SSJ - Signed.pdf
PDF 168 KB Posted
- Attached to
- 5G Core DITTR System
- Solicitation number
- FA2823-24-Q-A036
About this file
This document is a Sole Source (Including Brand Name) Justification for the acquisition of equipment to upgrade and expand the existing Deployable Integrated Telecommunications Test Range (DITTR) System.
The key details are: The requirement is for 5G SA Cell Network equipment, 5G handsets, and related components from TLC Solutions, Inc., the sole proprietor of the current DITTR system. The total estimated cost is $380,605. TLC Solutions, Inc. is the only contractor that can provide the equipment compatible with the existing DITTR system. The government conducted market research but determined no other sources could meet the requirement. Delivery is 16-20 weeks after order. The acquisition is authorized under simplified acquisition procedures.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NOCA v1.pdf | ||
| TRD.pdf | ||
| NOCA.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
April 2021 Page 1 of 4
NOTE: If a Justification was approved for the preceding acquisition, a copy of the approved Justification for the predecessor action must be included in the staff package for approval of the instant Justification. This applies to Justification staff packages that are submitted for review and approval at a level above the contracting officer. The predecessor Justification will be used as a reference document by the approving official.
Is this a new or amended J&A Document? New Amended ( Prior to Award Only! )
Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan? Yes No
Funding level for this acquisition: >SAT and < $750K > $750K and < $15M
Contracting Activity: AFTC/PZIOA Eglin AFB, FL
Purchase Request / Local ID Number: F1T0DC4158A101
Program / Project (and PE, if applicable): Deployable Integrated Telecommunications Test Range (DITTR) System
Program Type (PEO or Other Contracting): Other Contracting
Authority: AFFARS 5313.501 - 10 U.S.C. 2302b, Implementation of Simplified Acquisition Procedures (41 U.S.C. 1901)
AFFARS 5313.501 - 10 U.S.C. 2304a, Special Emergency Procurement Authority (41 U.S.C. 1903)
Estimated Contract Cost (including options): $380,605.00 Justification Type: Class Individual
COORDINATION ( AFFARS 5306.304(a)) Sign and Save Procedure
** The text in the signature blocks below is editable, including the title.
** To remove a row, click the "X" next to the signature block. CAUTION: Once removed, it can only be restored by downloading the BLANK FORM again.
Date
23 May 2024
Project Lead / Program Mgr / Requiring Activity George McFarland
47 CTS/DOD, (210) 671-8554
Signature
X
Date
02 Aug 2024
Contracting Officer
JOHN M. RIFFE
AFTC/PZIOA-B, 850-872-0334
Signature
X
APPROVAL (AFFARS 5306.304(a) )
Date Signature
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
April 2021 Page 2 of 4
I. Contracting Activity.
AFTC/PZIOA Eglin AFB, FL
II. Nature and/or description of the action being processed.
Acquisition upgrade/expansion of existing Deployable Integrated Telecommunications Test Range (DITTR) System
III. Description of supplies/services required to meet agency needs.
• 5G SA Cell Network o Each 1: Part Number: 5G SA Core-100
§ CORE Network solution that provides the following components:
§ 5G Core to support 5G NSA and 5G SA including:
§ --Infinite Software License for up to 100 attached subscribers on Dell Server § --Unlimited Number of Attached 5G Base Stations (No BUC Power Supply) o Each 1: Part Number: Falcon-RX/812 § 5G Timing Aware & PTP Grandmaster switch (supports up to 4 radio heads) o Each 1: Part Number: gNodeB-2-HP-n78n79 § 5G Base Station Subsystem (BSS) that provides the following components:
§ 5G gNodeB (for existing Tower Sites) supporting Sub 6GHz Frequency 1x Band n78 & 1x n79 § --Outdoor Radio Head will support 4x4 MIMO with output of 5W at each antenna port § --Two (2) Radio Heads (for 2 sectors) are included § --Antennas are included for attachment to Radio Heads o Each 1: Part Number: 2G/3G CORE Network § GSM/UMTS CORE Network solution that provides the following components:
§ --Infinite Software License for up to 100 attached subscribers on 1RU Dell Server § --Licensed for 8 Attached GSM UMTS Base Stations & 1 UMTS Base Station § --Short Message Service Center (SMSC) § --GSM (2G) GSN to support data attachments § --UMTS (3G) GSN to support data attachments o Each 1: Part Number: 2G/3G MAP § 2G/3G MAP Interface for Private Network Roaming o Each 16: Part Number: Handset-5G § 5G Handsets and SIM cards o Each 1: Part Number: Remote Support § Remote Technical Phone Support (8x5 M-F). This Technical Support Plan covers a period of one year o Each 1: Part Number: Training
§ Operator/Technician Training up to 5 students (1 week on Site at TLC's Facility in Florida).
