STATE_OF_FLORIDA_AUTOMATED_TRANSIT_VEHICLE_PROCUREMENT_(Addendum_#4_Revision).pdf
PDF 1 MB Posted
- Solicitation number
- P-24-019
- Issued by
- Duval County, Jacksonville City, Florida
About this file
The document is a Request for Proposals (RFP) issued by the Jacksonville Transportation Authority (JTA) for the State of Florida Automated Transit Vehicle Procurement (RFP No. P-24-019). JTA is seeking proposals for highly automated transit vehicle solutions from vendors across the State of Florida and the Continental United States, with proposals due on September 11, 2024, at 2:00 PM local time. The solicitation is designed to procure automated transit vehicles with SAE Level 4 automated driving systems (ADS) that can operate within specific operational design domains (ODDs). The contract will be for five years with no renewal options, and JTA plans to potentially make multiple awards based on a best-value competitive selection process.
The RFP emphasizes technical capabilities, safety, and operational efficiency, with a maximum possible score of 100 points across categories including qualifications, technical capabilities, safety compliance, and operational efficiency. Pricing is subject to negotiations, and while there is no specific Disadvantaged Business Enterprise (DBE) participation goal, proposers are encouraged to achieve JTA's overall DBE goal of 27%. The solicitation requires comprehensive documentation demonstrating the automated vehicles' capabilities, including performance compliance matrices, safety plans, community engagement strategies, and compliance with federal regulations such as Buy America requirements and Americans with Disabilities Act standards. Proposers must provide detailed information about vehicle characteristics, automated driving system capabilities, and deployment strategies across various operational environments like academic campuses, urban areas, suburban regions, and highways.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_B_-_Vehicle_Attributes_and_Operational_Restrictions_Matrix.pdf | ||
| Attachment_A_-_ADS_Performance_Compliance_Matrix.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JACKSONVILLE TRANSPORTATION AUTHORITY
REQUEST FOR PROPOSALS (RFP) FOR
undefined
PROPOSAL SUBMISSION DATE:
BY 2:00 PM (LOCAL), undefined
RFP NUMBER: P-24-019
Jacksonville Transportation Authority
100 LaVilla Center Drive
Jacksonville, Florida 32204
REQUEST FOR PROPOSALS
TABLE OF CONTENTS
I. NOTICE FOR PUBLICATION
II. INSTRUCTIONS TO PROPOSERS
III. PROPOSAL FORM AND SELECTION CRITERIA
IV. EVALUATION PHASES
V. INSURANCE REQUIREMENTS
VI. REQUIRED CLAUSES FOR FEDERALLY ASSISTED CONTRACTS
VII. REQUIRED FORMS AND CERTIFICATIONS
VIII. VENDOR QUESTIONNAIRE
IX. SCOPE OF WORK
1. NOTICE FOR PUBLICATION
REQUEST FOR PROPOSAL No. P-24-019
SUBJECT: STATE OF FLORIDA AUTOMATED TRANSIT VEHICLE PROCUREMENT
PROPOSAL CLOSING: Wednesday, September 11, 2024, 2:00 pm. (local time)
The Jacksonville Transportation Authority (the “Authority” or the “JTA”) hereby requests Sealed Proposals for
P-24-019, STATE OF FLORIDA AUTOMATED TRANSIT VEHICLE PROCUREMENT.
The Jacksonville Transportation Authority (‘JTA’ or ‘Authority’) hereby request sealed proposals for P-24-019
State of Florida Automated Transit Vehicle Procurement on behalf of State agencies. The JTA has been designated as the lead agency for this solicitation on behalf of transit agencies within the State of Florida and those outside of the State that may have an interest in utilizing this solicitation and resulting Contract(s) for their automated transit vehicle (rolling stock) procurement.
The JTA is soliciting proposals for the provision of highly automated transit vehicle solutions that align with our specific operational requirements and prioritize passenger safety and experience, and operational efficiency. Proposals should clearly detail the physical and operating characteristics of the base vehicle (vehicle type, passenger capacity, operating range etc.), as well as the behavioral capabilities and limitations of the automated driving system (ADS) in alignment with JTA's anticipated operational design domain (ODD) and service model. JTA is open to considering various fleet sizes, deployment models, and fleet management strategies. Proposers are encouraged to offer a range of solutions that can be tailored to JTA's evolving needs. The
JTA is seeking contracts with Proposers to be fully responsible for the sourcing and delivery of Automated Transit
Vehicles for agencies across the State of Florida and the Continental United States that desire to participate as further detailed in scope of work, Exhibit ‘A’.
Sealed Proposals will be received by the Authority, until the above-stated Proposal Closing date and time on the
JTA OpenGov Procurement Portal at https://procurement.opengov.com/portal/jtafla
Sealed Proposals will be received by the Jacksonville Transportation Authority (the “Authority” or the “JTA”), until the above-stated Submittal closing/opening dates and times on the JTA eProcurement Portal at https://procurement.opengov.com/portal/jtafla/projects/108343.
The complete Solicitation package will be available Wednesday, July 31, 2024 and may be obtained by visiting https://procurement.opengov.com/portal/jtafla/projects/108343. A complete examination and understanding of information contained in the Solicitation package is necessary in order for the Proposer to properly submit a
Proposal. The Solicitation package also includes a detailed set of Instructions to Proposers. All Proposals shall https://procurement.opengov.com/portal/jtafla https://procurement.opengov.com/portal/jtafla/projects/108343 https://procurement.opengov.com/portal/jtafla/projects/108343 be prepared in accordance with the Instructions to Proposers. The failure to comply with any requirement contained in the Solicitation may result in the rejection of the Proposal as non-responsive or a finding that the
Proposer is not qualified.
