This is a contract document package for the construction of a comfort station facility at St. Maurice Recreation Area in Winn Parish, Louisiana, issued by the Red River Waterway Commission. The project encompasses the construction of earthwork, concrete paving, a new comfort station, an onsite treatment system, an ADA parking spot, and a water service line. Sealed bids are due on Tuesday, December 8, 2026, at 10:00 a.m. local time at the Red River Waterway Commission office located at 5941 Highway 1 Bypass, Natchitoches, Louisiana 71458. A non-mandatory pre-bid conference is scheduled for Tuesday, December 1, 2026, at 10:00 a.m. at 100 Engineer Place, Alexandria, Louisiana. The contract is awarded to the lowest responsible bidder and is designated as Project 26-01, Contract No. RRW-862. Substantial completion is required within 180 days of contract commencement, with final completion and readiness for payment within 225 days. The engineer of record is Meyer, Meyer, LaCroix & Hixson, Inc.
Bidders must submit bid security equal to five percent of their maximum bid price in the form of a certified check, cashier's check, or bid bond. The successful bidder must provide performance and payment bonds each equal to 100% of the contract amount. Bids shall be submitted on a unit price basis and must include the Louisiana contractor's license number on the sealed envelope. Electronic bid submission is permitted through www.bidnetdirect.com with associated fees and digital signature certificate requirements. Liquidated damages are assessed at $200 per day for failure to achieve substantial completion and $200 per day for failure to complete remaining work within contract time. Contract retainage follows Louisiana state law: ten percent for contracts valued under $500,000 and five percent for contracts valued at $500,000 or more, retained until substantial completion and lien-free certification. No specific set-asides are identified in the bidding documents. All contract documents must be obtained from the Red River Waterway Commission, and bids received from contractors using other document sources will be returned unopened.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID
D
OCUM
ENTS M
UST B
E O
BTAIN
ED F
ROM
R
RW
C T
O S
UBM
IT
B
ID
CONTRACT DOCUMENTS AND SPECIFICATIONS
FOR
ST. MAURICE RECREATION AREA COMFORT STATION
FOR
RED RIVER WATERWAY COMMISSION
PROJECT 26-01
CONTRACT NO. RRW-862
WINN PARISH, LOUISIANA
TABLE OF CONTENTS
DIVISION I - BIDDING FORMS PAGE(S)
Advertisement for Bids 2 Instructions to Bidders 11 Louisiana Uniform Public Works Bid Form 1 Bid Bond 2 Attestations Affidavit 2 Non-Collusion Affidavit of Prime Bidder 1 Firearm Entity Nondiscrimination 1
DIVISION II - CONTRACT FORMS
Notice of Award 1 Agreement (Stipulated Price) 7 Performance Bond 3 Payment Bond 3 Affidavit - Contractor 1 Notice to Proceed 1 Application for Payment 3 Contractor’s Affidavit of Payment 1 Change Order 1 Substantial Completion of 1 Insurance Certificate 1
DIVISION III - GENERAL AND SUPPLEMENTARY CONDITIONS
General Conditions 65 Supplementary General Conditions 18
DIVISION IV – GENERAL REQUIREMENTS
General Requirements 6
DIVISION V – TECHNICAL SPECIFICATIONS
01010 – Summary of Work 1 01025 – Measurement and Payment 1 01200 – Project Meeting 1 01300 – Submittals 2 01410 – Testing Laboratory Services 1 01500 – Construction Facility and Temporary Controls 2
BID
D
OCUM
ENTS M
UST B
E O
BTAIN
ED F
ROM
R
RW
C T
O S
UBM
IT
CONTRACT DOCUMENTS AND SPECIFICATIONS
FOR
ST. MAURICE RECREATION AREA COMFORT STATION
FOR
RED RIVER WATERWAY COMMISSION
PROJECT 26-01
CONTRACT NO. RRW-862
WINN PARISH, LOUISIANA
TABLE OF CONTENTS (cont’d)
DIVISION V – TECHNICAL SPECIFICATIONS PAGE(S)
01565 – Environmental Protection 3 01568 – Erosion Control 3 01700 – Contract Closeout As-Built Drawings 2 02140 – Existing Utilities 2 00 30 00 – Incorporated LaDOTD Standard Specifications 2 00 04 00 – Non-Standard Pay Items 1 03 30 00 – Cast-in-Place Concrete 11 04 22 10 – Concrete Masonry Building 6 09 91 00 – Painting and Coating 8 26 05 10 – Electrical 7 31 11 00 – Clearing and Grubbing 2 31 23 16 – Excavation and Backfill for Buildings 4 33 11 00 – Water Distribution System 34
OCUM
ENTS M
UST B
E O
BTAIN
ED F
ROM
R
RW
C T
O S
UBM
IT
DIVISION I
BIDDING FORMS
BID
D
OCUM
ENTS M
UST B
E O
BTAIN
ED F
ROM
R
RW
C T
O S
UBM
IT
ADVERTISEMENT FOR BIDS
RED RIVER WATERWAY COMMISSION
ST. MAURICE RECREATION AREA COMFORT STATION
Separate sealed bids for the construction of the St. Maurice Recreation Area Comfort Station will be received by the Red River Waterway Commission at the office of the Red River Waterway Commission at 5941 Hwy 1 Bypass, Natchitoches, LA 71458 until 10:00 a.m. local time on Tuesday, December 8, 2026, and then at said location publicly opened and read aloud.
