SSJ Mooring Fittings_Redacted.pdf
PDF 554 KB Posted
- Solicitation number
- N3220524Q0310
About this file
This document is a Memorandum explaining the use of other than full and open competition for an acquisition under the simplified acquisition threshold. The required items are deck mounted Panama Chocks and Mooring Bits for installation on the USNS ROBERT E SIMANEK (T ESB 7) vessel, with a required delivery date of 03 March 2025. The sole source justification is based on the items being critical ship equipment from the Original Equipment Manufacturer, Saejin Intech CO., LTD, which is a foreign vendor in South Korea, and the authorized distributor is CS Controls Inc. The anticipated dollar value of the procurement is not provided. The related federal contract opportunity is a Request for Quotes (RFQ) solicitation number N3220524Q0310 issued by the Department of the Navy Military Sealift Command, with responses due by 25 June 2024 and a required delivery and acceptance date of 03 March 2024 at the Norfolk, Virginia location.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combined_Synopsis_Solicitation_Template(2024.06.10).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 Ver 2.0 (01 June 2018)
Date: __5/14/2024__________
MEMORANDUM
Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER
THE SIMPLIFIED ACQUISITION THRESHOLD
Ref: (a) PR Number(s): _________________________________________
I. BACKGROUND:
1. In considering the references, FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contacting Officers may solicit from one source if the Contracting Officer determines that, under the circumstances of the contract action, only one source is reasonably available (e.g., urgency, exclusive licensing, brand-name, or industrial mobilization).
2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition because only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.
II. DESCRIPTION OF ITEM OR SERVICE:
1. Provide a description of the item or service required, to include
a) the name of the required source or brand name
Saejin Intech CO., LTD is the Original Equipment Manufacturer and a foreign vendor in South
Korea. CS Controls Inc. is the authorized distributor.
b) the required delivery date/period of performance and
03 March 2025
c) its intended use.
Procurement of deck mounted Panama Chocks and Mooring Bit for installation onboard USNS
ROBERT E SIMANEK (T ESB 7).
2. List the source(s) or known vendor(s) who are able to provide the above described item or service.
Saejin Intech
CS Controls Inc.
III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS BASED
ON THE FOLLOWING (select all that apply):
A. ____ Only one responsible source (select all that apply):
1. ____ RESTRICTIVE RIGHTS: the source has established proprietary rights, limited rights in data, patent rights, copyrights, or secret processes in the item or service.
a. Explain what is subject to the restrictive rights.
tommy.a.hale Typewritten Text N4099B41384001
2 Ver 2.0 (01 June 2018)
b. If drawings are included, who is identified as “owning” the drawings.
2. _____ EXCLUSIVE LICENSING AGREEMENTS: The item or service is only available from the Original Equipment Manufacturer (OEM), or there is ONLY ONE authorized distributor or technical representative for the OEM.
a. Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.
b. Identify the distributor / authorized technical representative for the item or service.
Provide evidence of the exclusive licensing agreement as an attachment to this document.
(NOTE: If there is more than one distributor / authorized technical representative, then use Part
B – Brand Name.)
3. _X___ OTHER REASON:
a. _____ CRITICAL SHIP EQUIPMENT: The required item is critical ship equipment, the failure of which poses a hazard to the ship, the crew or the environment.
i. SMS Procedure Number: ___________________________
b. __X__ STANDARDIZATION / BRAND NAME: Per MSCs standardization initiative, only the specified make/model of the equipment/parts will satisfy the Government’s needs for additional units or replacement items.
i. Identify Make / Model Number(s): Saejin Intech
ii. Identify other vessels with this Make / Model:
USS LEWIS B PULLER (TESB 3), USS HERSHEL WILLIAMS (TESB 4),
USS MIGUEL KEITH (T ESB 5) and USS JOHN L CANLEY (T ESB 6)
c. _X__ FORM, FIT, AND FUNCTION: Item is direct replacement parts / components for existing equipment and must be compatible in terms of form, fit, and function with existing equipment / configurations.
3 Ver 2.0 (01 June 2018)
i. Identify Make / Model of existing equipment: Saejin Intech
ii. Describe how the equipment must be compatible with the existing configuration.
In order to maintain consistency across the class for installation and logistics, the same model of mission deck mooring fittings is required to be procured from the same
Manufacturer or its authorized distributor. The safe working load is critical for safety to the ship and the crew. This mission deck mooring fitting is approved model by ABS for installation and on ESB’s and maintains the class certification for Safety.
d. __X___ OTHER:
MSC does not have manufacturing and technical information required to evaluate and determine whether non-OEM service and replacement parts offered are equivalent to the OEM components and replacement parts. T-ESB vessels are under limited manufacture warranty and only OEM parts can be installed for this radar system.
4. ____ UNUSUAL AND COMPELLING URGENCY: The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits. Urgent requirements are supplies or services that will result in work stoppage, or are mission critical and the routine processing time would injure the Government. The determination that the procurement for the above is an urgent and compelling requirement is based on the following:
a. Date on which the requirement was identified: ____________________
b. Required delivery date / Period of Performance: _________________
c. If the difference between a. and b. is more than one week, explain the delay in submitting t he requirement.
d. Estimated production lead time: ______________________________
e. Explanation of why delivery / commencement of services by the date required is needed: (explain the impact to the mission, any special circumstances or conditions, etc.)
f. CASREP Number: _______________________________
IV. ANTICIPATED DOLLAR VALUE OF PROCURMENT: __ ___________________
4 Ver 2.0 (01 June 2018)
V. CERTIFICATIONS AND APPROVALS:
Technical / Requirement Certification: I certify that the facts and representation under my cognizance, which are included in this justification, are complete and accurate to the best of my knowledge and belief.
File details come from the government source that posted it. Updated .