Proposals must be uploaded to the JTA eProcurement Portal by the date and time identified in this solicitation. We strongly recommend that you give yourself sufficient time and at least ONE (1) day before Closing Time to begin the uploading process and to finalize your submission. Late proposals will not be accepted and the JTA eProcurement Portal will not accept submissions past the date and time of closing/opening.
1.1. DISADVANTAGED BUSINESS ENTERPRISE (DBE)
There is no DBE participation goal for this solicitation. All Proposers are hereby notified that the DBE requirements of 49 CFR Part 26.49 apply to this solicitation. A Proposer, as a condition of being authorized to respond to this Solicitation, must certify by completing the form DBE Approval Certification that it has on file with the Federal Transit Administration (FTA) an approved or not disapproved annual disadvantaged business enterprise (DBE) subcontracting participation goal. It is the policy of the Authority to practice nondiscrimination based on race, color, sex, or national origin in the award or performance of this Contract. The
Authority encourages participation by all firms qualifying under this Solicitation, regardless of business size or ownership.
The resulting contract, if any, will be subject to contract compliance payment tracking, and the prime contractor and any DBE subcontractors shall provide any noted and/or requested contract compliance-related payment data electronically in the B2GNow Contract Compliance Program System. The prime contractor and all DBE subcontractors are responsible for responding by any noted response audit date or due date to any instructions or request for information, and to check the B2GNow Contract Compliance Program System on a regular basis.
The prime contractor is responsible for ensuring all DBE subcontractors have completed all requested items and that their contact information is up to date.
Access information related to contractor access of the system will be provided to a designated point of contact with each contractor upon award of the contract. The B2GNow Contract Compliance Program System is web-based and Contract Compliance Reporting – Vendor Training and can be accessed at the following Internet address:
https:// jtafla.dbesystem.com/FrontEnd/EventList.asp
1.2. TYPE OF PROCUREMENT
Request for Proposal - Rolling Stock
1.3. CONTRACT TYPE
Indefinite Delivery or Quantity (IDIQ/Requirements)
1.4. CONTRACT TERM
The Contract period shall be for five (5) years with no options to renew.
1.5. BASIS OF AWARD (Best Value Method)
A. This is a “best value” competitive source selection. The JTA may make multiple awards at its discretion, if any, based on the evaluation criteria set forth in Section III of this solicitation to the responsive proposer(s) whose proposal offer conforms to the solicitation and is determined to be responsible in accordance with the JTA; possesses the management, financial, technical capabilities necessary to fulfill the requirements of the contract; whose proposal conforms to solicitation requirements; and is judged by an integrated assessment of the evaluation criteria to be most advantageous to the JTA, price and other factors considered. This will be determined by comparing differences in the value of the evaluation criteria including quality, and business management features with differences in cost to the JTA. In making this comparison the JTA is determining an award with obtaining superior technical or business management features versus making an award at the lowest overall cost. However, the JTA will not make an award at a significantly higher overall cost to achieve slightly superior technical or management features. Cost is not expected to be the controlling factor in the selection of a contractor for this solicitation. The degree of importance of cost as a factor could become greater depending on the parity of the offers for the other evaluation criteria.
B. Prospective Proposers are advised that award may be made without discussions or any contact with the
Proposers concerning the offers received except for clarifications. Therefore, proposals should be submitted initially with the most favorable terms the prospective Proposer can submit to the JTA through the JTA Procurement Portal.
C. Price evaluation will be based on the total cost for all requirements which will be based on “Fixed Unit
Prices (Rates).”
D. The technical items will be evaluated by weighted averages along with Proposer Qualifications. The
JTA intends to select the Proposer based on its offering the best package of approach, technical proficiency, and economy (not in this specific order).
E. The JTA reserves the right to waive any irregularity in any Proposal, to request clarification of any
Proposal, to request additional information from any Proposer, to reject any or all Proposals, in whole or in part, and to re-advertise, cancel, or postpone the Solicitation, at any time, with or without cause, without liability to any Proposer. The JTA also reserves the right to take into consideration the
Proposer’s qualifications and past performance with the JTA or any other transit entity in determining if the Proposer is responsible and qualified.
The Authority intends to evaluate proposals and may conduct discussions with proposer(s) with the most highly ranked proposal(s). A proposal may be eliminated from the competitive range if, in the opinion of the
Evaluation Committee, the proposal has deficiencies so severe as to preclude resolution in time to be of service to the Authority or there is a need to limit the competitive range for the purpose of efficiency. Each initial proposal should contain the proposer’s best terms from a cost or price technical standpoint.
1.6. FIRM PRICE AND PRICE ESCALATION OR DE-ESCALATION
If a Contract is awarded, all prices are to remain firm for a period of one (1) year from the effective date of the contract. The JTA will consider price escalation or de-escalation prior to the annual anniversary date of the contract. Escalation and de-escalation will be reviewed by the JTA on an item-by-item basis. Proposers who are awarded a Contract and become Suppliers, Contractors, Consultants, or Vendors may request increases or decreases in price as follows:
Within at least ninety (90) days prior to the annual anniversary of the contract, the Proposer may submit a written request for escalation or de-escalation only on items for which it can no longer honor the awarded price. The request must include the item number, if applicable, a brief description of the item, and a new price that will remain firm until the next anniversary date of the contract term.
The JTA reserves the right to:
1. Grant or decline any request for escalation or de-escalation with or without cause.
2. Request documentation from the referenced parts manufacturer justifying any requested increase. In the event of such request, the Authority will only allow the Proposer to increase its proposal price by the amount of the actual increase as provided by the parts manufacturer.
