SOW Supply Building Repairs.doc
DOC document 33 KB Posted
- Solicitation number
- SSA-RFP-10-1039
- Issued by
-
Social Security Administration
About this file
Attachment D-SOW 1st Task Order
View the file
Other files
| File | Type | Posted |
|---|---|---|
| loading dock ceiling-Model.jpg | JPG image | |
| Answers to Site Visit Questions.doc | DOC document | |
| SOW Supply Building Repairs-Revised.doc | DOC document | |
| Pre Proposal Conference Notes.pdf | ||
| Amendment 3 Cover Sheet.pdf | ||
| Answers to Site Visit Questions 2.doc | DOC document | |
| Amendment 1 Cover Sheet.pdf | ||
| PostAward Documents.doc | DOC document | |
| MD100037 Wage Determination.pdf | ||
| RFTOP-1st Task Order.doc | DOC document | |
| MD10001 Wage Determination.pdf | ||
| SSA-RFP-10-1039.doc | DOC document | |
| Solicitation Cover Sheet.pdf | ||
| Reference Documents.doc | DOC document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
First Task Order Project
Statement of Work
Supply Building Ceiling Repairs
Work Location
Supply Building Social Security Administration
6401 Security Blvd
Woodlawn, Md. 21235
Introduction
The purpose of this Statement of Work is to provide information and to request services to successfully complete the project described herein.
Objective The objective of this scope of work is to have the Term Contractor renovate the Supply Loading Dock Ceiling area. This includes installation of a new ceiling and hot water heaters.
Scope The contractor shall supply all labor, supervision, and material to achieve the project listed below.
DEMO
· Remove old hot water unit heaters (14) Model #-HC Horizontal Delivery Heaters, HSB24/HC24; 1/25HP.
· Remove old connections at heaters as needed (elbows, unions, couplings, etc.)
· Remove four (4) old electrical circuits and thermostats.
INSTALL
· Install new hot water unit heaters (14) HC Horizontal Delivery Heaters, HSB24/HC24 or equivalent with 1/25HPand 24,000 BTUH/hot water.
· Install new connections as needed (elbows, unions, couplings etc).
· Install four (4) new EMT, electrical circuits, and thermostats. Electrical Circuits are 115vac. Existing circuits to be used where possible. The thermostats are 115vac, electronic programmable setback thermostats.
· Install new R11 insulation in ceiling. Approximately-6,000 square feet.
· Install ceiling grid channel for new sheet rock
· Install new sheetrock, tape, and paint Approximately-6,000 square feet.
Responsibility The contractor shall follow all in-house, OSHA safety requirements while working at SSA. The contractor is responsible for removing all debris from Supply Building related to this project.
All material must be approved by SSA OEHOS.
Working Hours All work will be performed after normal duty hours- Monday through Friday 6:00pm to 6:00am. The number of loading dock bays to be worked on will be limited to 2 bays at a time.
Period of Performance 90 days from the notice to proceed. SSA will have to release a schedule 5 weeks before project can start.