letter was signed by current OPSEC manager and sent to Contracting Office.