This memorandum provides justification for a sole source acquisition under the simplified acquisition threshold for the USNS Harvey Milk. The Navy requires replacement UPS batteries from Always On UPS Systems Canada Inc. by October 2024 for critical ship equipment on the USNS Harvey Milk and TAO 205 class vessels. As the standard supplier for these vessels and sole manufacturer of compatible batteries, only Always On can meet the requirements for form, fit and function to ensure continuity of power supply for machinery control systems. The anticipated value of this sole source procurement is not specified.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q0171 HARVEY MILK UPS BATTERY REPLACEMENT.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 Ver 2.0 (01 July 2018)
Date: 21 January 2024
MEMORANDUM
Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER
THE SIMPLIFIED ACQUISITION THRESHOLD
Ref: (a) PR Number(s): __N32205XXXXXXX___________________________
I. BACKGROUND:
1. In considering the references, FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contacting Officers may solicit from one source if the Contracting Officer determines that, under the circumstances of the contract action, only one source is reasonably available (e.g., urgency, exclusive licensing, brand-name, or industrial mobilization).
2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition because only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.
II. DESCRIPTION OF ITEM OR SERVICE:
1. Provide a description of the item or service required, to include
a) the name of the required source or brand name
ALWAYS ON UPS SYSTEMS CANADA INC.
b) the required delivery date/period of performance and
RDD 1 October 2024
c) its intended use.
MATERIAL FOR USNS HARVEY MILK PSA – WI 306 – UPS BATTERY REPLACEMENT
2. List the source(s) or known vendor(s) who are able to provide the above described item or service.
ALWAYS ON UPS SYSTEMS CANADA INC. – DEBORAH BANNISTER –
DEBORAH.BANNISTER@ALWAYSON.COM – 877-259-2976 (234)
III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS BASED
ON THE FOLLOWING (select all that apply):
A. ____ Only one responsible source (select all that apply):
1. _____ RESTRICTIVE RIGHTS: the source has established proprietary rights, limited rights in data, patent rights, copyrights, or secret processes in the item or service.
a. Explain what is subject to the restrictive rights.
b. If drawings are included, who is identified as “owning” the drawings.
2 Ver 2.0 (01 July 2018)
2. __ ___ EXCLUSIVE LICENSING AGREEMENTS: The item or service is only available from the Original Equipment Manufacturer (OEM), or there is ONLY ONE authorized distributor or technical representative for the OEM.
a. Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.
b. Identify the distributor / authorized technical representative for the item or service.
Provide evidence of the exclusive licensing agreement as an attachment to this document.
(NOTE: If there is more than one distributor / authorized technical representative, then use Part B – Brand Name.)
3. __X___ OTHER REASON:
a. __ X __ CRITICAL SHIP EQUIPMENT: The required item is critical ship equipment, the failure of which poses a hazard to the ship, the crew or the environment.
i. SMS Procedure Number: ___10.6-002-01-AO________________________
b. __X___ STANDARDIZATION / BRAND NAME: Per MSCs standardization initiative, only the specified make/model of the equipment/parts will satisfy the Government’s needs for additional units or replacement items.
i. Identify Make / Model Number(s): _ ALWAYS ON UPS SYSTEMS - UPS
MODEL NUMBERS: GES-103NX31 10KVA, GES-153NX33 15KVA, GES-153NX31 15KVA,
GES-203NX31 20KVA
ii. Identify other vessels with this Make / Model:
NEW SHIP CONSTRUCTION TAO 205 CLASS
c. __X___ FORM, FIT, AND FUNCTION: Item is direct replacement parts / components for existing equipment and must be compatible in terms of form, fit, and function with existing equipment / configurations.
i. Identify Make / Model of existing equipment:
ALWAYS ON UPS / UPS MODEL NUMBERS: GES-103NX31 10KVA, GES-
153NX33 15KVA, GES-153NX31 15KVA, GES-203NX31 20KVA
ii. Describe how the equipment must be compatible with the existing configuration.
THE MATERIAL BEING PROCURED IS DESIGNED AND MANUFACTURED
WITH THE SAME SIZE, LENGTHS, DIMENSIONS, MATERIAL MAKE-UP, RATING AND
OPERATIONAL PARAMETERS OF THE CURRENTLY INSTALLED BATTERIES, FANS
AND CAPACITORS AS REQUIRED BY THE OEM FOR THIS CRITICAL PIECE OF
EQUIPMENT. THE MATERIAL BEING PROCURED IS NECESSARY TO ENSURE THE IN
3 Ver 2.0 (01 July 2018)
THE EVENT OF A POWER FAILURE, PROVIDES POWER BACK UP AND PROTECTS
EQUIPMENT FROM DAMAGE FOR CRITICAL SYSTEMS SUCH AS MACHINERY
CONTROL SYSTEM.
d. __ OTHER:
4. ___ UNUSUAL AND COMPELLING URGENCY: The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits. Urgent requirements are supplies or services that will result in work stoppage, or are mission critical and the routine processing time would injure the Government. The determination that the procurement for the above is an urgent and compelling requirement is based on the following:
a. Date on which the requirement was identified: ___________________
b. Required delivery date / Period of Performance: ___________________________
c. If the difference between a. and b. is more than one week, explain the delay in submitting the requirement.
d. Estimated production lead time: ____________
e. Explanation of why delivery / commencement of services by the date required is needed: (explain the impact to the mission, any special circumstances or conditions, etc.)
f. CASREP Number: _____________
IV. ANTICIPATED DOLLAR VALUE OF PROCUREMENT:
V. CERTIFICATIONS AND APPROVALS:
Technical / Requirement Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.