• Key Features
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
April 2021 Page 3 of 4 o Combined CU/DU Support o Configurable with up to three Remote Radio Heads (RRH) o RRH (FR1 sub 6 Hz range) SW 4x2 MIMO Configuration o High Speed throughput up to 1.6 Gbps o Local/Centralized Management GUI
A. Include standard warranty B. TAA Compliant C. Include Current User Manual D. New Products only E. FOB Destination Lackland AFB, TX F. Delivery: 16 to 20 weeks after Receipt of Order (ARO)
Government requirement is for form, fit and function Brand Name products to support legacy, current and future test arenas. Products required must be 100% compatible to on hand products and support the baseline core mission test configuration. The products are additional components to existing brand product line to complete a test bed arena.
IV. Statutory authority permitting other than full and open competition.
AFFARS 5313.501 - 10 U.S.C. 2302b, Implementation of Simplified Acquisition Procedures (41 U.S.C. 1901)
V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).
TLC Solutions, Inc. is the sole proprietor of the current Deployable Integrated Telecommunications Test Range (DITTR) system already owned & operated by the government, and the requested equipment assets listed in Section B. The assets procured will be paired with our DITTR system to upgrade & expand the mobile network capabilities in exercises and operational rehearsals to build a networked telephony system to replicate real-world environments. No other company can provide the equipment for the upgrade and expandability that is necessary for this requirement due to the compatibility/integration needed to the current system.
VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.
Vendors through both SAM.gov and NASA SEWP were contacted to provide capability statements in regard to this requirement.
VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.
The Contracting Officer shall determine fair and reasonable IAW FAR 13.106-1(a)(2)(i).
VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.
TLC is the OEM and existing contractor for our current DITTR system that offers the upgraded equipment capability requested. They provide stand-alone base stations for integration with 3rd-party core network software or extending existing mobile network operator networks. Through market research and talking with the several vendors on both SAM.gov and NASA SEWP similar products, not same brand, were able to be procured. However due to the nature of the
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
April 2021 Page 4 of 4 requirement being an upgrade and expansion the need to be compatible with the existing system in place is required and only the current contractor has the rights to that equipment.
IX. Any other facts supporting the use of Other Than Full and Open Competition.
TLC Solutions is the only company who can provide the same equipment that is in place that is required to be used for the upgrade and expansion, due to TLC being the OEM for the products.
X. List of any sources that expressed, in writing, an interest in the acquisition.
TLC Solutions Inc.
XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.
N/A
XII. Certification by the Contracting Officer.
As evidenced by my signature above, I have determined this document to be both accurate and complete to the best of my knowledge and belief.
XIII. Certification by the technical/requirements personnel.
As evidenced by my (our) signature(s) above, I (we) certify that any supporting data contained herein, which is my (our) responsibility, is both accurate and complete.
Remove the Guidance pages below.
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items April 2021 Page of International Agreement Competitive Restrictions (IACR) March 2018 Page of NOTE: If a Justification was approved for the preceding acquisition, a copy of the approved Justification for the predecessor action must be included in the staff package for approval of the instant Justification. This applies to Justification staff packages that are submitted for review and approval at a level above the contracting officer. The predecessor Justification will be used as a reference document by the approving official.
Is this a new or amended J&A Document?
Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan?
Funding level for this acquisition:
Authority:
Justification Type:
COORDINATION ( AFFARS 5306.304(a)) ** The text in the signature blocks below is editable, including the title.
** To remove a row, click the "X" next to the signature block. CAUTION: Once removed, it can only be restored by downloading the BLANK FORM again.
APPROVAL (AFFARS 5306.304(a)) NOTE: A signature block will appear here based on the funding level selected above.
(See "Specific Guidance for Completing this Template" below.)
I. Contracting Activity.
II. Nature and/or description of the action being processed.
III. Description of supplies/services required to meet agency needs.
IV. Statutory authority permitting other than full and open competition.
V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).
VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.
VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.
VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.
IX. Any other facts supporting the use of Other Than Full and Open Competition.
X. List of any sources that expressed, in writing, an interest in the acquisition.
XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.
XII. Certification by the Contracting Officer.
XIII. Certification by the technical/requirements personnel.
Specific Guidance for Completing this Template
I. Contracting Activity. (FAR 6.303-2(b)(1))
Fully identify the contracting agency and organizational activity responsible for the proposed contracting action.