3. The justification for the increase shall be based on an average of the previous twelve (12) months of the overall Producer Price Index (PPI) Series ID: WPU1413, Truck and Bus Bodies and will be capped at four and one-half percent (4.5%).
Any decision of the JTA to grant or decline a request for price adjustment will be at the JTA’s sole discretion and its decision shall be final. Annual rate adjustments for services will be at the discretion of the JTA.
Respondent is hereby notified that Section 287.05701, Florida Statutes, requires that JTA may not request documentation of or consider a Proposer’s social, political, or ideological interests when determining if the
Proposer is a responsible Proposer, and JTA may not give any preference to any Proposer based on that
Proposer’s social, political, or ideological interests.
1.7. MINIMUM REQUIREMENTS
• Proposers must be in good standing and authorized to transact business in the State of Florida and must not be listed in the System for Award Management (SAM) as an excluded party. In addition, all licenses required for Proposers whose businesses and professions are regulated by the Florida Department of
Business and Professional Regulation (SunBiz) must be active and current at the time of the proposal submission.
• Proposer must complete and submit a Buy America Certification
• Proposer must complete and submit Attachment ' A' - ADS Performance Compliance Matrix specifying
ODD parameters and JTA’s minimum performance expectations.
Failure to demonstrate compliance may result in being deemed non-responsible.
1.8. BONDS & INSURANCE
The Contract, if awarded, may require a Performance Bond and/or a Payment Bond. Specific bonding and insurance requirements are set forth in the Solicitation package. Insurance shall be written by an insurer who holds a current Certificate of Authority pursuant to Chapter 624, Florida Statutes, and who has a most recently published rating by A.M. Best & Company of “A-” or better.
1.9. QUESTIONS AND ANSWERS
All questions or concerns regarding this solicitation must be submitted on the eProcurement Portal prior to 5:00 pm (EST) on Friday, August 16, 2024. You will not be able to send messages after this time. Late questions may be answered at the sole discretion of the Authority. All responses to questions will be uploaded to the Portal and issued in an Addendum, on Thursday, August 22, 2024. Please contact the Procurement Department at procurement@jtafla.com regarding any questions or concerns prior to the questions deadline.
1.10. CONE OF SILENCE
From the date of the initial publication of this Solicitation until the contract is awarded and the protest period has expired, all communication relating to this Solicitation, with the exception of Disadvantaged Business
Enterprise (DBE) related questions, shall be sent to:
Carolyn Pride
Procurement Manager
Email: procurement@jtafla.com
(904) 632-3820
All DBE questions shall be addressed to Ken Middleton at DBE1@jtafla.com or 904-598-8728. This includes questions related to certification or assistance with finding certified DBE’s to partner with.
If you are not sure who to send a question to, please send it to procurement@jtafla.com and it will be forwarded to the appropriate personnel.
All other communication to the JTA or any JTA employee, consultant, or Board Member regarding this
Solicitation is prohibited, unless made in accordance with JTA's Solicitation and Award Protest Rule.
The JTA Board of Directors has established a zero tolerance policy and the JTA will disqualify any
Proposer who makes or causes to be made, directly or indirectly, any improper communication. Nothing contained in this paragraph prohibits JTA personnel from initiating contact with a Proposer and subsequent communication related thereto for the purpose of obtaining additional information that is relevant to the Solicitation.
mailto:procurement@jtafla.com mailto:purchasing@jtafla.com mailto:DBE1@jtafla.com mailto:purchasing@jtafla.com
Proposers are hereby notified that the JTA is subject to the Florida Public Records Law and the Government in the Sunshine Act, as set forth in Florida Statutes Chapters 119 and 286; as such, most communications to the
JTA are subject to public disclosure, and the selection meeting(s), if any, will be open to the public.
All JTA contracts are subject to funding availability and are not binding upon the Authority until duly executed by the Authority and delivered to the Proposer.
1.11. TIMELINE
Release Project Date: July 31, 2024
Pre-Proposal Meeting (Non-Mandatory): August 6, 2024, 11:00am
Ways to join:
Join from the meeting link https://jtafla.webex.com/jtafla/j.php?MTID= mc5d7bec959bc5a6ab54182a2b729980e
Join by meeting number
Meeting number (access code): 2349 957
Meeting password: ProcureP24019
Tap to join from a mobile device (attendees only)
+1-415-655-0002,,23499572965## United
States Toll
Join by phone
+1-415-655-0002 United States Toll
Global call-in numbers
Join from a video system or application
Dial 23499572965@jtafla.webex.com
You can also dial 173.243.2.68 and enter your meeting number.
If you are a host, click here to view host information.
Need help? Go to https://help.webex.com
Deadline for Questions: August 16, 2024, 5:00pm https://jtafla.webex.com/jtafla/j.php?MTID=mc5d7bec959bc5a6ab54182a2b729980e https://jtafla.webex.com/jtafla/j.php?MTID=mc5d7bec959bc5a6ab54182a2b729980e mailto:23499572965@jtafla.webex.com http://173.243.2.68/ https://help.webex.com/
Response to Questions: August 22, 2024, 5:00pm
Proposal Closing Date: September 11, 2024, 2:00pm
2. INSTRUCTIONS TO PROPOSERS
2.1. INTRODUCTION
The Jacksonville Transportation Authority (the “Authority” or “JTA”) is a public body politic and corporate agency of the State of Florida created under Chapter 349, as amended, Florida Statutes. The Authority is a transit and transportation facilities provider in North Florida, constructing and improving roadways as well as constructing, equipping and operating transit services. The Authority operates in Duval County, Florida (the
“County”), including in the City of Jacksonville, Florida (the “City”) and surrounding areas.
