SSJ_Over SAT_signed.pdf
PDF 116 KB Posted
- Attached to
- Bituminous Coal Federal contract opportunity
- Solicitation number
- FA4626-23-P-0011
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
CONTROLLED UNCLASSIFIED INFORMATION
April 2021 CONTROLLED UNCLASSIFIED INFORMATION Page 1 of 4April 2021 CONTROLLED UNCLASSIFIED INFORMATION Page 1 of 4
NOTE: If a Justification was approved for the preceding acquisition, a copy of the approved Justification for the predecessor action must be included in the staff package for approval of the instant Justification. This applies to Justification staff packages that are submitted for review and approval at a level above the contracting officer. The predecessor Justification will be used as a reference document by the approving official.
Is this a new or amended J&A Document? New Amended ( Prior to Award Only! )
Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan? Yes No
Funding level for this acquisition: >SAT and < $750K > $750K and < $15M
Contracting Activity: 341st Contracting Squadron
Purchase Request / Local ID Number:
Program / Project (and PE, if applicable): Bituminous Coal
Program Type (PEO or Other Contracting): N/A
Authority: AFFARS 5313.501 - 10 U.S.C. 2302b, Implementation of Simplified Acquisition Procedures (41 U.S.C. 1901)
AFFARS 5313.501 - 10 U.S.C. 2304a, Special Emergency Procurement Authority (41 U.S.C. 1903)
Estimated Contract Cost (including options): $277,200.00 Justification Type: Class Individual
COORDINATION ( AFFARS 5306.304(a)) Sign and Save Procedure
** The text in the signature blocks below is editable, including the title.
** To remove a row, click the "X" next to the signature block. CAUTION: Once removed, it can only be restored by downloading the BLANK FORM again.
APPROVAL (AFFARS 5306.304(a) )
Date
15 Mar 2023
Contracting Officer Shanna M. Guillen
341 CONS/PKB/731-4087
Signature
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
April 2021 CONTROLLED UNCLASSIFIED INFORMATION Page 2 of 4April 2021 CONTROLLED UNCLASSIFIED INFORMATION Page 2 of 4
I. Contracting Activity.
341st Contracting Squadron, Malmstrom Air Force Base, Montana.
II. Nature and/or description of the action being processed.
An individual J&A for a single contract
III. Description of supplies/services required to meet agency needs.
This requirement is for the purchase of 1,500 tons of Bituminous Coal for Malmstrom Air Force Base central heating plant.
The contractor shall provide 1,500 tons of Bituminous Stoker Coal 1 ½”x ¼” by railcar or truck to Malmstrom AFB Central Heating Plant. All coal shall be sprayed with non-oil based dust suppression.
Contractor shall guarantee the coal will meet the provided specifications to be proven by a relative sample of 50 lbs per every 1000 tons produced to be tested by a laboratory.
IV. Statutory authority permitting other than full and open competition.
IAW FAR Part 13.501(a)(2)(i)
For a proposed contract exceeding the simplified acquisition threshold, but not exceeding $750,000, the contracting officer’s certification that the justification is accurate and complete to the best of the contracting officer’s knowledge and belief will serve as approval, unless a higher approval level is established in accordance with agency procedures.
V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).
The recommended source is the only local provider of 1 1/2" Bituminous Stoker coal that meets the required characteristics and specifications for use with the Detroit Stoker Spreader Coal Feeders that are used on the High Temperature Hot Water Generators at Malmstroms Heat Plant. The coal has to meet the required specifications to insure compliance with the State and Federal Air Quality regulations (Malmstroms Air Quality Permit). Coal purchased that doesn't meet the required characteristics and specifications can cause a failure to comply with Malmstroms Air Quality Permit which would shutdown Plant operations and cause a risk of catastrophic damage to 70 infrastructure buildings and incurring fines for non compliance.
Based on historic data for this type of requirement, the need for the coal to meet the required specifications to ensure compliance with the State and Federal Air Quality regulations and the Local Purchase Authority granted by DLA Energy, Gebhardt Post Plant & Sawmill is the only local source able to provide coal for this requirement.
VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.
The Notice of Intent to Sole Source was posted to SAM.gov for 15 business days from 8 March 2023 to 23 March 2023. The government received no interested parties in response to the notice.