If forwarded by mail, the sealed envelope containing the bid must be enclosed in another envelope addressed to the Red River Waterway Commission, P.O. Box 776, Natchitoches, LA 71458.
The Bidding Documents may be examined at the office of the Owner:
RED RIVER WATERWAY COMMISSION
TELEPHONE (318) 352-7466
5941 HIGHWAY 1 BYPASS
NATCHITOCHES, LOUISIANA 71458
Bidding documents on a USB flash drive may be obtained from the office of the Owner.
Prime Bidders must obtain Bidding Documents from the Owner. Bids received from Contractors utilizing any other Bidding Document source will be returned unopened.
Each bid must be accompanied by bid security made payable to Owner in an amount of 5 percent of bidder’s maximum bid price and in the form of a certified check, cashier’s check or a bid bond. The successful bidder will be required to obtain a Performance Bond and a Payment Bond each in the amount of 100% of the contract amount. All bonds shall be executed by such sureties as are named in U.S. Department of the Treasury Circular 570.
A bond signed by an agent or attorney-in-fact must be accompanied by a certified copy of that individual’s authority to bind the surety.
Bidders may not withdraw their bid within forty-five (45) days after the actual date of opening thereof. The Owner reserves the right to reject any and all bids for just cause in accordance with Louisiana R.S. 38:2214B.
Bidders have the option to submit bids electronically. Bidders seeking to submit bids electronically shall register online at www.bidnetdirect.com. Bidders choosing to submit electronic bids online will be charged a fee by Bidnet Direct. Additionally, contractors shall obtain a digital signature certificate prior to submitting bids online. Electronic bids shall be accompanied by the bid security and power-of-attorney required by this solicitation.
Bidders electing to submit bids electronically shall follow procedures as established by Bidnet Direct. Proper and timely submission of an electronic bid is the responsibility of the
BID
D
OCUM
ENTS M
UST B
E O
BTAIN
ED F
ROM
R
RW
C T
O S
UBM
IT
B http://www.bidnetdirect.com/
Bidder. Bidders are encouraged to complete the electronic bid documents in advance of bid closing. Late bids due to malfunction of internet infrastructure, certificate service providers, electronic bid bond providers, or other interruptions shall not be accepted. The Owner is not responsible for damages, lost revenue, etc., for bids not timely received due to malfunctions or breakdown of the either the internet or the electronic bidding service.
Telephone or facsimile bids are invalid and shall not receive consideration.
All bidders are encouraged to attend a Non-mandatory Pre-Bid Conference to be held at the Office of the Engineer at 100 Engineer Place, Alexandria, Louisiana on Tuesday, December 1, 2026, at 10:00 a.m., local time.
