Stanislaus_FireInspectionForm_MSA.pdf
PDF 608 KB Posted
- Attached to
- Mechanical Site Prep: Cherry West Item 1
- Solicitation number
- RFP-2025-0153
- Issued by
- Tuolumne County, Santa Monica City, California
About this file
This is a Fire Inspection Form document prepared for the County of Tuolumne in partnership with the USDA Forest Service, Stanislaus National Forest, as part of the Yosemite Stanislaus Solutions Collaborative. The document establishes inspection protocols and requirements for the Cherry West Project, a mechanical site preparation and fuels reduction initiative spanning approximately 535.90 acres. The project includes mastication and piling operations with associated reforestation treatments authorized under a Master Stewardship Agreement. Priority work units M014A and M014C are scheduled to commence no earlier than June 2027 with completion required by October 31, 2027, enabling spring 2028 planting. All remaining units must be completed by October 31, 2028, for fall 2028 planting. The project site is located at approximately 6,000 feet elevation and may experience seasonal inaccessibility due to snow cover, necessitating contractor planning and scheduling to meet established deadlines.
The County of Tuolumne intends to select qualified contractors through a best-value procurement process based on specifications detailed in the solicitation's Scope of Services. The fire inspection form serves as a quality assurance and compliance verification tool to ensure work meets established treatment standards and environmental requirements. Contractors must demonstrate capability to execute mechanical site preparation activities in accordance with Forest Service standards and must account for challenging terrain and weather conditions inherent to high-elevation operations. Funding for the project derives from the County's collaborative agreement with the USDA Forest Service under the Master Stewardship Agreement framework.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT NAME_______________________________________________ CONTRACT #____________________________________________
Shovel
Size(0)
46"
Axe
(2.5 lb)
28"
Fire Extinguisher
Other:
ID Number, Spark Arrestor Type, Remarks:
Trucks/Pick-ups 1 each 1 each 1
Skidder 1 each 1 each (1) 5 BC each 1
Dozer/Tractor 1 each 1 each (1) 5 BC each 2 Headlights for each 1
Loader (1) 4:A:60:-B-C each 1
Yarder (1) 4:A:60:-B-C each 1
Fuel truck/trailer 1 each 1 each (1) 4:A:60:-B-C each
Stroke Delimber
(2) 4:A:60:-B-C/or CAFS each Clean Debris Daily 1
Chipper
(2) 4:A:60:-B-C/or CAFS each Clean Debris Daily 1
Cable Yarding
Tail/Corner
Blocks
1 each 5 gal backpack pump/or
4-A extinguisher w/in
25'
15' Clearing radius
Log Truck 1 each 1 each
Grader 1 each 1 each
A shovel per gas can
< 300' away, spark arrester with
0.023"screen
Faller with
Power saw 1 (38") 14 Oz. Fire Kill
SPECIFIED FIRE PRECAUTIONARY MEASURES
Hotsaws
Harvester
Forwarder
Feller/Buncher
Mechanical
Harvester
Masticator
1 each 1 each (2) 4:A:60:-B-C/or CAFS each
Clean Debris Daily
Please note that different operational equipment is used for different contracts and may not be present for every contract. The operational equipment to be used to conduct contract work must comply with its associated fire precautionary measures.
Equipment for operations per saw per saw
CONTRACT NAME_______________________________________________ CONTRACT #____________________________________________
*1 Chainsaw with 20"bar@ active landing *1 spark plug & wrench
*1 can bar oil and fuel for 2 hr operation *1 quart motor oil
*1 spare saw chain, sharp and serviceable *1 8" cresent wrench
*1 extra sparkplug for chainsaw and file *1 screwdriver
*1 combo tool for changing spark plug 2 hrs extra fuel
*2 falling wedges *1 slip joint pliers
2 axes *1 extra starter rope
2 scraping tools (McLeods) *1 grease gun w/grease
Shovels to equip everyone else *2 spanner wrenches
Pump to deliver 23 gal./min. @175 lb/sq. in. (y/n):
Pump equipped with 1 1/2 in. NSFH
Bypass or pressure relief valve for other than centrifugal pumps.
300' of 3/4" i. d. rubber jacket hose (50' sections), mounted on reel shut-off combination nozzle that deliver 38' straight stream @
Additional 250' light weight hose for use with hotsaw/masticator
3/32" (.09 in)screen at intake for use in T & E species streamcourses
2 headlights if not on dozer *Hose gaskets assorted
1 filled backpack pump (5 gal.)