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
April 2021 CONTROLLED UNCLASSIFIED INFORMATION Page 3 of 4April 2021 CONTROLLED UNCLASSIFIED INFORMATION Page 3 of 4
In previous years, the 341st Contracting Squadron (CONS) has tried to solicit from multiple sources for this repeat requirement and have not found any vendors capable of meeting the requirements set forth by the customer. At this present time, market research does not present any available competition endeavors available for this acquisition. Furthermore, the Government received no response with a capability statement in the response to the Notice of Intent to Sole Source issued. Due to the historical lack of competition and Malmstrom's stringent specifications and location, Gebhart Post Plant & Sawmill is the only available source.
VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.
Based upon the market research done by 341 CONS and similar purchase found fair and reasonable, the undersign believes to have adequate justification to determine the quote from Gebhardt Post Plant & Sawmill to be fair and reasonable.
VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.
It was indicated during initial research for this requirement that this type of service is customarily available in the commercial marketplace. Due to the fact that this requirement is available to the general public, as well as the Government, the definition of a commercial item in accordance with (IAW) Federal Acquisition Regulation (FAR) 2.101 has been met.
Gebhardt Post Plant & Sawmill was awarded FA4626-21-P-0009 on a sole source basis in Fiscal Year 2021, then again in 2022 under FA4626-22-P-0022. FA4626-16-P-0030 was awarded to another company as a "test run" to try and increase competition, but the coal purchased under that contract did not satisfy the environmental requirements of 341 CES. Due to the historical lack of competition, Malmstrom's stringent specifications and location, Gebhardt Post Plant & Sawmill is the only available source.
IX. Any other facts supporting the use of Other Than Full and Open Competition.
Due to Malmstrom AFB's stringent specifications and its location, competition has always been extremely limited for this requirment. Malmstrom AFB has been granted local purchase authority since 2015. The DLA Energy Contracting Officer formerly grants Malmstrom AFB to purchase its coal requirement locally for the performance period of May 1, 2023 through April 30, 2024.
X. List of any sources that expressed, in writing, an interest in the acquisition.
None.
XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.
Based on the justification for sole source and the need for the coal to meet the required specifications to ensure compliance with the State and Federal Air Quality regulations, there are no steps to include future sole source awards unless the Air Force deems another energy source to be more advantageous.
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
April 2021 CONTROLLED UNCLASSIFIED INFORMATION Page 4 of 4
XII. Certification by the Contracting Officer.
As evidenced by my signature above, I certify that this justification is accurate and complete to the best of my knowledge and belief.
XIII. Certification by the technical/requirements personnel.
As evidenced by my signature above, I certify that any supporting data contained herein, which is my responsibility, is both accurate and complete.
Remove the Guidance pages below.
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items April 2021 Page of International Agreement Competitive Restrictions (IACR) March 2018 Page of NOTE: If a Justification was approved for the preceding acquisition, a copy of the approved Justification for the predecessor action must be included in the staff package for approval of the instant Justification. This applies to Justification staff packages that are submitted for review and approval at a level above the contracting officer. The predecessor Justification will be used as a reference document by the approving official.
Is this a new or amended J&A Document?
Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan?
Funding level for this acquisition:
Authority:
Justification Type:
COORDINATION ( AFFARS 5306.304(a)) ** The text in the signature blocks below is editable, including the title.
** To remove a row, click the "X" next to the signature block. CAUTION: Once removed, it can only be restored by downloading the BLANK FORM again.
APPROVAL (AFFARS 5306.304(a)) NOTE: A signature block will appear here based on the funding level selected above.
(See "Specific Guidance for Completing this Template" below.)
I. Contracting Activity.
II. Nature and/or description of the action being processed.
III. Description of supplies/services required to meet agency needs.
IV. Statutory authority permitting other than full and open competition.
V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).
VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.
VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.
VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.
IX. Any other facts supporting the use of Other Than Full and Open Competition.
X. List of any sources that expressed, in writing, an interest in the acquisition.
XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.
XII. Certification by the Contracting Officer.
XIII. Certification by the technical/requirements personnel.
Specific Guidance for Completing this Template
I. Contracting Activity. (FAR 6.303-2(b)(1))
Fully identify the contracting agency and organizational activity responsible for the proposed contracting action.
II. Nature and/or description of the action being processed. (FAR 6.303-2(b)(2))
State whether the action will be awarded as a new contract or by modification to an existing contract (identify contract number) and identify the type contract planned (FAR 12.207 and DFARS 212.207).
