Summary of St. Mary's River Survey Schedule A
This is a Statement of Work for Request for Proposal No. 270000000342 issued by the Michigan Department of Natural Resources, Fisheries Division, for the establishment of a one-year purchase order for seasonal aerial surveys of the St. Mary's River in both U.S. and Canadian waters. The contract requires aerial boat, shore, and pier angler counts conducted over five designated survey sites (Sweets Point to Neebish Island Ferry, Lake George to Green Point, Neebish Island Ferry to the Rapids, Drummond Island, and St. Joseph Channel) during the open water fishing season from May through October. An estimated 100 to 110 flights are anticipated, scheduled at a rate of four flights per week (two weekdays and two weekend days). Flights will be conducted on a pre-arranged random schedule generated by the State, with take-off times and direction predetermined to eliminate survey bias. The contractor must provide a single-engine, high or low-wing monoplane with current FAA certifications, inspections, and registration, along with a pilot meeting minimum experience requirements including 500 hours of pilot-in-command time and applicable medical and commercial pilot certifications.
Pricing is established as a fixed per-flight-hour rate, with all associated costs including fuel, aircraft maintenance, travel to and from the airport, reporting, and office expenses incorporated into the hourly bid. The pricing period is firm for 365 days from the effective date, with adjustments possible only through mutual agreement supported by documented evidence of cost changes. Payment will be made via electronic funds transfer within 45 days of invoice receipt. The contractor is responsible for maintaining current documentation of all pilot certifications, medical certificates, aircraft inspections, and insurance certificates naming the State of Michigan as additional insured. Liquidated damages of $500 per calendar day apply for failure to complete scheduled flights without authorization, and an additional $500 per individual per day may be assessed for unauthorized removal of key personnel or unapproved replacements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Vendor Questions Worksheet St, Mary's.docx | DOCX document | |
| St Mary's Schedule F - Federal Provisions Addendum (1).docx | DOCX document | |
| St. Mary's Confidential Treatment Form.docx | DOCX document | |
| Proposal Instructions St. Mary's.docx | DOCX document | |
| St. Mary's Standard Contract Terms.docx | DOCX document | |
| St. Mary's aerial survey Schedule B.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule A – Statement of Work Department of Natural Resources - Request for Proposal No. 270000000342 Fisheries Division Aerial Survey St. Mary’s River This schedule identifies the anticipated requirements of any Contract resulting from this RFP. The term “Contractor” in this document refers to a bidder responding to this RFP, as well as the Contractor who is awarded the contract. The term “bidder” is used to identify where specific responses to the RFP are required. Yellow fields are also used to identify areas where a bidder response is required.
The Contractor must respond to each requirement or question and explain how it will fulfill each requirement. Attach any supplemental information and reference it appropriately within your response.
Background The Michigan Department of Natural Resources needs to determine fishing efforts as a component of measuring recreational harvest from State fisheries. In situations where fishers access resources from areas other than public ramps and marinas, or where it is difficult to identify fishing vessels from land, the most reliable method for determining effort is an aerial survey.
Without contracts for aerial recreational angler survey services, estimates of fishing pressure and harvest would not be made for some of the state’s most important fisheries. As a result, Fisheries Division personnel would be unable to measure the success or effectiveness of management efforts in these waters. Additionally, Fisheries Division would not fulfill interagency/international agreements (legal mandate) to measure sport harvest in Michigan waters, nor would we be able to fulfill requirements to measure angler harvest in 2020 Great Lakes Fishing Decree waters of Lakes Michigan, Huron and Superior. Finally, Sport Fish Restoration funds could not be earned if aerial counts were not completed.
Scope This Request for Proposal is to establish a one-year purchase order for seasonal aerial surveys for the St. Mary’s River, both US and Canadian waters.
Contract Requirements Contract activities will be performed in the following area. The Contractor must submit a price proposal only for Survey Area(s) Contractor is willing/able to service.
The survey area is the St. Mary’s River (US and Canadian waters). Service will be provided as scheduled, with a maximum of 110 flights being expected.
Conduct aerial boat, shore, and pier angler counts over the St. Mary’s River (see site descriptions below) based on a pre-arranged random schedule during the open water fishing season (May-October). It is estimated there will be a total of 100 – 110 flights, but more could be possible.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Site Descriptions The Department of Natural Resources reserves the right to add, change or drop sites as required for the following sites to meet the survey design:
Site 207: Sweets Point to Neebish Island Ferry.
Site 208: Lake George to Green Point, include Little Lake George, and Sugar Island Area.
Site 209 Neebish Island Ferry to the Rapids in Sault Ste. Marie, including Lake Nicolet.
Site 210: Drummond Island (Chippewa Point).
Site 405: St. Joseph Channel.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Survey Requirements Pilot will fly the scheduled area and count all fishing boats in the Michigan and Canadian waters of each grid/site surveyed.
