SSJ_N4044325Q0066 Redacted.pdf
PDF 97 KB Posted
- Attached to
- Notice of intent to issue a sole source award
- Solicitation number
- Not on record
About this file
This document is a Memorandum justifying the use of other than full and open competition for an acquisition under the simplified acquisition threshold. The Military Sealift Command intends to sole-source a contract to Raytheon for crew training and equipment troubleshooting for the USNS ROBERT F. KENNEDY (T-AO 208), with a performance period of June 12-17, 2025. The justification is based on Raytheon's restrictive rights, specifically that their equipment is an original equipment manufacturer (OEM) design manufactured specifically to fit the T-AO 208 vessel, and must meet ABS and USCG ship class configuration rules. The anticipated procurement will be conducted under the simplified acquisition threshold, with Raytheon identified as the sole source vendor.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 Ver 2.0 (01 July 2018)
Date: 05 JUNE 2025
MEMORANDUM
Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER
Ref:
THE SIMPLIFIED ACQUISITION THRESHOLD
(a) PR Number(s)
I. BACKGROUND:
1. In considering the references, FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contacting Officers may solicit from one source if the Contracting Officer determines that, under the circumstances of the contract action, only one source is reasonably available (e.g., urgency, exclusive licensing, brand-name, or industrial mobilization).
2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition because only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.
II. DESCRIPTION OF ITEM OR SERVICE:
1. Provide a description of the item or service required, to include
a) the name of the required source or brand name
RAYTHEON
b) the required delivery date/period of performance
_______ JUNE
c) its intended use. T-AO 208 CREW TRAINING AND EQUIPMENT
TROUBLESHOOTING
2. List the source(s) or known vendor(s) who are able to provide the above described item or service.
RAYTHEON
III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS BASED
ON THE FOLLOWING (select all that apply):
A. X Only one responsible source (select all that apply):
1. X_ RESTRICTIVE RIGHTS: the source has established proprietary rights, limited rights in data, patent rights, copyrights, or secret processes in the item or service.
a. Explain what is subject to the restrictive rights.
Raytheon equipment is OEM design and manufacture equipment to fit T-AO 208
b. If drawings are included, who is identified as �owning� the drawings.
2 Ver 2.0 (01 July 2018)
2. ___ EXCLUSIVE LICENSING AGREEMENTS: The item or service is only available from the Original Equipment Manufacturer (OEM), or there is ONLY ONE authorized distributor or technical representative for the OEM.
a. Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.
b. Identify the distributor / authorized technical representative for the item or service.
Provide evidence of the exclusive licensing agreement as an attachment to this document.
(NOTE: If there is more than one distributor / authorized technical representative, then use Part B � Brand Name.)
3. ___ OTHER REASON:
a. ___ CRITICAL SHIP EQUIPMENT: The required item is critical ship equipment, the failure of which poses a hazard to the ship, the crew or the environment.
b. ___ STANDARDIZATION / BRAND NAME: Per MSCs standardization initiative, only the specified make/model of the equipment/parts will satisfy the Government�s needs for additional units or replacement items.
i. Identify Make / Model Number(s):
ii. Identify other vessels with this Make / Model:
c. _____ FORM, FIT, AND FUNCTION: Item is direct replacement parts / components for existing equipment and must be compatible in terms of form, fit, and function with existing equipment / configurations.
i. Identify Make / Model of existing equipment:
ii. Describe how the equipment must be compatible with the existing configuration.
This is a Trans-ALT install and must meet the rest of the ship class configuration as required by ABS and USCG rules.
d. _____ OTHER:
4. __ UNUSUAL AND COMPELLING URGENCY: The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits. Urgent requirements are supplies or services that will result in work stoppage, or are mission critical and the routine processing time would injure the Government. The determination that the procurement for the above is an urgent and compelling requirement is based on the following:
a. Date on which the requirement was identified: _______________
b. Required delivery date / Period of Performance: ______
3 Ver 2.0 (01 July 2018)
c. If the difference between a. and b. is more than one week, explain the delay in submitting the requirement.
d. Estimated production lead time: _____
e. Explanation of why delivery / commencement of services by the date required is needed: (explain the impact to the mission, any special circumstances or conditions, etc.)
f. CASREP Number:
IV. ANTICIPATED DOLLAR VALUE OF PROCURMENT:
4 Ver 2.0 (01 July 2018)
V. CERTIFICATIONS AND APPROVALS:
Technical / Requirement Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.
File details come from the government source that posted it. Updated .