Date: November 6, 2026 /s/ Colin Brown
Executive Director
Publishing Dates: November 12, 19, and 26, 2026
D
OCUM
ENTS M
UST B
E O
BTAIN
ED F
ROM
R
RW
C T
O S
UBM
IT
EJCDC® C-200, Suggested Instructions to Bidders for Construction Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page i
INSTRUCTIONS TO BIDDERS
TABLE OF CONTENTS
Page Article 1 – Defined Terms
Article 2 – Copies of Bidding Documents
Article 3 – Qualifications of Bidders
Article 4 – Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program;
Other Work at the Site
Article 5 – Bidder’s Representations
Article 6 – Pre-Bid Conference
Article 7 – Interpretations and Addenda
Article 8 – Bid Security
Article 9 – Contract Times
Article 10 – Liquidated Damages
Article 11 – Substitute and “Or-Equal” Items
Article 12 – Subcontractors, Suppliers, and Others
Article 13 – Preparation of Bid
Article 14 – Basis of Bid
Article 15 – Submittal of Bid
Article 16 – Modification and Withdrawal of Bid
Article 17 – Opening of Bids
Article 18 – Bids to Remain Subject to Acceptance
Article 19 – Evaluation of Bids and Award of Contract
Article 20 – Bonds and Insurance
Article 21 – Signing of Agreement
Article 22 – Retainage
Article 23 – Project Classification
Article 24 – Additional Submittals by Bidders
OCUM
ENTS M
UST B
E O
BTAIN
ED F
ROM
R
RW
C T
O S
UBM
IT
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1
ARTICLE 1 – DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office – The office from which the Bidding Documents are to be issued.
ARTICLE 2 – COPIES OF BIDDING DOCUMENTS
2.01 Complete sets of the Bidding Documents may be obtained from the Issuing Office in the number and format stated in the advertisement or invitation to bid. The cost per set of Bidding Documents represents the actual cost of reproduction and handling and is not refundable.
2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use.
2.04 The Engineer acts as an agent of the Owner for the purpose of issuing Bidding Documents.
2.05 Prime Bidders shall obtain Bidding Documents from the Engineer. Bids received from Contractors utilizing any other Bidding Document source will be returned unopened.
ARTICLE 3 – QUALIFICATIONS OF BIDDERS
3.01 Pursuant to a request by the Owner, either directly or through the Engineer, to demonstrate Bidder’s qualifications to perform the Work, after submitting its Bid and within 10 days of Owner’s request, the low Bidder shall submit written evidence establishing its qualifications such as financial data, previous experience, present commitments and other such information as requested. Such request by Owner will be made within 2 working days of the Bid opening.
3.02 A Bidder’s failure to submit required qualification information within the time indicated may disqualify Bidder from receiving an award of the Contract.
3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
3.04 Bidder is advised to carefully review those portions of the Bidding Documents requiring Bidder’s representations and certifications.
ARTICLE 4 – SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S
SAFETY PROGRAM; OTHER WORK AT THE SITE
4.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands are to be obtained and paid for by Contractor.
BID
D
OCUM
ENTS M
UST B
E O
BTAIN
ED F
ROM
R
RW
C T
O S
UBM
IT
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 2
4.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify:
a. those reports possessed by Owner of explorations and tests of subsurface conditions at or adjacent to the Site that Engineer has used in preparing the Bidding Documents.
b. those drawings possessed by Owner of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities) that Engineer has used in preparing the Bidding Documents.
c. reports and drawings possessed by Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site that Engineer has used in preparing the Bidding Documents.
d. Technical Data contained in such reports and drawings.
2. Owner will make electronic copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.
B. Underground Facilities: Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site are set forth in the Contract Documents and are based upon information and data furnished to Owner and Engineer by owners of such Underground Facilities, including Owner, or others. Such information is not known to be either complete or accurate.
C. Adequacy of Data: Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions, and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated subsurface or physical conditions appear in Paragraphs 5.03, 5.04, and 5.05 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work, appear in Paragraph 5.06 of the General Conditions.
4.03 Site Visit and Testing by Bidders
A. Bidder shall conduct any Site visits during normal working hours and shall not disturb any ongoing operations at the Site.
B. Bidder may conduct such subsurface testing or investigations of Site conditions as he chooses. Coordinate any such work with the Engineer.
BID
D
OCUM
ENTS M
UST B
E O
BTAIN
ED F
ROM
R
RW
C T
O S
UBM
IT
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 3
C. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security, or safety concerns, or restraints on Owner’s authority regarding the Site.
D. Bidder shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
E. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests and studies.
