SSN SOW - B200 Fiber Install Project.docx

DOCX document 21 KB Posted

Attached to
Bldg 200 Fiber Installation Project
Solicitation number
N0003024Q4001
Issued by

About this file

This document is a Statement of Work (SOW) for a fiber installation project at the Strategic Systems Programs (SSP) Headquarters located in Building 200 on the Washington Navy Yard. The project involves providing classified 2-strand OM3 fiber optic cable with red jackets and duplex LC connector terminations to each desk in Suites 3900, 4500, and 4600, as well as Conference Rooms 13, 16, and 17. The cables will originate in a contractor-provided patch panel installed in a specified rack and terminate at work area outlets. All new horizontal classified cabling will terminate at patch panels located in the topmost positions of Rack 4. The designation for this cable is classified data and voice.

View the file

Other files

File Type Posted
SSN Fiber Description of Work_3900_4500_4600_FINAL.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIBER INSTALLATION PROJECT

SUITES 3900, 4500 & 4600

1.0 Summary

Strategic Systems Programs (SSP) Headquarters (SPHQ) is located in Building 200, a five-story administrative office building on the Washington Navy Yard (WNY) in Southeast Washington, DC. This contract is for fiber installation in suites 3900, 4500, and 4600.

2.0 Contract Line Item Numbers (CLINs)

2.1 IT Cabling Requirements for Suites 3900, 4500, and 4600, and Conference Rooms 13, 16 and 17 Provide classified 2-strand OM3 fiber optic cable with red jacket and duplex LC connector terminations to each desk in Suites 3900, 4500, and 4600, and conference rooms 13, 16 and 17. Cable terminated connectors each connect to like-type duplex-LC modular adapters within patch panels and work area faceplates, fitted with matching color-coded insert (Commscope P/N: 2111408-7 or similar). These cables shall originate in a contractor provided patch panel to be installed in a specified rack in an identified TC and terminate at work area outlets in all Suites and identified conference rooms. All new horizontal classified cabling will terminate at patch panels located in the topmost positions of Rack 4. Designation for this cable shall be classified data and voice.

2.1.1 General

Provide all personnel, tools, parts, transportation, equipment, and incidentals required to perform all work under this contract. New equipment, devices, hardware, material and finishes, etc. shall meet SPHQ standard unless otherwise noted.

Remove existing equipment and materials necessary to accept the new work. Disconnect and remove all equipment and materials not used - do not abandon in place.

To allow SSP time to coordinate impacts, any outage affecting mechanical, electrical, telecommunications and/or security systems must be coordinated with, and approved by, the COR a minimum of two (2) weeks in advance of the outage.