An individual Justification cannot be used to support more than one contract irrespective of the quantities or the dollar value stated therein. If a proposed contract will contain unpriced options (including NTE prices), those options must be supported by a separate Justification prior to option exercise or the Justification supporting the basic contract must be a Class Justification. For Class Justification situations (covers more than one contract) where the number of contracts in the class can be identified: (1) Provide a brief general description of actions; (2) identify the supplies and services that are being acquired; and (3) for each contract in the class identify the contractor, estimated value, type of contract and rationale for contract length, and estimated award date. Where the same information applies to more than one contract within the class, it need only be stated one time.
III. Description of the supplies/services required to meet agency needs. (FAR 6.303-2(b)(3))
Specifically describe the supplies and/or services to be acquired, the total estimated value of the acquisition - including options (provide cost estimate by year and, for class Justifications, by contract action), and the estimated delivery dates/periods of performance If commodities are being procured, provide quantities. All contract line items (CLIN) -- e.g., technical data, support equipment, support services, etc. -- should be listed. If all of the ancillary requirements associated with a particular item are not specifically described in the Justifications, those ancillary requirements cannot be included in the resulting contract and would require a second Justification. Also, state the type of appropriation (e.g., 3010, 3400) that will be used to fund each requirement listed.
If approval for more than one fiscal year requirement is needed, give the rationale for this request. Generally, the scope of these actions is limited to current requirements only, so that actions may be taken to facilitate competition for out-year requirements.
In some cases, there are no feasible actions that could develop future competition, and it is reasonable to seek approval for more than one fiscal year's requirements.
For ID/IQ or requirements contracts, use the maximum dollar value of the total estimated orders as the estimated Justification dollar value.
IV. Statutory authority permitting other than full and open competition. (FAR 6.303-2(b)(4)) V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority). (FAR 6.303-2(b)(5))
Provide, in narrative form, a detailed explanation supporting and clearly relating to the conditions described by the FAR for using the particular authority cited. This section is normally the most detailed part of the justification as the essence of the justification is presented here. For acquisitions that include both supplies and services, separately justify the use of the authority for the services and supplies.
Contracting without providing for full and open competition shall not be justified on the basis of lack of advance planning by the requiring activity or concerns related to the amount of funds available (e.g., funds will expire) (10 U.S.C. 2304(f)(4)).
VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.
(FAR 6.303-2(b)(6))
Describe all efforts taken (or to be to be taken) to ensure that offers are solicited from as many potential sources as practicable under the circumstances. Although Market Research is covered in Section VIII, the information in Section VI should correlate with the Market Research described in Section VI. The following issues should be addressed in this paragraph:
Sources Sought Synopsis (used as part of market research). If a sources sought synopsis was issued, state the date the synopsis was issued and a brief description of its content. If any responses were received, describe in detail the results of the screening process and the rationale for determining the unacceptability of any synopsis respondents. Reference FAR 13.105, Synopsis and Posting Requirements.
Other Actions. In this paragraph, discuss any other actions taken or planned to facilitate competition for this acquisition. The discussion should include actions tried or considered even if the actions were unsuccessful. If the efforts were unsuccessful, so state and describe why.
Qualifying Country Sources. If qualifying country sources have expressed interest, but are to be excluded, provide supporting rationale.
VII. Determination by the Contracting Officer that the anticipated cost to the government will be fair and reasonable. (FAR 6.303-2(b)(7))
Include a statement by the contracting officer that the anticipated cost will be considered fair and reasonable and provide the basis for this determination. The steps that will be taken to ensure the final contract price will be fair and reasonable are also described here. Describe the extent of cost or price analysis anticipated including the requirements for certified cost or pricing data, technical evaluations, and audits.
VIII. Description of the market research conducted and the results, or explain why market research was not conducted. (FAR 6.303-2(b)(8))
Generally, some form of market research should be conducted. Discuss any market research conducted pursuant to FAR Part 10 and describe results of that research. Market research is any effort undertaken to determine if sources capable of satisfying the agency's requirements exist and to determine if commercial items or non-developmental items are either available or can be modified so that they will satisfy the agency's needs. Market research should be focused not only on identifying alternate sources, but also on alternate equipment or substitutes that might fulfill the Government needs with only minor modification. Regardless of the approach used, the results should provide a high level of confidence that no other qualified sources exist.
When other exceptions from the requirement to obtain full and open competition are relied upon, the market research might be limited to an examination of the acquisition history and experience with the marketplace under previous acquisitions for the same or similar items.