4.04 Other Work at the Site
A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
ARTICLE 5 – BIDDER’S REPRESENTATIONS
5.01 It is the responsibility of each Bidder before submitting a Bid to:
A. examine and carefully study the Bidding Documents, and any data and reference items identified in the Bidding Documents;
B. visit the Site, conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
C. become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work;
D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings;
E. consider the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and any Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs;
BID
D
OCUM
ENTS M
UST B
E O
BTAIN
ED F
ROM
R
RW
C T
O S
UBM
IT
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 4
F. agree, based on the information and observations referred to in the preceding paragraph, that at the time of submitting its Bid no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents;
G. become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;
H. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;
I. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work;
and
J. agree that the submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.
ARTICLE 6 – PRE-BID CONFERENCE
6.01 A non-mandatory pre-bid conference will be held at the time and location stated in the invitation or advertisement to bid. Representatives of Owner and Engineer will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference. Engineer will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.
ARTICLE 7 – INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding.
Oral and other interpretations or clarifications will be without legal effect.
7.02 Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents.
ARTICLE 8 – BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent of Bidder’s maximum Bid price and in the form of a certified check, cashier’s check or a Bid bond (on the form included in the Bidding Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and 6.02 of the General Conditions.
8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract Documents, furnished the required contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, BID
D
OCUM
ENTS M
UST B
E O
BTAIN
ED F
ROM
R
RW
C T
O S
UBM
IT
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 5
Owner may consider Bidder to be in default, annul the Notice of Award, and exercise its rights under the Bid Bond.
8.03 The Owner will have the right to retain the Bid security of Bidders until either (a) the Contract has been executed and bonds have been furnished, or (b) the specified time has elapsed so that bids may be withdrawn, or (c) all bids have been rejected.
ARTICLE 9 – CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be substantially completed and ready for final payment are set forth in the Agreement.
ARTICLE 10 – LIQUIDATED DAMAGES
10.01 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.
ARTICLE 11 – SUBSTITUTE AND “OR-EQUAL” ITEMS
11.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, and those “or-equal” or substitute materials and equipment subsequently approved by Engineer prior to the submittal of Bids and identified by Addendum. No item of material or equipment will be considered by Engineer as an “or-equal” or substitute unless written request for approval has been submitted by Bidder and has been received by Engineer at least seven (7) working days prior to the date for receipt of Bids.
Each such request shall comply with the requirements of Paragraphs 7.04 and 7.05 of the General Conditions, as amended by the Supplementary Conditions. The burden of proof of the merit of the proposed item is upon Bidder. Within three (3) days, exclusive of holidays or weekends, after submission, the Engineer will furnish to both the public entity and the potential supplier written approval or denial of the product submitted. Engineer’s decision of approval or denial of a proposed item will be final. Disapproved submittals will not be re-reviewed for any reason including but not limited to the incompleteness of the initial submittal. If Engineer approves any such proposed item, such approval will be set forth in an Addendum issued to all prospective Bidders. Bidders shall not rely upon approvals made in any other manner.
11.02 When in the Bidding Documents a particular brand, make of material, device, or equipment is shown or specified, such brand, make of material, device, or equipment shall be regarded merely as a standard. The name of a certain brand, make, manufacturer, or definite specifications is to denote the quality standard of the article desired, but does not restrict bidders to the specific brand, make, manufacturer, or specification named. It is to set forth and convey to prospective bidders the general style, type, character, and quality of article desired.
11.03 All prices that Bidder sets forth in its Bid shall be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 12 – SUBCONTRACTORS, SUPPLIERS, AND OTHERS
12.01 If required by Article 24 Additional Submittals by Bidders or requested in writing by the Owner, the low Bidder shall within 10 days after the Bid opening, submit to Owner a list of the Subcontractors, Suppliers, individuals or entities proposed for those portions of the Work for
BID
D
OCUM
ENTS M
UST B
E O
BTAIN
ED F
ROM
R
RW
C T
O S
UBM
IT
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 6 which such identification is required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, or other individual or entity.
ARTICLE 13 – PREPARATION OF BID
13.01 An electronic copy of the Bid Form is included with the Bidding Documents. The Bidder is to print and fully complete the form as indicated below.
A. All blanks on the Bid Form shall be completed in ink and the Bid Form signed in ink.
Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each Bid item, unit price item, alternate and adjustment unit price item listed therein.
B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid”, “No Change”, “Not Applicable” or “0.”
