SSJ_Redacted.pdf

PDF 713 KB Posted

Attached to
Audi Field Bed-Down Services Federal contract opportunity
Solicitation number
W912R125C2001
Issued by
Department of the Army National Guard

About this file

This is a Justification Review Document and Justification for Other than Full and Open Competition for bed-down services at Audi Field to support the 2025 Presidential Inauguration (PI60) mission. The District of Columbia National Guard requires bed-down services including venues, meals, vehicle staging, security and assembly areas for 8,000-18,100 personnel from January 15-23, 2025, with Audi Field having capacity for 615 service members.

The document justifies sole-source procurement based on extensive market research of 25 locations within the Joint Operations Area (JOA). Only Audi Field and Nationals Park were deemed viable due to their proximity (less than 3 miles from JOA) and availability during the required timeframe. Other venues like Capital One Arena, Washington Convention Center, Northwest Stadium, and Entertainment Sports Arena were ruled out due to scheduling conflicts. The procurement was previously conducted in January 2021 under contract W912R121C0002. The current action will be a firm-fixed-price contract using O&M Army funds, with requirements for a small business subcontracting plan since the contract will exceed $750,000. The contracting activity is the District of Columbia Army National Guard in Arlington, VA.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEPTEMBER 5, 2024 CUI//SP-SSEL 2 of 5SEPTEMBER 5, 2024 CUI//SP-SSEL 2 of 5

CUI//SP-SSEL

Justification for Other than Full and Open Competition Instructions

Local Control Number NGB Control Number (if applicable)

DCARNG JA-BI001 25-001

1a. CONTRACTING ACTIVITY b. Requiring Activity

District of Columbia Army National Guard, UDistrict of Columbia Army National Guard

2a. NATURE OF ACTION

Only one source.

b. Contract Action

New Contract

c. Contract Type

Firm Fixed Price

d. Fund Type

O&M, Army

3a. ESTIMATED TOTAL PRICE OF REQUEST (including options, if any) b. If Applicable, Estimated Price of Supplies/Services

4a. Name of Requirement

Audi Field Bed-Down Services

b. Description of Requirement

The District of Columbia National Guard (DC NG) must provide bed-down services including venues, meals, vehicle staging, security and assembly areas for 8,000 to 18,100 personnel from 15-23 January 2025. Audi Field has the capability to service (615) service members.

c. Demonstrate, in Detail, Why This Specific Item or Service, is the Only One That Meets Your Requirements

To identify facilities that could provide the necessary bed-down space and life support capabilities for approximately 8,000 personnel to support the Presidential Inauguration (PI60) mission requirements, the DC NG has carried out extensive market research and conducted on-site inspections of more than (25) locations within the Joint Operations Area (JOA). The results of market research revealed that Audi Field and Nationals Park were determined only viable commercial options due to their proximity to the JOA and venue availability during the PI60 time frame. All venues outside the District do not meet the 30-minute response requirement due to traffic and other planning factors. Both Audi Field and Nationals Park are approximately less than 3 miles from the JOA perimeter, ensuring rapid response capabilities.

Several other facilities in the National Capital Region were considered but ultimately deemed unsuitable for various reasons. The Capital One Arena was already committed to other federal events and sports games, while the Washington Convention Center had prior bookings, including inaugural balls and the DC Car Show from January 12-19, 2025. Northwest Stadium and the Entertainment and Sports Arena were initially considered as potential venues, as they met the necessary capacity and staging requirements. However, they ultimately became unavailable due to scheduling conflicts during the required period of January 15-23, 2025. Specifically, Northwest Stadium was committed to hosting potential playoff games for the Washington Commanders, given their winning streak. Meanwhile, the Entertainment and Sports Arena had prior bookings for January 17-18, 2025, which conflicted with the event schedule. District schools were not an option as the Mayor's office did not plan to close them during the desired time frame. Additionally, commercial hotels were not feasible due to financial constraints, which made it difficult to secure a limited number of venues for logistical and security purposes.

In addition to Audi Field and Nationals Park, the government intends to establish support agreements with the General Service Administration (GSA) for three GSA buildings to meet the entire sustainment needs. These agreements will provide additional bed-down space and life support capabilities, ensuring that the PI60 mission requirements are met.

The utilization of Audi Field and Nationals Park as the primary venues for the PI60 mission would greatly alleviate potential logistical challenges on main and alternate supply routes, as they can accommodate in-house subsistence requirements. This mitigates a significant risk to the successful execution of the mission and sustainment efforts. These venues provide ample space for staging areas, which will be used for shower trailers, portable toilets, and other hygiene services. The close proximity of these venues to the JOA perimeter also ensures rapid response capabilities, which is critical for the successful execution of the mission.

Audi Field and Nationals Park have available bed-down space to support the PI60 mission requirements, given external competition for housing during PI60 and other federal agency RFAs for support. Both facilities are approximately less than 3 miles from the JOA perimeter, ensuring rapid response capabilities. Both facilities can provide the necessary life support capabilities for Task Force (TF) Reserve elements, including Command and Control (C2) nodes, within the JOA and reach back to the DC Armory and other Base Support Installations (BSIs).

SEPTEMBER 5, 2024 CUI//SP-SSEL 5 of 5

CUI//SP-SSEL

Head of Contracting Activity (HCA) Acting as.

I have reviewed this justification and find it adequate to support other than full and open competition. See comments below. (Field will expand as needed.)

Name Date Phone

12. REDACTION INSTRUCTIONS

After completion and signatures, print to PDF. In Adobe, Redact items such as, but not limited to:

1. Dollar amounts.

2. Names.

3. Signatures.

4. Proprietary information.

FAR 5.401, FAR 24.1, and FAR 24.2