Conduct aerial boats and angler counts within the indicated survey area(s), based on a pre-arranged random schedule during open water fishing seasons. Flights will be scheduled 4 days per week – consisting of two weekdays and two weekend days per week. The Contractor will be required to provide all such services as scheduled by the State of Michigan, provided safe flying conditions exist. The contractor will receive a pre-arranged schedule that is generated randomly, as well as maps and instructions. This schedule will cover the entire season. The schedule gives the Contractor take-off times and starting direction. The Contractor will not determine when to fly or what direction to fly over the survey site. The State wishes to mix up surveys, north to south one day and south to north another day. This is to eliminate any bias from the pilot entering the survey design.
Pilot will fly the scheduled area and count all fishing boats and any shore and pier anglers along the way (if specified in site instructions). The survey is to be an actual physical count of the specified entities. Estimates are not acceptable. The Contractor will fly the survey sites in a pattern sufficient to count all persons and boats engaged in fishing on that day. Experience has indicated that this will usually be accomplished with one (1) pass over the survey site. However, there may be days that necessitate a second pass to obtain an accurate total count. Experience has also demonstrated that observers have not been required to complete the task, however they are not prohibited provided the contractor has identified them to the State as an observer. Each day the pilot will determine what a safe altitude is to conduct the survey based on current conditions in order to be able to accurately count fishing boats and shore and pier anglers. All data shall be recorded following instructions and using data forms provided by the contract Administrator or their designee.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Aircraft Requirements Airplane – single engine – high or low wing monoplane, 4 seat type (other type of aircraft may be used infrequently for emergency replacement when authorized by State prior to the mission being flown). At least one aircraft as described in this document is required and shall be made available within a Detection Area. All aircraft must meet the approval of DNR Program Manager or designee.
Aircraft must possess the following:
1. Current 100-hour inspection or progressive maintenance inspection
2. Current annual inspection
3. Aircraft registration
4. Aircraft airworthiness certificate
5. Aircraft Condition
a. Aircraft shall be properly licensed under regulations of the Federal Aviation Administration (FAA)
b. Aircraft shall be clean inside and outside and shall fully comply with FAA directives and specifications and to any pertinent laws and regulations of the State.
Contractor shall be responsible for furnishing all fuel, oil and normal operating supplies required for the aircraft, as well as servicing and repairing of aircraft.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Provide manufacturer and model of all aircraft to be used while under contract
Pilot Requirements All pilots must meet the approval of DNR Program Manager or designee. Contract pilots must be currently certified and capable of piloting aircraft for the types of mission to be flown, whether for airplane or helicopter. In addition to the general qualifications and the minimum flight experience requirements, contract pilots may be required to demonstrate their flight proficiency on an actual “flight test”, at contractor’s expense if deemed necessary by the DNR Program Manager. Aircraft used for such flight tests will be equipped with dual controls.
Minimum flight experience:
| FIXED WING |
| HOURS OF FLYING TIME |
| Pilot in command (PIC) |
| 500 |
| In each class of single-engine airplane to be flown |
| 100 |
| During preceding 12 months |
| 100 |
| Extended cross-country |
| 100 |
| Night flying |
| 50 |
| Operations in typical terrain and landing facilities, as applicable |
| 200 |
| In class to be flown, preceding 30 days |
| 5 |
| Related type of flying |
| 50 |
| ROTARY WING |
| HOURS OF FLYING TIME |
| Total flying time of all aircraft, including fixed wing |
| 1000 |
| HELICOPTER |
| HOURS OF FLYING TIME |
| Total flying time |
| 500 |
| Night flying |
| 10 |
| Typical terrain |
| 50 |
| In weight class to be flown (light, medium, or heavy) |
| 100 |
| Make and mode, preceding 60 days |
| 10 |
1. Pilot must have a current, valid commercial pilot certificate with appropriate aircraft ratings as defined in Federal Air Regulations, Part 61.
2. Pilot must have a current Class II (minimum) FAA medical Certificate and current Flight Review, as specified in Federal Air Regulations, Part 61.
3. Pilot shall not permit any passenger to ride in the aircraft or any cargo to be loaded therein unless preauthorized by the DNR Program Manager.
4. Pilot is responsible for the safety of the aircraft, its occupants and cargo. Pilot will comply with the directions of the State only when, in his/her judgement, such compliance will not be a violation of Federal Aviation Regulations.
5. Pilot shall comply with DNR Flight Duty Limitations along with all FAA and State laws and regulations.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Provide the name and qualifications of all individual(s) who will serve as Pilots under the contract.
Additional Contractor Responsibilities The contractor shall provide sectional aeronautical charts or equivalent The contractor shall provide the State the documentation and/or proof of compliance of contract requirements and terms. It is the contractor’s sole responsibility to keep documents current throughout the contract term. The contractor has not more than ten (10) days prior to expiration of a document to send in the replacement to the DNR Program Manager. Failure to provide current documentation prior to expiration date may result in the contract being terminated
The Contractor must provide and keep current the following documents:
a. Medical certificate, 2nd class or higher
b. Drug screening test, if requested by DNR (provided at State expense)
c. Commercial pilot license
d. Flight review
e. Annual inspection, airframe
f. Annual inspection, engine
g. Aircraft registration
h. Aircraft airworthiness certificate
i. 100-hour inspection record
j. Insurance certificate(s) as required in Standard Contract Terms, Section 6 and listing the State of Michigan as additional insured, if applicable, and including waiver of subrogation, if applicable.
k. Aircraft insurance certificate, naming the State of Michigan as additional insured
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
State Responsibilities An observer will occasionally be furnished by the State to accompany the pilot on such flights as may be designated by the State.