2.2. DEFINITIONS
o Agency: Jacksonville Transportation Authority (‘JTA’ or ‘Authority’).
o Authorized Signer: The person executing this Contract on behalf of the Contractor and authorized to bind the Contractor.
o Best and Final Offer (BAFO): The final proposal submitted by a Proposer. If the JTA does not specifically request a BAFO, the most recent, current proposal will be considered the BAFO.
o Competitive Range: The most highly rated proposals, unless further reduced for efficiency purposes.
o Contract: A properly executed written agreement between JTA and the selected Proposer resulting from this Solicitation.
o Days: Calendar days, unless otherwise specified.
o Deviation: A variance from a specified requirement that does not substantially alter the basis of the
Contract or adversely affect performance.
o Due Date: The date and time by which proposals must be received by JTA.
o Notice to Proceed: The date authorized by the Project Manager allowing the Contractor to begin work.
o Proposal(s): A Proposer's complete response to this Solicitation, including any BAFO, which, if accepted, promises the delivery of equipment and services as specified.
o Proposer: A legal entity submitting a proposal.
o Solicitation: JTA's Request for Proposal (RFP).
2.3. SOLICITATION TERMINOLOGY
The term Solicitation includes all documents that are included or referenced in the Solicitation package, including without limitation, the Request for Proposals, Notice for Publication, Instructions to Proposers, Specifications, Scope of Work, Special Conditions, Insurance Requirements, Contract Form, General
Conditions, Required Clauses for Federally-Assisted Contracts, Required Proposal Forms, Certifications, Addenda, Project Manual, Drawings, Specifications, and the documents, reports, and information referenced in such Solicitation. The terms Proposer, Contractor, and Supplier may be used interchangeably.
2.4. PROPOSER'S OFFICIAL RECEIPT OF SOLICITATION DOCUMENTS
The Proposer must request and receive the complete Solicitation package directly from the JTA OpenGov
Procurement Portal at https://procurement.opengov.com/portal/jtafla. If you submit a Proposal and you do not receive the Solicitation documents directly from the JTA OpenGov Procurement Portal, there is a serious risk that you will not be kept informed of Addenda and, therefore, your Proposal may be deemed non-responsive.
2.5. PROPOSAL DELIVERY
Proposals must be uploaded, submitted and finalized by the due date, at the location identified in the Notice for
Publication (the “Notice”), or as amended in an Addendum. No additional promotional or advertising information will be accepted. We strongly recommend that you give yourself sufficient time and at least ONE (1) day before the submission deadline to begin the uploading process and to finalize your submission. The eProcurement Portal will not allow the acceptance of late proposals. Facsimile, electronic mail and in-person deliveries will not be accepted. The Authority is the official timekeeper and the Authority's determination of the time shall be deemed correct and final.
Pursuant to Article 1, Section 24 of the Florida Constitution and under Chapter 119, Florida Statutes, if a
Respondent considers any portion of the documents, data, or records submitted in response to this solicitation to be confidential, proprietary, trade secret, or otherwise not subject to disclosure pursuant to applicable State of
Florida laws, the Respondent must provide JTA with a separate “REDACTED COPY” of its response. This redacted copy shall be submitted, on the JTA eProcurement Portal, and shall be clearly titled “REDACTED
COPY” at the same time the Bidder submits its response to the solicitation. An entire proposal or the proposed cost in a proposal cannot be identified as “CONFIDENTIAL”, “PROPRIETARY” or “TRADE SECRET”. The
Respondent must provide a brief description of the grounds for claiming exemption from public records law, including the specific statutory citation for such exemption that allows the withholding on the require form
“Certification of Redacted Copy”.
Facsimile and electronic transmissions will not be accepted. Late Proposals are not able to be accepted through the eProcurement Portal. Any responses that are delivered in person will not be accepted. The Authority is the official timekeeper and the Authority's determination of the time shall be deemed correct and final.
The Proposal should contain a cover page containing the following information:
• RFP No. and Title of Solicitation
• Name of a single point of contact
• Business name
• Address
• Phone number
• E-Mail address https://procurement.opengov.com/portal/jtafla
• RFP No. and Title
All costs associated with the preparation and delivery of a proposal are the sole responsibility of the applicable
Proposer. Proposers shall not include any such expenses as part of the price proposed in response to the solicitation/RFP.
2.6. PROPOSAL ADDENDA
The Authority may respond to questions, or it may clarify or change any part of this Solicitation by issuing an
Addendum. By submitting a Proposal, each Proposer consents to the content of all Addenda, whether or not received by the Proposer. Proposals must include the written acknowledgment of all Addenda that is contained in Section VIII. The Solicitation may only be modified or clarified by Addenda and no verbal or informal writing that attempts to modify or interpret the Solicitation will be binding upon the JTA.
2.7. PROPOSER REVIEW OF SOLICITATION AND CONTRACT DOCUMENTS
By submitting a Proposal, the Proposer represents that it has fully informed itself as to: (i) the conditions to be encountered; (ii) the character, quality, and quantities of work to be performed;; and (iii) all of the requirements of the Solicitation and Contract documents, including the plans, specifications, and the labor and security conditions under which the Contract is to be performed. The Proposer shall not be relieved of its obligation to furnish all materials, equipment, labor, and services necessary to complete the Contract by reason of having failed to inform itself with respect to those matters. If this acquisition is related to a project in which conditions, specifications, and/or plans have been issued, those documents, where applicable, are incorporated herein. The
Authority does not guarantee the accuracy of any information that may have been provided in connection with the Solicitation and if this is a lump sum Contract, the Authority does not assume any responsibility for determining the quantities required.