13.02 A corporate resolution or written evidence of the authority of the person signing the bid for public works shall be submitted at the time of bidding. The authority of the signature of the person submitting the bid shall be deemed sufficient and acceptable if any of the following conditions are met:
A. The signature on the bid is that of any corporate officer listed on the most current annual report on file with the secretary of state, or the signature on the bid is that of any member of a partnership, limited liability company, limited liability partnership, or other legal entity listed in the most current business records on file with the secretary of state of this state.
B. The signature on the bid is that of an authorized representative as documented by the legal entity certifying the authority of the person.
C. The legal entity has filed in the appropriate records of the secretary of state of this state an affidavit, resolution, or other acknowledged or authentic document indicating the names of all parties authorized to submit bids for public contracts. Such document on file with the secretary of state shall remain in effect and shall be binding upon the principal until specifically rescinded and canceled from the records of the office.
13.03 All names shall be printed in ink above the signatures.
13.04 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.
13.05 A physical address for the Bidder shall be shown.
13.06 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the state where the Project is located. Bidder’s state contractor license number shall be shown on the Bid Form.
13.07 Bids submitted for this project must comply with bidding requirements of the State of Louisiana and the Bidding Documents. Of special emphasis are the following:
A. Bids equal to or in excess of the State of Louisiana's statutory limit ($50,000.00) requiring a licensed Contractor for bidding, must state on the outside of the sealed bid the Bidder's Louisiana contractor's license number.
B. Bids below the State of Louisiana $50,000 statutory limit requiring a Contractors license for bidding, must state on the outside of the sealed bid one of the following:
BID
D
OCUM
ENTS M
UST B
E O
BTAIN
ED F
ROM
R
RW
C T
O S
UBM
IT
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 7
1."This bid is below the State of Louisiana $50,000 statutory limit requiring a contractor’s license for bidding."
or
2. The Bidder’s Louisiana contractor’s license number.
C. Contractors submitting Bids shall comply with the provisions of the Louisiana Contractors Licensing Law R.S. 37:2150-2164.
13.08 Each Bid must be submitted in a sealed envelope, addressed to the Owner at the address shown on the Bid Form. Each sealed envelope containing a Bid must be plainly marked on the outside as a Bid for the applicable project or contract. If forwarded by mail or delivery service, the sealed envelope containing the Bid must be enclosed in another envelope addressed to Owner at the address shown in the Advertisement. It is incumbent upon the Bidder to verify with the mail or delivery service utilized that delivery will be made to the Owner by the time and date specified in the Advertisement for Bids.
13.09 Bidder shall make no additional stipulations on the Bid Form nor qualify his bid in any other manner. Bids subject to qualifications, stipulations or conditions imposed by the Bidder will be considered non-responsive.
13.10 Bidders may elect to submit bids electronically via the internet. Electronic bids may be submitted at www.bidnetdirect.com. Bidders shall obtain a digital signature certificate prior to submitting bids online. The bid security required by this solicitation shall accompany the bid.
13.11 While not required, it is suggested that an e-mail address and telephone number be shown on the bid envelope for communications regarding the bid.
ARTICLE 14 – BASIS OF BID
14.01 Unit Price
A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.
B. The “Unit Price Extension” for each unit price Bid item will be the product of the “Quantity” (which Engineer has set forth in the Bid Form) for the item and the corresponding “Unit Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Unit Price Extensions”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
Discrepancies between the base Bid total and the sum of the extended unit prices, the unit price shall govern. For the purpose of interpretation of the base Bid total and alternate Bids, when applicable, written words shall govern if a conflict exists between words and numerals.
D. In the comparison of alternate Bids, when applicable, alternates will be applied in the order listed in the Bid Form. However, the Owner reserves the right to accept alternates in any order which does not affect determination of the low bidder.
E. Bids shall not include taxes.
BID
D
OCUM
ENTS M
UST B
E O
BTAIN
ED F
ROM
R
RW
C T
O S
UBM
IT
B http://www.bidnetdirect.com/
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 8
F. Bidder acknowledges that estimated quantities are not guaranteed and are solely for the purpose of comparison of Bids, and final payment for all unit price bid items will be based on actual quantities, determined as provided in the Contract Documents.