The State will provide maps of flight areas The State will provide drug screening of pilot(s) if the DNR requires screening Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Meetings The contractor must contact DNR Program Manager a minimum of 24 hours after the contract is awarded to schedule a meeting to ensure that all technical provisions required under the contract are met and to review other administrative requirements (including billing, checking in and out of service, and documentation completion and submission requirements).
Other meetings will be scheduled as deemed necessary.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Reporting Requirements In order to protect life and health and to prevent damage in the performance of this service, the contractor will use due diligence in preventing accidents and will comply with all applicable provisions of Federal and State laws and regulations. The contractor will maintain a record of all cases of death, injury or disease arising out of, or in the course of, employment work under this contract. This record will be available upon the request of the State.
The contractor shall complete daily report forms (provided by DNR) after each flight to include date flown, Hobbs or tachometer start and end readings, daily flight hours, name of DNR staff who authorized service, and signature of Pilot. Daily reports are to be submitted, accompanied by the contractor’s invoice, at the end of each month to DNR Program Manager along with angler/boat count data collected. The DNR will specify how the data are to be submitted at the start of the contract year.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Price Term Pricing is firm for a 365-day period (“Pricing Period”). The first pricing period begins on the Effective Date.
This is a fixed per flight hour bid – the contractor will be paid bid price per hour of flight. Completing reports, office costs, travel to and from the airport, flight time to and from airport to survey site and all other charges related to this service must be accounted for in the per hour flight rate. Pricing is firm for a 365-day period (“pricing period”). The first pricing period begins on the effective date of the contract. Adjustments may be requested in writing by either party and will take effect no earlier than the next pricing period.
Adjustments will be based on changes in actual contractor costs. Any request must be supported by written evidence documenting the change in costs. The State may consider sources, such as the Consumer Price Index; Producer Price Index; other pricing indices as needed; economic and industry data; manufacturer or supplier letters noting the increase in pricing’ and any other data the State deems relevant. Following the presentation of supporting documentation, both parties will have 30 days to review the information and prepare a written response. If the review reveals no need for modifications, pricing will remain unchanged unless mutually agreed to by the parties. If the review reveals that changes are needed, both parties will negotiate such changes for no longer than 30 days unless extended by mutual agreement.
The contractor remains responsible for contract activities at the current price for all orders received before the mutual execution of a Change Notice indicating the start date of the new pricing period.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Authorizing Document The appropriate authorizing document for the Contract will be a Purchase Order.
Bidder Response
☐ I confirm the above requirement(s) and agree with no exception(s)
Ordering An oral request for service by the DNR Program Manager or authorized DNR staff constitutes an order under the contract; a written purchase order is not required. The contractor will be provided with a list of all DNR personnel authorized to issue orders for service.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Acceptance, Inspection and Testing The Program Manager or designee will be monitoring work during the entire process.
Only the Program Manager or designee is authorized to determine whether the Contract Activities are accepted.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Invoice Requirements All invoices submitted to the State must include: (a) date; (b) delivery order number; (c) quantity; (d) description of the Contract Activities; (e) unit price; (f) shipping cost (if any); (g) vendor-generated invoice number and (h) total price.
Payment terms are Net 45 days from receipt of invoice, unless quick payment discount is offered.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Payment Methods The State will make payment for Contract Activities by EFT.
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here
Liquidated Damages The Contractor agrees that the completion times for survey flights are essential conditions of the Request for Proposal. Should the Contractor fail to complete the flights on schedule without prior authorization, it is agreed that the sum of $500.00 will be deducted from the Delivery Order sum for each calendar day the flights are late. It is understood and agreed that this deduction is not a penalty, but represents liquidated damages suffered by the State Unit, and is so fixed on a per diem basis because of the extreme difficulty of ascertaining the time and full amount of damage the State Unit will sustain if the surveys are not completed as scheduled.
Scheduled flights that have been canceled due to adverse weather conditions or other unforeseen circumstances shall be reviewed with the Project Manager within 24 hours and arrangements made for rescheduling these flights. Failure to reschedule the canceled flights with the Project Manager within 24 hours may result in liquidated damages being assessed.
Additionally, unauthorized removal of the Project Manager or Pilot which will interfere with the timely and proper completion of the Contract, will likely cause loss and damage of the State. It would be impracticable and extremely difficult to assess the actual damage sustained by the State. Therefore, the State may assess liquidated damages against Contractor as specified below.
The State is entitled to collect $500.00 per individual(s) per day for the removal of the Project Manager without prior approval of the State.
The State is entitled to collect $500.00 per individual per day for an unapproved or untrained key personnel replacement (pilots).
Bidder Response
☐ I have reviewed the above requirement(s) and agree with no exceptions.
☐ I have reviewed the above requirement(s) and have noted any exceptions below.
Exceptions: List all exceptions here image1.png
File details come from the government source that posted it. Updated .