2.8. QUALIFICATIONS AND REFERENCES
The Authority reserves the right to request any additional information it deems necessary regarding the
Proposer’s previous experience and qualifications, and the Authority may also consider any evidence available to it regarding the financial, technical, and other qualifications and abilities of the Proposer. The Proposer shall provide any additional information requested within forty-eight (48) hours of such request.
2.9. NON-RESPONSIVE PROPOSALS MAY BE REJECTED
The failure to comply with any requirement contained in the Notice, Instructions to Proposers, Required Forms, and/or other Solicitation documents may result in the rejection of the Proposal as non-responsive.
2.10. RESERVATION OF RIGHTS IN THE SOLICITATION PROCESS.
The Authority reserves all rights it is entitled to under the law, including the right to:
• reject any or all Proposals and to cancel or postpone the Solicitation, in whole or in part, for any reason, without liability;
• issue subsequent or concurrent Solicitation(s) for the work/services described herein;
• perform background checks, reference checks, and consider any information the Authority deems pertinent to the Solicitation;
• request additional copies of the Proposal from the Proposer, at no cost to the Authority; and
• request additional or omitted information and seek clarifications of any Proposal.
2.11. REQUIRED FORMS AND CERTIFICATIONS
Proposers shall complete and return all Forms required by section "Required Forms and Certifications". The
Forms must be submitted using the exact Forms provided and must be signed by an authorized representative of the Proposer. Any alteration of the Forms or failure to submit required Forms shall cause the Proposal to be rejected as non-responsive.
The Forms cannot be marked “N/A” and returned as an effort to comply with the requirements. These Forms
MUST be completed, signed, and returned with your Proposal. The burden is on each Proposer to know of and submit all required Forms with Proposal submittals. If the Authority determines that a Proposer has failed to return completed Form(s), and/or has failed to sign all required Form(s), the Proposal shall be rejected as non-responsive .
2.12. PRE-AWARD AND POST-DELIVERY AUDIT REQUIREMENTS
The Contractor agrees to comply with 49 U.S.C. § 5323(l) and FTA's implementing regulation at 49 C.F.R. Part
663 and to submit the following certifications:
o Buy America Requirements: The Contractor shall complete and submit a declaration certifying either compliance or noncompliance with Buy America. If the Bidder/Offeror certifies compliance with Buy America, it shall submit documentation which lists 1) component and subcomponent parts of the rolling stock to be purchased identified by manufacturer of the parts, their country of origin and costs; and 2) the location of the final assembly point for the rolling stock, including a description of the activities that will take place at the final assembly point and the cost of final assembly.
o Solicitation Specification Requirements: The Contractor shall submit evidence that it will be capable of meeting the bid specifications.
o Federal Motor Vehicle Safety Standards (FMVSS): The Contractor shall submit 1) manufacturer's
FMVSS self-certification sticker information that the vehicle complies with relevant FMVSS or 2) manufacturer's certified statement that the contracted buses will not be subject to FMVSS regulations.
o If JTA cannot complete a post-delivery audit because JTA or the Procuring Agency cannot certify
Buy America compliance or that the coaches meet the purchaser's requirements specified in this contract, the coaches may be rejected and final acceptance by the Procuring Agency will not be required. JTA may exercise any legal rights it has under the contract or law.
o Contract is subject to the pre-award and post-award delivery requirements of 49 CFR Part 663.
2.13. DISADVANTAGED BUSINESS ENTERPRISE (DBE) PROGRAM
It is the official policy of the U.S. Department of Transportation (DOT) and the Authority that Disadvantaged
Business Enterprises (DBEs) have a level playing field on which to participate in the performance of all contracts. This Solicitation and contract award are subject to the requirements of Title 49 Code of Federal
Regulations, Part 26.
The Proposer and its subcontractors shall not discriminate on the basis of race, creed, color, sex, sexual orientation, gender identity, national origin, age, disability, religion, or family status in the performance of the
Contract. The Proposer shall carry out applicable requirements of the DBE program in the award and administration of the work associated with the Contract.
In accordance with 49 CFR Part 26.55, to count towards the goal the DBE must be performing a commercially useful function on the contract. If a DBE does not perform or exercise responsibility for at least 30 percent of the total cost of its contract with its own work force, or the DBE subcontracts a greater portion of the work of a contract than would be expected on the basis of normal industry practice for the type of work involved, you must presume that it is not performing a commercially useful function. This is true for a DBE Prime Contractor and lower tier DBE firms on the contract.
A. Participation Goals. If a DBE participation goal has been established for the Contract:
Proposers must meet one (1) of the following criteria to be considered for the Contract:
1. Achieve the DBE participation goal as specified below; OR
2. Submit documentation detailing its good faith efforts.
The Authority’s award of this Contract is conditioned upon Proposer satisfying the good faith effort requirements of 49 CFR §26.53.
As a condition of bid responsiveness, Proposers must submit the following information with its Bid on the forms provided herein:
1. The names and addresses of Disadvantaged Business Enterprise (DBE) firms that will participate in the contract;
2. A description of the work that each DBE firm will perform;
3. The dollar amount of the participation of each DBE firm listed under (1)
4. Written statement from Proposer or Offeror that attests their commitment to use the DBE firm(s) listed under (1) to meet the Authority’s project goal; and
5. If Proposer or Offeror cannot meet the advertised project DBE goal, evidence of good faith efforts undertaken by the Proposer or Offeror as described in appendix A to 49 CFR part 26.
