Statement_of_Intent_To_Pay_Prevailing_Wages.pdf
PDF 91 KB Posted
- Solicitation number
- ITB-2612
- Issued by
- San Juan County, New Mexico
About this file
This is a Statement of Intent to Pay Prevailing Wages form required by the State of New Mexico for public works construction projects. The document establishes compliance requirements for the G-80 Point of Diversions #8 & #13 Well Contract No. 2, which involves the installation of deep well submersible pump assemblies at two well sites in McKinley County, near Gallup, New Mexico. The project includes installation of 4" O.D. J-55 steel column piping, check valves, electric cable, stainless steel air lines, centralizers, and appurtenances within existing well casings, with intake depths of 1,650 feet at POD #8 and 2,465 feet at POD #13. The form must be completed and submitted to the contracting agency within three days of contract award and before construction begins, capturing essential project information including estimated start and completion dates, total contract amount, and the applicable State Wage Decision Number.
The form requires certification that all workers employed on the public works project will be paid no less than the prevailing wage rates determined by the New Mexico Department of Workforce Solutions, Labor Relations Division. General contractors, subcontractors, and tiered subcontractors must each complete separate signed forms documenting their contract amounts and worker payment commitments. Contractors who violate prevailing wage laws, including incorrect job classification, improper payment of prevailing wages, or overtime violations, are subject to debarment procedures and required payment of back wages to affected workers, as referenced in the Public Works Minimum Wage Act (13-4-11 through 13-4-18, NMSA 1978) and the Labor Relations Division Public Works Minimum Wage Act Policy Manual (11.1.2 NMAC).
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(Revised 08/22/2013)
STATEMENT OF INTENT TO PAY PREVAILING WAGES
To Be Completed Before Construction Starts
All FIELDS ARE REQUIRED
FORM MUST BE SENT TO THE CONTRACTING AGENCY WITHIN 3 DAY OF THE AWARD
General Contractor Information Company Name:
Address:
City : State: Zip:
Phone: Fax: E-Mail:
Estimated Start Date: State Wage Decision Number:
Project Title:
Project Physical Address:
Total Contract Amount: Estimated Completion Date:
Print Name:
General Contractor Signature:
Sub Contractor Information Sub Contract Amount:
Start date on this project:
Company Name:
Address:
City: State: Zip:
Phone: Fax: E-Mail:
Sub Contractor Signature:
2nd, 3rd, etc. Tier Sub-Contractor Information Contract Amount:
Start date on this project:
Company Name:
Address:
City: State: Zip:
Phone: Fax: E-Mail:
Tier Signature:
I hereby certify that the above information is correct and that all workers I employ on this public works project will be paid no less than the Prevailing Wage Rate(s) as determined by the Department of Workforce Solutions, Labor Relations Division for this project as identified by the State Wage Decision Number. I understand that contractors who violate Prevailing Wage Laws (i.e., incorrect job classification, improper payment of prevailing wages, and/or overtime, etc.), are subject to debarment procedures and shall be required to pay any back wages due to workers. (Ref. Labor Relations Division, Public Works Minimum Wage Act Policy Manual (11.1.2 NMAC) & Public Works Minimum Wage Act (13-4-11 through 13-4-18, NMSA 1978).
Contractor’s Signature Date
(Revised 08/22/2013)
INSTRUCTIONS FOR COMPLETING STATEMENT OF INTENT TO PAY PREVAILING WAGES
GENERAL CONTRACTOR
1. Enter general contractor information and provide signature.
2. Enter State Wage Decision Number as listed in bid documents. (Example: BE-13-0123 B)
3. Enter project title - listed in bid documents.
4. Enter project physical address - exact location of project (job site).
5. Enter estimated start & completion dates of project.
6. Enter general contractor’s contract amount.
7. All Statements must be sent to the Contracting Agency.
SUB CONTRACTOR
1. Enter general contractor information, but general contractor signature is not needed.
2. Enter sub contractor information as indicated and provide signature.
3. Enter sub contractor contract amount.
NOTE: A separate signed form is needed for each contractor.
2ND TIER SUB CONTRACTOR
1. Enter general contractor information, but general contractor signature is not needed.
2. Enter sub contractor information; subcontractor signature not needed.
3. Enter 2nd tier sub information and provide signature.
4. Enter 2nd tier contractors contract amount.
3RD TIER AND HIGHER CONTRACTOR
1. Attach a copy of this completed form & list the 3rd tier contractor information under the 2nd tier
File details come from the government source that posted it. Updated .