This document is a Memorandum justifying the use of other than full and open competition for the procurement of a CIRCUIT BREAKER for the USNS Lewis and Clark under the simplified acquisition threshold.

The key details are:

  • The required item is a CIRCUIT BREAKER, part number CHLD3600FVWH09K2, which is used to supply power to the cargo refrigeration system.
  • The item is a brand name sole source from EATON CORPORATION or its authorized distributors due to restrictive rights and the item being critical ship equipment.
  • The required delivery date is June 28, 2024 and the procurement is being conducted under an urgent and compelling circumstance, as the ship is unable to supply refrigerated cargo without the replacement part.
  • The procurement will be conducted by the Department of the Navy's Military Sealift Command under Solicitation Number N3220524Q2085.

View the file

Other files

File Type Posted
COMBINED SYNOPSIS SOLICITATION.docx DOCX document
COMBINED SYNOPSIS SOLICITATION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: June 4, 2024

MEMORANDUM

Subj:USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER THE SIMPLIFIED ACQUISITION THRESHOLD
Ref:(a)USNS Lewis and Clark PR Number(s): ERP# 1301169868 / N231914142W275

I. BACKGROUND:

1. In considering the references, FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contacting Officers may solicit from one source if the Contracting Officer determines that, under the circumstances of the contract action, only one source is reasonably available (e.g., urgency, exclusive licensing, brand-name, or industrial mobilization).

2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition because only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.

II. DESCRIPTION OF ITEM OR SERVICE:

1. Provide a description of the item or service required, to include

a) the name of the required source or brand name

EATON CORPORATION

b) the required delivery date/period of performance and

RDD June 28, 2024

c) its intended use.

CIRCUIT BREAKER IS USED TO SUPPLY POWER TO THE CARGO REFRIGERATION SYSTEM.

2. List the source(s) or known vendor(s) who are able to provide the above described item or service.

EATON CORPORATION OR ANY EATON AUTHORIZED DISTRIBUTOR

III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS BASED

ON THE FOLLOWING (select all that apply):

A. X BRAND NAME SOLE SOURCE (select all that apply):

1. X RESTRICTIVE RIGHTS: the source has established proprietary rights, limited rights in data, patent rights, copyrights, or secret processes in the item or service.

a. Explain what is subject to the restrictive rights.

EATON CORP. OWNS THE PROPRIETARY RIGHTS TO THE DRAWINGS AND MATERIAL TO BE UTILIZED IN THE TAKE CLASS HVAC SYSTEMS INCLUDING CARGO REFRIGERATION SYSTEMS. EATON CORP OR ITS AUTHORIZED

Ver 2.0 (01 July 2018)

DISTRIBUTORS ARE THE ONLY KNOWN SOURCE FROM WHICH THIS PART CAN BE PURCHASED.

b. If drawings are included, who is identified as “owning” the drawings.

2. EXCLUSIVE LICENSING AGREEMENTS: The item or service is only available from the Original Equipment Manufacturer (OEM), or there is ONLY ONE authorized distributor or technical representative for the OEM.

a. Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.

b. Identify the distributor / authorized technical representative for the item or service. Provide evidence of the exclusive licensing agreement as an attachment to this document. (NOTE: If there is more than one distributor / authorized technical representative, then use Part B – Brand Name.)

3. _X OTHER REASON:

a. X CRITICAL SHIP EQUIPMENT: The required item is critical ship equipment, the failure of which poses a hazard to the ship, the crew or the environment.

i. SMS Procedure Number: 10.6-002-ALL

ii. Describe how it applies to the critical piece of equipment: SMS NUMBER 10.6-002-ALL LISTS THE CARGO REFRIGERATION SYSTEM SYSTEM AS CRITICAL EQUIPMENT. THE LOSS OF THE CARGO REFRIGERATION SYSTEM PUTS THE SHIP IN A C-3 STATUS, THUS BECOMING UNABLE TO PERFORM THE PRIMARY MISSION OF PROVIDING REFRIGERATED CARGO SUPPLY TO THE FLEET.

PROPER REPLACEMENT PARTS ARE CRITICAL TO THE SAFE OPERATIONS OF T-AKE VESSEL CARGO REFRIGERATION SYSTEM.

b. X_ STANDARDIZATION / BRAND NAME: Per MSCs standardization initiative, only the specified make/model of the equipment/parts will satisfy the Government’s needs for additional units or replacement items.

i. Identify Make / Model Number(s): CHLD3600FVWH09K29

ii. Identify other vessels with this Make / Model: THE ENTIRE TAKE CLASS SHIP; SHIP’S 1-14.

c. FORM, FIT, AND FUNCTION: Item is direct replacement parts / components for existing equipment and must be compatible in terms of form, fit, and function with existing equipment / configurations.

i. Identify Make / Model of existing equipment:

ii. Describe how the equipment must be compatible with the existing configuration.

d. X OTHER: Other reasons not identified above (i.e., statutory requirement such as harbor pilot services): MSC DOES NOT HAVE MANUFACTURING AND TECHNICAL INFORMATION REQUIRED TO EVALUATE AND DETERMINE WHETHER NON-OEM COMPONENTS AND REPLACEMENT PARTS OFFERED ARE EQUIVALENT TO THE OEM COMPONENTS AND REPLACEMENT PARTS

4. UNUSUAL AND COMPELLING URGENCY: The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits. Urgent requirements are supplies or services that will result in work stoppage, or are mission critical and the routine processing time would injure the Government. The determination that the procurement for the above is an urgent and compelling requirement is based on the following:

a. Date on which the requirement was identified/reported: 20MAY2024/21MAY2024

b. Required delivery date / Period of Performance: 28JUNE2024

c. If the difference between a. and b. is more than one week, explain the delay in submitting the requirement.

d. Estimated production lead time: UNK

e. Explanation of why delivery / commencement of services by the date required is needed: (explain the impact to the mission, any special circumstances or conditions, etc.) SHIP UNABLE TO SUPPLY CARGO REFRIGERATED SUPPLIES TO CLF SHIPS

f. CASREP Number: C24-15