The successful Proposer must provide written confirmation of participation from each of the DBE firms the
Proposer lists in its commitment within five days after Bid opening.
1. The names and addresses of Disadvantaged Business Enterprise (DBE) firms that will participate in the contract
2. A description of the work that each DBE firm will perform;
3. The dollar amount of the participation of each DBE firm listed under (1)
4. Written statement from Proposer or Offeror that attests their commitment to use the DBE firm(s) listed under (1) to meet the Authority’s project goal; and
5. If Proposer cannot meet the advertised project DBE goal, evidence of good faith efforts undertaken by the Proposer as described in appendix A to 49 CFR part 26.
I.
A. Participation Goals. If a DBE participation goal has not been established for this project, Proposers are encouraged to make every attempt to secure a level of DBE participation that contributes toward the achievement of Authority's overall DBE goal of 27%. When a goal has been established, the failure of the Proposer to either meet the participation goal or submit satisfactory evidence of good faith efforts may result in the Bid being rejected as non-responsive.
No DBE Goal Established For The Contract: Proposers are encouraged to make every attempt to obtain participation of certified DBEs and other small businesses in the completion of the Contract (race neutral).
Documenting Goal Initiatives. DBE forms will be used to document the Proposer's achievement of the established DBE goal for the Contract or, if no goal is specified, information on DBE participation. DBE forms shall be as complete and accurate as possible, and shall include all required information. Failure to comply with these requirements may be cause for rejection of the Bid. A Proposer who does not meet the stated DBE goals, where assigned, must also submit Good Faith Effort documentation as part of its Bid (see the “Good Faith Efforts” section listed below). Proposers who do not address these requirements may be deemed non-responsive.
Determining Compliance with DBE Requirements for Contracts with a DBE Goal – Forms. Each
Proposer must acknowledge its commitment to achieving the DBE participation goals set by the Authority.
There are several required forms that must be submitted as part of the Solicitation process, which support this requirement:
o Schedule of Subsuppliers/Subcontractors Form - Identifies those subcontractors/suppliers whom the
Proposer will utilize on the Contract, including the certified DBE businesses, and the scope and relative value (expressed as a percentage) of work to be performed by each subcontractor.
o Intent to Perform as a DBE - Submitted for each DBE subcontractor/supplier, outlining the dollar value of the work to be performed.
o Proposer's List - Lists all potential subcontractors/suppliers contacted by the Proposer for the
Contract.
If the Proposer is awarded a Contract with the Authority, it must enter into a formal written agreement with the
DBEs identified in its Schedule of Suppliers/Subcontractors Form in accordance with the assignments identified and outlined in the Intent to Perform as a DBE.
If the selected Proposer is a certified DBE and intends to perform a portion of the work with its own forces, the
Proposer shall identify the responsibilities it intends to perform by type and by percentage of work to be done. In order for the work to be counted towards the DBE goal assigned to the project, the Proposer must perform the work as specified and may not delegate or contract the specified responsibilities to other entities.
Certification. ALL PROPOSED DBEs MUST BE CERTIFIED BY THE FLORIDA UNIFORM
CERTIFICATION PROGRAM (UCP) AT THE TIME OF SUBMISSION OF THE BID. If a subcontractor/supplier is not certified by the aforementioned certification program at the time of submission, the
Proposer can neither report the non-certified business' participation, nor include that company's dollar value of work towards any established DBE goals. Applications for certification may be obtained from the Authority directly or from the Authority’s website at www.jtafla.com. The Proposer shall fully comply with all requests for additional documentation. In determining an applicant's eligibility for DBE status, the Authority will generally rely upon the Federal Certification Process, as described in 49 CFR Part 26. In addition, as a member of the
Unified Certification Program (UCP) within the state of Florida where FDOT is the host agency, the Authority will accept DBEs certified by FDOT and may, on a case-by-case basis, accept a DBE certification decision made by another UCP or non-Florida Department of Transportation.
Good Faith Efforts. Any Proposer who is unable to meet the requested DBE participation goal, where established, is required to include, as part of its Bid, Good Faith Effort documentation detailing the attempts made to secure DBE participation. An important component in evaluating a Proposer's good faith efforts is the number of qualified DBEs expressing an interest in performing work under the Contract. When there is limited availability of such firms, a Proposer cannot reject a DBE as unqualified unless the Proposer has sound reasons to do so, as determined by a thorough investigation of the DBE's capabilities.
The extent and type of actions required for a Proposer to meet the good faith effort requirement may vary depending upon such factors as industry practice, time available for submitting a Bid, and the type of agreement involved. See Appendix A to 49 CFR Part 26 for additional information. The following list, which is neither exclusive nor exhaustive, provides examples of the actions and activities which would be considered good faith efforts on the part of a Proposer attempting to meet the prescribed DBE goal:
A. Attending planned pre-proposal meetings scheduled by the Authority to review resources, such as certified DBE vendor lists, and to discuss, among other things, DBE participation opportunities;
B. Advertising in general circulation, trade association, and minority/women-focused media concerning subcontracting opportunities;
C. Soliciting the interest of a reasonable number of DBEs through written notices, and allowing an adequate amount of time for response and inquiry from interested parties;
D. Contacting prospective DBE participants in response to initial Solicitations to assess level of interest;
E. Utilizing subcontracting arrangements and other techniques to structure the project in a manner designed to increase the likelihood of participation of DBE firms;
F. Providing interested DBEs with adequate information about the plans, specifications, scope of work, and requirements of the Contract;
G. Discussing with interested DBEs the required capabilities of the project, and performing a thorough investigation of the DBE’s qualifications to determine inherent competencies;
H. Using good business judgment to negotiate in good faith with interested DBEs regarding price, and reviewing all reasonable quotes from interested DBE businesses;
I. Assisting interested DBEs in obtaining bonding, lines of credit, insurance, and other guarantees required by the Authority and/or the Proposer;
J. Supporting interested DBEs in obtaining necessary equipment, supplies, materials, or related assistance and services; and
K. Effectively utilizing the services of various community and professional organizations to aid in identifying qualified DBEs. These organizations include, but are not limited to minority and women-based: community organizations; chambers of commerce; contractor groups; local, state, and federal business assistance offices; the Authority; and other organizations that provide assistance in the identification of DBEs.