If no market research was conducted, so state and provide the rationale.
IX. Any other facts supporting the use of Other Than Full and Open Competition. (FAR 6.303-2(b)(9)(i))
Provide any other facts supporting the use of other than full and open competition, including an explanation of why technical data packages, specifications, engineering descriptions, statements of work, statements of objectives, or purchase descriptions suitable for full and open competition have not been developed, are not being developed, are not being used, or are not available.
X. List of sources, if any, that expressed interest in the acquisition. (FAR 6.303-2(b)(10))
If a sources sought synopsis was done and all interested sources are included in Section VI, it is acceptable to state, “See Section VI above.”
XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required. (FAR 6.303-2(b)(11))
Describe any actions taken or to be taken to foster competition for future acquisitions of the supplies or services being acquired. Describe potential actions that could be taken to remove the barriers to competition that have been identified in the justification and include a milestone schedule, where available, for accomplishing these actions. For example, if a follow-on competitive acquisition is planned, so state and provide the planned award date, or state that the Government will attempt to acquire rights in technical data and computer software sufficient to compete follow-on acquisitions as a priced option in the contract action that is the subject of this Justification, or (if applicable) state how the Government intends to challenge nonconforming markings on technical data and computer software delivered to it under previous contracts so those markings can be removed in order that the technical data and computer software may be used in support of a follow-on competitive acquisition, or describe plans to qualify additional sources.
Address efforts to ensure competition for future spare parts and maintenance in support of systems or equipment covered by the justification, even when these acquisitions will be accomplished by other organizations. Include a discussion on available breakout data.
If no actions are planned, so state and provide reasons. If approval is sought for more than one year, explain why a sole source effort is required for the planned time duration.
For a non-competitive follow-on acquisition to a previous award for the same supply or service supported by a Justification citing the same authority, include a discussion of the actions planned to overcome barriers to competition established in the previous justification, the status of those actions, and the results of those actions. The approval authority shall determine whether the planned actions were completed. If the planned actions were not completed, the justification for the follow-on acquisition shall be approved by the approval authority one-level above the approval authority for the previous justification (see FAR 13.501(a)(2)). If the previous justification was approved by the Senior Procurement Executive (SPE), the approval remains at the SPE level.
[DFARS 213.501(a) and DFARS PGI 206.304(a)(S-70)(ii)] XII. Certification by the Contracting Officer. (FAR 6.303-2(b)(12))
As evidenced by his/her signature, the contracting officer has determined this document to be both accurate and complete to the best of his/her knowledge and belief.
XIII. Certification by the technical/requirements personnel. (FAR 6.303-2(c))
As evidenced by their signatures, the technical and/or requirements personnel have certified that any supporting data contained herein, which is their responsibility, is both accurate and complete.
Do You Need to "REDACT" Text?
This template is interactive and has special features. In its current state, it cannot be redacted. In order to redact any portion of this template, you must first convert it to a normal PDF file. Click here for instructions.
9.0.0.2.20120627.2.874785
| security_markings: CONTROLLED UNCLASSIFIED INFORMATION |
| CurrentPage: |
| PageCount: |
| new: |
| amended-with-original: |
| Yes: |
| No: |
| range_under-700K: |
| range_700K-13.5M: |
| Contracting-Activity: 341st Contracting Squadron |
| PR-ID-Number: |
| Program-Project: Bituminous Coal |
| Program-Type: N/A |
| class: |
| individual: |
| Estimated_Cost: 277,200.00 |
| Sign_and_Save_1: |
| Date: 14 Sep 2022 |
| Date: 15 Mar 2023 |
| Name: |
| Signature: |
| Hide-PM-Coord: |
| Hide-CO-Coord: |
| Hide-CSO-Coord: |
| Hide-Legal-Coord: |
| Hide-COCO-Coord: |
| Hide-CA-Coord: |
| Hide-Blank-1-Coord: |
| Hide-Blank-2-Coord: |
| Section-I-Text: |
| Section-II-Text: |
| Section-III-Text: |
| Section-IV-Text: |
| Section-V-Text: |
| Section-VI-Text: |
| Section-VII-Text: |
| Section-VIII-Text: |
| Section-IX-Text: |
| Section-X-Text: |
| Section-XI-Text: |
| Section-XII-Text: |
| Section-XIII-Text: |
| Remove-Guidance-Pages: 1 |
File details come from the government source that posted it. Updated .