This Performance Work Statement (PWS) details a specialized contract for ceramic coating services for four (4) retractable bow plane lock-in lock-out (LILO) piston rods for the US Submarine program. The work involves cleaning, blasting, and recoating/sealing or machining and applying new ceramic coating to piston rods, following specific NAVSEA procedures (SWPY 4260A and NAVY047, Rev. B) and drawing specifications. The project is for the Puget Sound Naval Shipyard, with work to be performed at the contractor's facility, involving government delivery and return of components.
Key contract details include a performance period from 11/24/25 to 01/31/26, with a sole-source intent to award to A & A Coating's, Inc. Contractors must submit facility qualifications per MIL-STD 1687A and spray operator certifications. The government point of contact is Robert Reuter, and interested parties must submit capability documentation by 11/21/2025 at 12:00 PM PST to Christopher Cooper. Contractors must be registered in the System for Award Management (SAM) and provide detailed technical background demonstrating their ability to meet the specialized technical requirements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS) CTB Retractable Bow Plane LILO Piston Rods
TABLE OF CONTENTS
| 1 | Background | 3 |
| 2 | General Requirements | 3 |
| 3 | Performance Requirements | 4 |
| 4 | Special Requirements | 5 |
| 5 | Government Furnished Materials | 6 |
| 6 | Applicable Directives | 6 |
| 7 | Quality | 7 |
| 8 | Deliverables | 7 |
ATTACHMENTS
A - Quality Assurance Surveillance Plan (QASP)
Performance Work Statement (PWS) Ventilation Cleaning 1 BACKGROUND – US Submarine (SSN) requires removal and replacement and/or new application of ceramic coating installed on wearing area of piston rod. Work performed requires specialized skilled personnel having knowledge, expertise and specialized equipment to accomplish work.
1.1 Scope – Four (4) retractable bow plane lock-in lock-out piston rods require cleaning, blasting, and recoating/sealing AND/OR machining and new application of ceramic coating as detailed in procedure SWPY 4260A, dated 17 April 2014 to dimensions of NAVSEA drawing 566-6408394, Rev. B Piece 2. All work shall follow NAVSEA approved procedure NAVY047, Rev. B, issued March 5, 2014.
2 GENERAL REQUIREMENTS
2.1 Work to be accomplish at contractor facility with Government Delivery to Contractor and Contractor return to Government upon completion of work. Government will ship rods to vendor facility.
2.2 Certification of facilities per MIL-STD 1687A per approved NAVSEA procedure NAVY047, Rev. B to be submitted with proposal
2.3 Certification of coating application employees to SWPY 0369A per SWPY 4260A and NAVSEA approved procedure NAVY047, Rev. B to be submitted with proposal.
| 2.4 | Period of Performance: 11/24/25 - 01/31/26 |
| 2.5 | Planning, supervising, or performing nuclear work is not authorized without the express approval of Puget Sound Naval Shipyard Code 300N, Code 1200N, Code 2300, and Code 105. |
| 2.6 | Coordinate delivery and shipment of Contractor equipment and supplies with the Contracting Officer’s Representative (COR): Robert Reuter |
Government Delivery and Shipping Address:
Puget Sound Naval Shipyard 1400 Farragut AVE., BLDG.514 Bremerton, WA 98314 ATTN: Douglas Stanley/ Robert Reuter
| 2.7 | Government Point of Contact: Robert Reuter, Robert.t.reuter.civ@us.navy.mil |
| 3 | PERFORMANCE REQUIREMENTS . |
3.1 Submit facility qualifications per MIL-STD 1687A with Proposal
3.2 Submit spray operator(s) qualifications on bond and top coat applications SWPY 0369A per SWPY 4260A with proposal.
3.3 Accomplish the removal of the existing coating and re-installation of new coating AND/OR accomplish application of new coating on four (4) piston rods per the requirements of procedure SWPY 0369A per SWPY 4260A, dated 17 April 2014 and NAVSEA drawing 566-6408394, Rev. B and NAVSEA approved procedure NAVY047, Rev. B, issued March 5, 2014.
3.4 Submit one legible copy, in approved transferrable media, of a Condition Found Report (CFR) for any conditions not per the requirements above to the Contracting Officer’s Representative (COR) within 24 hours of discovery of the condition.
4 SPECIAL REQUIREMENTS
4.1 No Special Requirements
5 GOVERNMENT SUPPLIED SERVICES
5.1 Four (4) retractable bow Plane LILO piston Valves
6 APPLICABLE DIRECTIVES
6.1 MIL-STD 1687A
6.2 SWPY 0369A
6.3 SWPY 4260A
6.4 NAVSEA dwg. 566-6408394, Rev. B
6.5 NAVSEA Approved Procedure NAVY047, REV. B, Issued March 5th, 2014
| 7 | QUALITY - The Government will utilize a Quality Assurance Surveillance Plan (QASP) as a tool to verify that the contractor is performing all services and delivery/installation of replacement parts required by the above requirements in a timely, accurate and complete fashion. |
| 8 | DELIVERABLES - Provide deliverables as described in Performance Work Statement (PWS) specified by the government format and delivery schedule outlined in Contract Data Requirements List (CDRLs). |
| Number |
| Name |
| Frequency |
| Quantity |
| A001 |
| Completion Report |
| 24 hours of Discovery |
| One each |