These efforts are active steps, ones that may significantly increase the potential for sufficient DBE participation and the achievement of DBE participation goals. When the Authority determines that the Proposer's actions were mere pro forma efforts that fall short of the good faith efforts such as those listed above, the Bid may be rejected as non-responsive.
2.14. PROPOSER DISQUALIFICATION
Any of the following causes may be considered sufficient for the disqualification of a Proposer and the rejection of its Proposal:
A. submission of more than one (1) Proposal from a Proposer for the same work by an individual, entity, partnership, or corporation under the same or different names;
B. evidence of collusion between or among Proposers;
C. work for which the Proposer is committed by contract, which, in the Authority's judgment and sole discretion, might hinder or prevent the prompt completion of the Contract if awarded to the Proposer;
D. being behind on the approved completion schedule for any existing contract or contract completed within two (2) years of the Proposal Closing date with the Authority where the Contractor has been assessed liquidated damages, being involved in litigation with the Authority, or having been declared by the Authority to be in default on a previous contract with the Authority;
E. poor, negligent, or defective performance of work for the Authority or any other party on prior projects, which, in the Authority's judgment and sole discretion, raises doubts as to the Proposer's ability to properly perform the Contract;
F. appearance of the Proposer on the Department of General Services' Convicted Vendors List; debarment or suspension of the Proposer by the Authority pursuant to the Authority’s Administrative Rule 003; or for “covered transactions,” as that term is defined in 49 CFR Part 29, with a value greater than $25,000, if the Proposer is presently debarred, suspended, proposed for debarment, or declared ineligible for the award of contracts by any Federal agency;
G. violating the Cone of Silence;
H. having any real or apparent conflict of interest, including any relationship with or interest in those firms who have assisted the Authority in the preparation of the Solicitation;
I. misstating or omitting a material fact in the Proposal, submitting a Proposal that is conditional, or submitting a proposal that contains unauthorized conditions, limitations, exceptions, or alterations;
J. failing to properly: (i) execute any Form; (ii) execute any Proposal Security; (iii) execute other required documents; or (iv) meet the minimum requirements of the Solicitation; or
K. any other reason, as determined in the sole discretion of the Authority, that warrants rejection of the
Proposal or disqualification of the Proposer, including listing unqualified subcontractors or failing to provide adequate references for the Proposer and/or any subcontractors upon request.
The Authority may cancel or postpone the Solicitation and may reject any and all Proposals, with or without cause, and may waive any minor irregularity in any Proposal.
2.15. TAXES
The Authority is exempt from the following taxes: (a) State of Florida Sales Tax by Certificate No.85-
8012646346C-1; and (b) Federal Excise Tax Registration No. 59-6018367. The only purchases allowed to be made using these exemptions are to be made on either an Authority Purchase Order or an Authority check. The sales tax exemption does not apply to goods or services that are purchased or consumed by the Proposer for which the Proposer is deemed to be the ultimate consumer.
2.16. CARTAGE
All cartage and package charges shall be included in the Proposal price.
2.17. DEVIATIONS TO SPECIFICATIONS
All requests for deviations from the specifications must be submitted as a written question prior to the deadline for questions. Proposals may be rejected as non-responsive if deviations are used without being approved in an
Addendum.
2.18. DISCOUNTS
Prompt payment discounts will be considered during the administration of the Contract, but will not be considered when evaluating the Proposal.
2.19. PROVISION FOR OTHER AGENCIES
By signing and submitting its Proposal, the Proposer hereby agrees to extend the terms, conditions, and other negotiated agreements to any Transit Authority, or any City, County, or State Government agency within the
State of Florida. It is understood that some negotiated agreements may require further negotiations between the successful Proposer and the entity desiring to benefit from this Solicitation. Any such resulting agreements will be independent of the Authority.
The work is to begin only after proper authorization and issuance of a Purchase Order or a Notice to Proceed is issued from the respective agency.
2.20. PROCUREMENT DEPARTEMENT AS AGENT
When the Procurement Department is acting as agent for “other public activities” defined as activities receiving financial support in part from the Authority but not under the direct governing jurisdiction of the Authority, the name of such public activity shall be substituted for the words “JTA” and “Authority” throughout the
Solicitation and Contract.
2.21. ETHICS PROVISION
The Proposer, by affixing its signature to the Proposal and/or by accepting a Purchase Order, represents that it has reviewed the provision of the Jacksonville Ethics Code contained in chapter 602, Jacksonville Ordinance
Code, and the provisions of the Procurement Code contained in chapter 126, Jacksonville Ordinance Code.