FIRE TOOL BOX
SPECIFIED FIRE PRECAUTIONARY MEASURES
FIRE TANK TRUCK FULL WITH 300 GALLONS OF WATER
To be located on or adjacent to active landing on PAL level B or above
Date
Date
Date
Forest Service Representative Signature
Field Rep. Signature
Field Rep. Signature
Formula To Determine Tank Volume (all dimensions in INCHES)
Round or Oval - D x D x L x 0.0034 = Gallons
Square or Rectangular Tank - H x W x L x 0.004329 = Gallons
*Examples of items to maintain "necessary service accessories"
STANISLAUS NATIONAL FOREST DAILY PROJECT ACTIVITY LEVELS (PAL) Call: 209-532-5601 after 5 p.m.
Clearing of Fuels: Welding-10 ft; Tail or corner haulback blocks-15 ft; Smoking- 3 ft
Is communication system in place (15 Min)? Y/N _________________
1. Are all fire extinguishers mounted, readily accessible, properly maintained and fully charged (y/n):
2. Are all vehicles subject to registration equipped with adequate exhaust systems meeting CA vehicle code (y/n):
3. Is each operating tractor and any other ICE equipped with a spark arrester (except for vehicles equipped with a main with a maintained muffler as defined in
C.P.R.C. Section 4442 or tractors with exhaust-operated turbochargers) (y/n):
4. Are spark arresters model tested, approved under Forest Service Standard 5100-1a as shown in the National Wildlife Coordinating Group Spark Arrester Guide, Volumes 1 and 2, and in good operating condition (y/n):
5. Is each power saw equipped with a spark arrestor approved according to
6. When Contractor is using Hot Saws or Masticators is an additional 250 feet of light weight hose, approved by the Forest Service, immediately available for use and capable of connecting to the 300 feet of hose (y/n):
7. Is there a Fire Patrolperson identified (y/n):
10GPM
Notes:
Seal #____________________________________________
PAL at time of inspection:
Did the contractor pass this fire inspection? (Y/N):
Is a reinspection needed? (y/n):
| CONTRACT NAME: |
| CONTRACT: |
| ID Number Spark Arrestor Type Remarks: |
| Fire Extinguisher1: |
| Other1: |
| 1: |
| TrucksPickups: |
| 2: |
| 3: |
| 4: |
| Skidder: |
| 1 5 BC: |
| 1_2: |
| 1_3: |
| 2_2: |
| 3_2: |
| 4_2: |
| 1_4: |
| DozerTractor: |
| 2_3: |
| 3_3: |
| Loader: |
| 1 4A60BC: |
| 1_5: |
| Loader_2: |
| 2_4: |
| 3_4: |
| Yarder: |
| 1 4A60BC_2: |
| 1_6: |
| Yarder_2: |
| 2_5: |
| 3_5: |
| 1 4A60BC_3: |
| 1_7: |
| 2_6: |
| 1_8: |
| 2_7: |
| 3_6: |
| 4_3: |
| 5: |
| 1Stroke Delimber: |
| 1_9: |
| 2_8: |
| Chipper: |
| 1_10: |
| 2_9: |
| 1 38: |
| 1_11: |
| 2_10: |
| 3_7: |
| 4_4: |
| 1_12: |
| TailCorner: |
| 5_2: |
| 5 gal backpack pumpor 4A extinguisher win 251: |
| 15 Clearing radius1: |
| 51: |
| Grader: |
| 5 gal backpack pumpor 4A extinguisher win 251_2: |
| 15 Clearing radius1_2: |
| 51_2: |
| CONTRACT NAME_2: |
| CONTRACT_2: |
| 1 combo tool for changing spark plug: |
| 2 falling wedges: |
| 2 axes: |
| 2 scraping tools McLeods: |
| Shovels to equip everyone else: |
| 2 headlights if not on dozer: |
| Is communication system in place 15 Min YN: |
| Seal: |
| undefined: |
| Date: |
| Date_2: |
| Notes: |
| Text4: |
| Text5: |
| Text6: |
| Text7: |
| Text8: |
| Text9: |
| Text10: |
| 2 hrs extra fuel: |
| 1 screwdriver: |
| Text11: |
| Text12: |
| Text13: |
| Text14: |
| Text15: |
| Text16: |
| Text17: |
| Text18: |
| Text19: |
| Text20: |
| Text21: |
| Text22: |
| Text23: |
| Text24: |
| Text25: |
| Text26: |
File details come from the government source that posted it. Updated .