II. Nature and/or description of the action being processed. (FAR 6.303-2(b)(2))
State whether the action will be awarded as a new contract or by modification to an existing contract (identify contract number) and identify the type contract planned (FAR 12.207 and DFARS 212.207).
An individual Justification cannot be used to support more than one contract irrespective of the quantities or the dollar value stated therein. If a proposed contract will contain unpriced options (including NTE prices), those options must be supported by a separate Justification prior to option exercise or the Justification supporting the basic contract must be a Class Justification. For Class Justification situations (covers more than one contract) where the number of contracts in the class can be identified: (1) Provide a brief general description of actions; (2) identify the supplies and services that are being acquired; and (3) for each contract in the class identify the contractor, estimated value, type of contract and rationale for contract length, and estimated award date. Where the same information applies to more than one contract within the class, it need only be stated one time.
III. Description of the supplies/services required to meet agency needs. (FAR 6.303-2(b)(3))
Specifically describe the supplies and/or services to be acquired, the total estimated value of the acquisition - including options (provide cost estimate by year and, for class Justifications, by contract action), and the estimated delivery dates/periods of performance If commodities are being procured, provide quantities. All contract line items (CLIN) -- e.g., technical data, support equipment, support services, etc. -- should be listed. If all of the ancillary requirements associated with a particular item are not specifically described in the Justifications, those ancillary requirements cannot be included in the resulting contract and would require a second Justification. Also, state the type of appropriation (e.g., 3010, 3400) that will be used to fund each requirement listed.
If approval for more than one fiscal year requirement is needed, give the rationale for this request. Generally, the scope of these actions is limited to current requirements only, so that actions may be taken to facilitate competition for out-year requirements.
In some cases, there are no feasible actions that could develop future competition, and it is reasonable to seek approval for more than one fiscal year's requirements.
For ID/IQ or requirements contracts, use the maximum dollar value of the total estimated orders as the estimated Justification dollar value.
IV. Statutory authority permitting other than full and open competition. (FAR 6.303-2(b)(4)) V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority). (FAR 6.303-2(b)(5))
Provide, in narrative form, a detailed explanation supporting and clearly relating to the conditions described by the FAR for using the particular authority cited. This section is normally the most detailed part of the justification as the essence of the justification is presented here. For acquisitions that include both supplies and services, separately justify the use of the authority for the services and supplies.
Contracting without providing for full and open competition shall not be justified on the basis of lack of advance planning by the requiring activity or concerns related to the amount of funds available (e.g., funds will expire) (10 U.S.C. 2304(f)(4)).
VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.
(FAR 6.303-2(b)(6))
Describe all efforts taken (or to be to be taken) to ensure that offers are solicited from as many potential sources as practicable under the circumstances. Although Market Research is covered in Section VIII, the information in Section VI should correlate with the Market Research described in Section VI. The following issues should be addressed in this paragraph:
Sources Sought Synopsis (used as part of market research). If a sources sought synopsis was issued, state the date the synopsis was issued and a brief description of its content. If any responses were received, describe in detail the results of the screening process and the rationale for determining the unacceptability of any synopsis respondents. Reference FAR 13.105, Synopsis and Posting Requirements.
Other Actions. In this paragraph, discuss any other actions taken or planned to facilitate competition for this acquisition. The discussion should include actions tried or considered even if the actions were unsuccessful. If the efforts were unsuccessful, so state and describe why.
Qualifying Country Sources. If qualifying country sources have expressed interest, but are to be excluded, provide supporting rationale.
VII. Determination by the Contracting Officer that the anticipated cost to the government will be fair and reasonable. (FAR 6.303-2(b)(7))
Include a statement by the contracting officer that the anticipated cost will be considered fair and reasonable and provide the basis for this determination. The steps that will be taken to ensure the final contract price will be fair and reasonable are also described here. Describe the extent of cost or price analysis anticipated including the requirements for certified cost or pricing data, technical evaluations, and audits.
VIII. Description of the market research conducted and the results, or explain why market research was not conducted. (FAR 6.303-2(b)(8))
Generally, some form of market research should be conducted. Discuss any market research conducted pursuant to FAR Part 10 and describe results of that research. Market research is any effort undertaken to determine if sources capable of satisfying the agency's requirements exist and to determine if commercial items or non-developmental items are either available or can be modified so that they will satisfy the agency's needs. Market research should be focused not only on identifying alternate sources, but also on alternate equipment or substitutes that might fulfill the Government needs with only minor modification. Regardless of the approach used, the results should provide a high level of confidence that no other qualified sources exist.