2.22. ACKNOWLEDGEMENT AND AGREEMENT TO CONTRACT TERMS
By signing the Proposal, the Proposer acknowledges its agreement to all terms, conditions, and specifications contained in this Solicitation and resulting Contract, if any. When the Authority issues a Purchase Order(s), the
Proposer shall comply with all the terms, conditions, and specifications contained in this Solicitation and resulting Contract, per the Order of Precedence in the Contract, until expiration or termination of the
Contract. The work is to begin only after proper authorization and issuance of a Purchase Order or a Notice to
Proceed.
2.23. NO PROPOSAL PREP COSTS
Under no circumstances will the Authority compensate any Proposer for the costs associated with responding to this Solicitation.
2.24. ALL-INCLUSIVE PROPOSAL
The Proposal shall include, at no additional cost to the Authority, all necessary safety equipment: in addition, all necessary taxes, licenses, permits, and insurance shall also be obtained by the Proposer at no additional cost to the Authority.
2.25. REQUEST FOR CLARIFICATION AND SUPPLEMENTAL INFORMATION
The Authority reserves the right to seek clarification and supplemental information from any or all Proposers when the Proposal contains any information or implication that is ambiguous.
2.26. PUBLIC RECORDS AND GOVERNMENT IN THE SUNSHINE LAWS
The Authority is subject to the Florida Public Records Law, the Government in the Sunshine Act, and possibly the Freedom of Information Act (FOIA). In compliance therewith, at the sole discretion of the Authority, the
Authority may disseminate or make available to any person, without the consent of the Proposer, information regarding the Contract or the Proposal, including without limitation: requirements; specifications; drawings;
sketches; schematics; models; samples; tools; computer or other apparatus programs; and technical information or data, whether or written or oral, furnished to the Authority in connection with this Solicitation.
2.27. AVAILABILITY OF PROPOSALS AFTER OPENING
In accordance with the Florida Public Records Law, Chapter 119, Florida Statutes, copies of all Proposals are available for public inspection thirty (30) days after the opening of Proposals or on the date of Notice of Intent to
Award, whichever is earlier. Proposers may review opened Proposals once they are available for public inspection by contacting the JTA Public Records Office at publicrecords@jtafla.com.
mailto:publicrecords@jtafla.com
If JTA rejects all Proposals submitted in response to a competitive Solicitation and concurrently provides notice of its intent to reissue the competitive Solicitation, the rejected Proposals remain exempt from §§
119.07(1) and 119.24(a), Florida Statutes, Art. I of the State Constitution until such time as JTA provides notice of an intended decision concerning the reissued competitive Solicitation or until JTA withdraws the reissued competitive Solicitation. A Proposal is not exempt for longer than twelve (12) months after the initial notice rejecting all Proposals.
2.28. PROHIBITION AGAINST CONTRACTING WITH SCRUTINIZED COMPANIES.
By submitting a proposal:
A. The Contractor hereby certifies that it is not on the Scrutinized Companies that Boycott Israel List and is not engaged in a boycott of Israel, as defined in Florida Statutes § 287.135, as amended;
B. When the contract value is $1,000,000 or more; the Contractor hereby certifies that it is: (1) not on the
Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the
Iran Petroleum Energy Sector List as defined in Florida Statutes § 287.135; and (2) not engaged in business operations in Cuba or Syria, as defined in Florida Statutes § 287.135, as amended.
2.29. STANDARD ASSURANCES (including Non-Collusion and Debarment Certifications)
By submitting a signed Proposal, each Proposer certifies, under penalty of perjury, that:
A. The Proposer understands all requirements and, if selected, the Proposer will comply with all of the requirements of the Solicitation, the Proposal, and any resulting Contract.
B. The signatory of the Proposer is of lawful age, and no other person, firm, or corporation, other than those clearly identified in the Proposal, has any interest in the Proposal and/or any resulting Contract.
C. The Proposal is made without any understanding, agreement, or connection with any other Proposer or potential Proposer for the Contract, and is in all respects fair and without collusion or fraud; no attempt has been made or will be made by the Proposer to induce any other person, entity, partnership, or corporation to submit or not submit a Proposal for the purpose of restricting competition.
D. The Proposer is familiar with, and the Proposal is in full compliance with, all applicable federal, state, and local laws and regulations, and the Proposer shall fully comply with same during the entire term of the
Contract. The Proposer certifies that the Proposal complies with all applicable safety requirements, such as those required by OSHA, EPA, and the Authority.
E. The Proposer is not precluded from submitting a Proposal under Section 287.133(2)(a), Florida Statutes, which provides that a person or affiliate (as defined by Florida law) who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Proposal or reply on a contract to provide any goods or services to a public entity; may not submit a Proposal or reply on a contract with a public entity for the construction or repair of a public building or public work; may not submit Proposals or replies on leases of real property to a public entity; may not be awarded or perform work as a contractor, supplier, subcontractor, or contractor under a contract with any public entity; and may not transact business with any public entity in excess of the threshold amount provided in Florida Statutes section http://www.lawserver.com/law/state/florida/statutes/florida_statutes_119-07
287.017, for Category Two, for a period of thirty-six (36) months from the date of being placed on the convicted vendor list. By submitting a signed Proposal, the Proposer certifies, under penalty of perjury, that no person, entity, or affiliate involved in the Proposal is in violation of the restriction noted above.
F. If the Proposal is over one hundred thousand dollars ($100,000), the Proposer understands that the
Contract awarded under this Solicitation, if any, is a covered transaction for purposes of the following statutes and regulations and the Proposer is required to comply with 2 CFR Part 1200, 2 CFR Part 180, Executive Orders 12549 and 12689, and 31 U.S.C. § 6101 note, as each may be amended from time to time. By submitting a signed Proposal, the Proposer certifies, that:
1. The Proposer is not currently…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .