SOW Supply Building Repairs-Revised.doc
DOC document 33 KB Posted
- Solicitation number
- SSA-RFP-10-1039
- Issued by
-
Social Security Administration
About this file
Attachment D-Updated SOW Supply Building
View the file
Other files
| File | Type | Posted |
|---|---|---|
| loading dock ceiling-Model.jpg | JPG image | |
| Answers to Site Visit Questions.doc | DOC document | |
| Pre Proposal Conference Notes.pdf | ||
| Amendment 3 Cover Sheet.pdf | ||
| Answers to Site Visit Questions 2.doc | DOC document | |
| Amendment 1 Cover Sheet.pdf | ||
| PostAward Documents.doc | DOC document | |
| MD100037 Wage Determination.pdf | ||
| RFTOP-1st Task Order.doc | DOC document | |
| MD10001 Wage Determination.pdf | ||
| SOW Supply Building Repairs.doc | DOC document | |
| SSA-RFP-10-1039.doc | DOC document | |
| Solicitation Cover Sheet.pdf | ||
| Reference Documents.doc | DOC document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
First Task Order Project
Updated Statement of Work
Supply Building Ceiling Repairs
Work Location
Supply Building Social Security Administration
6401 Security Blvd
Woodlawn, Md. 21235
Introduction
The purpose of this Statement of Work is to provide information and to request services to successfully complete the project described herein.
Objective The objective of this scope of work is to have the Term Contractor renovate the Supply Loading Dock Ceiling area. This includes installation of a new ceiling and hot water heaters.
Scope The contractor shall supply all labor, supervision, and material to achieve the project listed below.
DEMO
· Remove old hot water unit heaters (8) Trane Model #UHSA-038S-8A-ACC Unit water heaters, rating 4450 CFM, 15MCH/HV/Heaters – Hot Water
· Remove eight (8) old electrical circuits and thermostats.
INSTALL
· Install new hot water unit heaters (8) Trane Model #UHSE-038S-8A-ACC Unit water heaters, rating 4450 CFM, 15MCH/HV/Heaters – Hot Water OR Equal. Any elbows, couplings, unions, etc where the heaters connect to the main piping shall be replaced.
· Install eight (8) new thermostats that are recommended per manufacturer for the heaters mentioned above. See attached print for location.
· Install new R19 insulation in ceiling. Approximately-7000 square feet.
· Install 20 gauge studs and track in between existing main ceiling beam area. Size of the area is approximately 6’ X 22’, there are 22 total.
· Install new one layer of 5/8” fire rated sheetrock to be flush with the existing beams that go across bay areas, tape, finish and paint Approximately-7,000 square feet.
· Remove 30 existing lights and reinstall after ceiling is installed.
· Lights must go back onto the ceiling after installing drywall. Only take out lights when ready to install drywall.
· Install 42 access panels 18” X 18” where the lighting feeds come through deck above.
· Painting will be one coat of primer and two finish coats of Latex paint Duron Ice White. Semi gloss.
· The existing deck above is 6” to 8” from the concrete floor. There is 4” of rigid insulation on the ceiling now. You might have to cut some away for any new anchors.
Responsibility The contractor shall follow all in-house, OSHA safety requirements while working at SSA. The contractor is responsible for removing all debris from Supply Building related to this project.
All material must be approved by SSA OEHOS.
Working Hours All work shall be performed after normal duty hours- Monday through Friday 6:00pm to 6:00am. The number of loading dock bays to be worked on will be limited to two (2) bays at a time.
Period of Performance 90 days from the notice to proceed. SSA will have to release a schedule 5 weeks before project can start.