When other exceptions from the requirement to obtain full and open competition are relied upon, the market research might be limited to an examination of the acquisition history and experience with the marketplace under previous acquisitions for the same or similar items.
If no market research was conducted, so state and provide the rationale.
IX. Any other facts supporting the use of Other Than Full and Open Competition. (FAR 6.303-2(b)(9)(i))
Provide any other facts supporting the use of other than full and open competition, including an explanation of why technical data packages, specifications, engineering descriptions, statements of work, statements of objectives, or purchase descriptions suitable for full and open competition have not been developed, are not being developed, are not being used, or are not available.
X. List of sources, if any, that expressed interest in the acquisition. (FAR 6.303-2(b)(10))
If a sources sought synopsis was done and all interested sources are included in Section VI, it is acceptable to state, “See Section VI above.”
XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required. (FAR 6.303-2(b)(11))
Describe any actions taken or to be taken to foster competition for future acquisitions of the supplies or services being acquired. Describe potential actions that could be taken to remove the barriers to competition that have been identified in the justification and include a milestone schedule, where available, for accomplishing these actions. For example, if a follow-on competitive acquisition is planned, so state and provide the planned award date, or state that the Government will attempt to acquire rights in technical data and computer software sufficient to compete follow-on acquisitions as a priced option in the contract action that is the subject of this Justification, or (if applicable) state how the Government intends to challenge nonconforming markings on technical data and computer software delivered to it under previous contracts so those markings can be removed in order that the technical data and computer software may be used in support of a follow-on competitive acquisition, or describe plans to qualify additional sources.
Address efforts to ensure competition for future spare parts and maintenance in support of systems or equipment covered by the justification, even when these acquisitions will be accomplished by other organizations. Include a discussion on available breakout data.
If no actions are planned, so state and provide reasons. If approval is sought for more than one year, explain why a sole source effort is required for the planned time duration.
For a non-competitive follow-on acquisition to a previous award for the same supply or service supported by a Justification citing the same authority, include a discussion of the actions planned to overcome barriers to competition established in the previous justification, the status of those actions, and the results of those actions. The approval authority shall determine whether the planned actions were completed. If the planned actions were not completed, the justification for the follow-on acquisition shall be approved by the approval authority one-level above the approval authority for the previous justification (see FAR 13.501(a)(2)). If the previous justification was approved by the Senior Procurement Executive (SPE), the approval remains at the SPE level.
[DFARS 213.501(a) and DFARS PGI 206.304(a)(S-70)(ii)] XII. Certification by the Contracting Officer. (FAR 6.303-2(b)(12))
As evidenced by his/her signature, the contracting officer has determined this document to be both accurate and complete to the best of his/her knowledge and belief.
XIII. Certification by the technical/requirements personnel. (FAR 6.303-2(c))
As evidenced by their signatures, the technical and/or requirements personnel have certified that any supporting data contained herein, which is their responsibility, is both accurate and complete.
Do You Need to "REDACT" Text?
This template is interactive and has special features. In its current state, it cannot be redacted. In order to redact any portion of this template, you must first convert it to a normal PDF file. Click here for instructions.
9.0.0.2.20120627.2.874785
| security_markings: |
| CurrentPage: |
| PageCount: |
| new: |
| amended-with-original: |
| Yes: |
| No: |
| range_under-700K: |
| range_700K-13.5M: |
| Contracting-Activity: AFTC/PZIOA Eglin AFB, FL |
| PR-ID-Number: F1T0DC4158A101 |
| Program-Project: Deployable Integrated Telecommunications Test Range (DITTR) System |
| Program-Type: Other Contracting |
| class: |
| individual: |
| Estimated_Cost: 380,605.00 |
| Sign_and_Save_1: |
| Date: 17 Apr 2024 |
| Date: 23 May 2024 |
| Date: 02 Aug 2024 |
| Name: |
| Signature: |
| Hide-PM-Coord: |
| Hide-CO-Coord: |
| Hide-CSO-Coord: |
| Hide-Legal-Coord: |
| Hide-COCO-Coord: |
| Hide-CA-Coord: |
| Hide-Blank-1-Coord: |
| Hide-Blank-2-Coord: |
| Section-I-Text: |
| Section-II-Text: |
| Section-III-Text: |
| Section-IV-Text: |
| Section-V-Text: |
| Section-VI-Text: |
| Section-VII-Text: |
| Section-VIII-Text: |
| Section-IX-Text: |
| Section-X-Text: |
| Section-XI-Text: |
| Section-XII-Text: |
| Section-XIII-Text: |
| Remove-Guidance-Pages: 1 |