ARTICLE 15 – SUBMITTAL OF BID
15.01 Using the electronic copy of the Bidding Documents furnished, the Bidder shall print a copy of the Bid Form, and the Bid Bond Form. The Bid Form is to be completed and submitted with the Bid security.
15.02 A Bid shall be received no later than the date and time prescribed and at the place indicated in the advertisement or invitation to bid and shall be enclosed in a plainly marked package with the Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted), the name of Bidder, address of Bidder, Louisiana Contractor’s License Number (if applicable) and shall be accompanied by the Bid security. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid shall be enclosed in a separate package plainly marked on the outside with the notation “BID ENCLOSED”. A mailed Bid shall be addressed to the Owner at the address indicated in the Advertisement. It is incumbent upon the Bidder to verify with the mail or delivery service utilized that delivery will be made to the Owner by the time and date specified in the Advertisement for Bids.
15.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.
ARTICLE 16 – MODIFICATION AND WITHDRAWAL OF BID
16.01 A Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.
16.02 Bids containing patently obvious, unintentional, and substantial mechanical, clerical, or mathematical errors, or errors of unintentional omission of a substantial quantity of work, labor, material, or services made directly in the compilation of the bid, may be withdrawn by the contractor if clear and convincing sworn, written evidence of such errors is furnished to the Owner within forty-eight hours of the bid opening excluding Saturdays, Sundays, and legal holidays. Such errors must be clearly shown by objective evidence drawn from inspection of the original work papers, documents, or materials used in the preparation of the bid sought to be withdrawn. If the Owner determines that the error is a patently obvious mechanical, clerical, or mathematical error, or unintentional omission of a substantial quantity of work, labor, material, or services, as opposed to a judgment error, and that the bid was submitted in good faith it shall accept the withdrawal and return the bid security to the contractor.
16.03 A contractor who attempts to withdraw a bid under the provisions of this Section shall not be allowed to resubmit a bid on the project. If the bid withdrawn is the lowest bid, the next lowest bid may be accepted. If all bids are rejected no withdrawal of the bid which would result in the award of the contract on another bid of the same bidder, his partner, or to a corporation or business venture owned by or in which he has an interest shall be permitted. No bidder who is permitted to withdraw a bid shall supply any material or labor to, or perform any subcontract work agreement for, any person to whom a contract or subcontract is awarded in the performance of the contract for which the withdrawn bid was submitted.
BID
D
OCUM
ENTS M
UST B
E O
BTAIN
ED F
ROM
R
RW
C T
O S
UBM
IT
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 9
ARTICLE 17 – OPENING OF BIDS
17.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly.
ARTICLE 18 – BIDS TO REMAIN SUBJECT TO ACCEPTANCE
18.01 All Bids will remain subject to acceptance for the period of time stated in the Advertisement.
Such time period may be extended in 30-day increments by mutual consent. Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT
19.01 Owner reserves the right to reject any or all Bids for just cause. Just cause for the purpose of this contract is defined, but is not limited to the following circumstances:
A. The Owner's unavailability of funds sufficient for the construction of the proposed work.
B. The failure of any bidder to submit a bid within an established threshold of the preconstruction estimates for the proposed work, as part of the bid specifications.
C. A substantial change by the Owner prior to the award in the scope or design of the proposed work.
D. A determination by the Owner not to build the proposed work within twelve months of the date of the opening of bids.
E. The disqualification by the Owner of all bidders.
19.02 Owner further reserves the right to disqualify any Bidder, either as a potential bidder or as the low bidder, whom it finds, after reasonable inquiry and evaluation, to not be responsible. Such disqualification will be made in accordance with LA R.S. 2212(X).
19.03 If Owner awards the contract for the Work, such award shall be to the responsible Bidder submitting the lowest responsive Bid.
19.04 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents
19.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.
19.06 Evaluation of Bids
A. In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.
B. If at the time the Contract is to be awarded, the lowest base Bid submitted by a responsible Bidder does not exceed the amount of funds then estimated by Owner as available to finance the Contract, the Contract will be awarded on the base Bid only. If such Bid exceeds such amount, the Owner may reject all Bids or may award the Contract on the base Bid by changing the plans as required and adjusting the Contract accordingly, in order not to exceed the available funds. Bidders are advised to carefully balance their Bids.
BID
D
OCUM
ENTS M
UST B
E O
BTAIN
ED F
ROM
R
RW
C T
O S
UBM
IT
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 10
C. If the Bid Form requests alternate prices, Owner may award the Contract on the base Bid combined with such alternates applied in the order in which they are listed in the Bid Form, as produces a net amount which is within the available funds; or may award the Contract on an alternate by changing the plans as required and adjusting the Contract accordingly, in order not to exceed the available funds; or Owner may reject all Bids. The Owner reserves the right to accept alternates in any order which does not affect determination of the low bidder.
ARTICLE 20 – BONDS AND INSURANCE
20.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance bonds, payment bonds and insurance. When the Successful Bidder delivers the Agreement (executed by Successful Bidder) to Owner, it shall be accompanied by required bonds and insurance documentation.
ARTICLE 21 – SIGNING OF AGREEMENT
21.01 When Owner issues a Notice of Award to the Successful Bidder, it shall be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, Successful Bidder shall execute and deliver the required number of counterparts of the Agreement (and any bonds and insurance documentation required to be delivered by the Contract Documents) to Owner. Within 10 days thereafter, Owner shall deliver one fully executed counterpart of the Agreement to Successful Bidder, together with copies of the Contract Documents.
ARTICLE 22 – RETAINAGE
22.01 Contract retainage shall be as follows in accordance with Louisiana state law:
A. Contracts with a value less than $500,000 shall be subject to retainage in an amount equal to ten percent (10%) of the value of completed work, including stored materials, until the work has been accepted as Substantially Complete and the lien free certificate has been provided.
B. Contracts with a value of $500,000 and over shall be subject to retainage in an amount equal to five percent (5%) of the value of completed work, including stored materials, until the work has been accepted as Substantially Complete and the lien free certificate has been provided.
ARTICLE 23 – PROJECT CLASSIFICATION
23.01 Public projects requiring classification under LA R.S. 37:2163 are classified by the Engineer in accordance with the classifications of the Louisiana Contractor's Licensing Board as listed on the project title sheet of the Drawings.
ARTICLE 24 – ADDITIONAL SUBMITTALS BY BIDDERS
24.01 The Bidding Forms section of the Contract Documents may include forms or documents not necessary to determine the lowest bidder. The requirements of LA R.S. 38:2212 shall govern. If not submitted with the bid, these forms and documents shall be completed and submitted by the low bidder within 10 days of the date of the bid opening. If the apparent low bidder does not submit the proper information or documentation as required by the bidding documents within the 10 day period, such bidder will be declared non-responsive and the Owner may
BID
D
OCUM
ENTS M
UST B
E O
BTAIN
ED F
ROM
R
RW
C T
O S
UBM
IT
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 11 award the bid to the next lowest bidder, and afford the next lowest bidder not less than 10 days from the date the apparent low bidder is declared non-responsive, to submit the proper information and documentation as required by the bidding documents, and may continue such process until the Owner either determines the low bidder or rejects all bids. Failure to submit completed forms within the required time period may result in the forfeiture of the bidder’s Bid Bond.
24.02 The following form(s) shall be completed and submitted by the low bidder within 10 days after the date that bids are opened:
A. Attestations
B. Non-Collusion Affidavit of Prime Bidder
C. Firearm Entity Nondiscrimination
OCUM
ENTS M
UST B
E O
BTAIN
ED F
ROM
R
RW
C T
O S
UBM
IT
LOUISIANA UNIFORM PUBLIC WORK BID FORM
TO: Red River Waterway Commission
5941 Highway 1 Bypass Natchitoches, LA 71458
(Owner to provide name and address of owner)
BID FOR: St. Maurice Recreation Area Comfort Station Project No. 26-01 Contract No. RRW-862
(Owner to provide name of project and other identifying information)
The undersigned bidder hereby declares and represents that she/he; a) has carefully examined and understands the Bidding Documents, b) has not received, relied on, or based his bid on any verbal instructions contrary to the Bidding Documents or any addenda, c) has personally inspected and is familiar with the project site, and hereby proposes to provide all labor, materials, tools, appliances and facilities as required to perform, in a workmanlike manner, all work and services for the construction and completion of the referenced project, all in strict accordance with the Bidding Documents prepared by:
Meyer, Meyer, LaCroix & Hixson, Inc. and dated: October 2026.
(Owner to provide name of entity preparing bidding documents.)
Bidders must acknowledge all addenda. The Bidder acknowledges receipt of the following ADDENDA: (Enter the number the
Designer has assigned to each of the addenda that the Bidder is acknowledging) __________________________________________.
TOTAL BASE BID: For all work required by the Bidding Documents (including any and all unit prices designated “Base Bid” * but not alternates) the sum of:
Dollars ($ )
ALTERNATES: For any and all work required by the Bidding Documents for Alternates including any and all unit prices designated as alternates in the unit price description.
Alternate No. 1 (Owner to provide description of alternate and state whether add or deduct) for the lump sum of:
N/A Dollars ($ N/A )
Alternate No. 2 (Owner to provide description of alternate and state whether add or deduct) for the lump sum of:
Alternate No. 3 (Owner to provide description of alternate and state whether add or deduct) for the lump sum of:
NAME OF BIDDER:
ADDRESS OF BIDDER:
LOUISIANA CONTRACTOR’S LICENSE NUMBER:
NAME OF AUTHORIZED SIGNATORY OF BIDDER:
TITLE OF AUTHORIZED SIGNATORY OF BIDDER:
SIGNATURE OF AUTHORIZED SIGNATORY OF BIDDER **:
DATE: _______________________
THE FOLLOWING ITEMS ARE TO BE INCLUDED WITH THE SUBMISSION OF THIS LOUISIANA
UNIFORM PUBLIC WORK BID FORM:
* The Unit Price Form shall be used if the contract includes unit prices. Otherwise, it is not required and need not be included with the form. The number of unit prices that may be included is not limited and additional sheets may be included if needed.
** A CORPORATE RESOLUTION OR WRITTEN EVIDENCE of the authority of the person signing the bid for the public work as prescribed by LA R.S. 38:2212(B)(5).
BID SECURITY in the form of a bid bond, certified check or cashier’s check as prescribed by LA RS 38:2218(A) is attached to and made a part of this bid.
BID
D
OCUM
ENTS M
UST B
E O
BTAIN
ED F
ROM
R
RW
C T
O S
UBM
IT
PENAL SUM FORM
EJCDC® C-430, Bid Bond (Penal Sum Form). Published 2013.
Prepared by the Engineers Joint Contract Documents Committee.
BID BOND
Any singular reference to Bidder, Surety, Owner or other party shall be considered plural where applicable.
BIDDER (Name and Address):
SURETY (Name, and Address of Principal Place of Business):
OWNER (Name and Address):
Bid Due Date:
Description (Project Name— Include Location):
BOND
Bond Number:
Date:
Penal sum $ (Words) (Figures) Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth below, do each cause this Bid Bond to be duly executed by an authorized officer, agent, or representative.
BIDDER SURETY
(Seal) (Seal) Bidder’s Name and Corporate Seal Surety’s Name and Corporate Seal
By: By:
Signature Signature (Attach Power of Attorney)
Print Name Print Name
Title Title
Attest: Attest:
Signature Signature
Title Title Note: Addresses are to be used for giving any required notice.
Provide execution by any additional parties, such as joint venturers, if necessary.
BID
D
OCUM
ENTS M
UST B
E O
BTAIN
ED F
ROM
R
RW
C T
O S
UBM
IT
PENAL SUM FORM
EJCDC® C-430, Bid Bond (Penal Sum Form). Published 2013.
Prepared by the Engineers Joint Contract Documents Committee.
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond. Payment of the penal sum is the extent of Bidder’s and Surety’s liability. Recovery of such penal sum under the terms of this Bond shall be Owner’s sole and exclusive remedy upon default of Bidder.
2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents.
3. This obligation shall be null and void if:
3.1 Owner accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents, or
3.2 All Bids are rejected by Owner, or
3.3 Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by Paragraph 5 hereof).
4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.
5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from the Bid due date without Surety’s written consent.
6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in Paragraph 4 above is received by Bidder and Surety and in no case later than one year after the Bid due date.
7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located.
8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier, or by United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.
9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent, or representative who executed this Bond on behalf of Surety to execute, seal, and deliver such Bond and bind the Surety thereby.
10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.
11. The term “Bid” as used herein includes a Bid, offer, or proposal as applicable.
BID
D
OCUM
ENTS M
UST B
E O
BTAIN
ED F
ROM
R
RW
C T
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .