SOW Supply Building Repairs.doc

DOC document 33 KB Posted

Attached to
Multiple Award IDIQ General Construction Contracts
Solicitation number
SSA-RFP-10-1039
Issued by

About this file

Attachment D-SOW 1st Task Order

View the file

Other files

File Type Posted
loading dock ceiling-Model.jpg JPG image
Answers to Site Visit Questions.doc DOC document
SOW Supply Building Repairs-Revised.doc DOC document
Pre Proposal Conference Notes.pdf PDF
Amendment 3 Cover Sheet.pdf PDF
Answers to Site Visit Questions 2.doc DOC document
Amendment 1 Cover Sheet.pdf PDF
PostAward Documents.doc DOC document
MD100037 Wage Determination.pdf PDF
RFTOP-1st Task Order.doc DOC document
MD10001 Wage Determination.pdf PDF
SSA-RFP-10-1039.doc DOC document
Solicitation Cover Sheet.pdf PDF
Reference Documents.doc DOC document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

First Task Order Project

Statement of Work

Supply Building Ceiling Repairs

Work Location

Supply Building Social Security Administration

6401 Security Blvd

Woodlawn, Md. 21235

Introduction

The purpose of this Statement of Work is to provide information and to request services to successfully complete the project described herein.

Objective The objective of this scope of work is to have the Term Contractor renovate the Supply Loading Dock Ceiling area. This includes installation of a new ceiling and hot water heaters.

Scope The contractor shall supply all labor, supervision, and material to achieve the project listed below.

DEMO

· Remove old hot water unit heaters (14) Model #-HC Horizontal Delivery Heaters, HSB24/HC24; 1/25HP.

· Remove old connections at heaters as needed (elbows, unions, couplings, etc.)

· Remove four (4) old electrical circuits and thermostats.

INSTALL

· Install new hot water unit heaters (14) HC Horizontal Delivery Heaters, HSB24/HC24 or equivalent with 1/25HPand 24,000 BTUH/hot water.

· Install new connections as needed (elbows, unions, couplings etc).

· Install four (4) new EMT, electrical circuits, and thermostats. Electrical Circuits are 115vac. Existing circuits to be used where possible. The thermostats are 115vac, electronic programmable setback thermostats.

· Install new R11 insulation in ceiling. Approximately-6,000 square feet.

· Install ceiling grid channel for new sheet rock

· Install new sheetrock, tape, and paint Approximately-6,000 square feet.

Responsibility The contractor shall follow all in-house, OSHA safety requirements while working at SSA. The contractor is responsible for removing all debris from Supply Building related to this project.

All material must be approved by SSA OEHOS.

Working Hours All work will be performed after normal duty hours- Monday through Friday 6:00pm to 6:00am. The number of loading dock bays to be worked on will be limited to 2 bays at a time.

Period of Performance 90 days from the notice to proceed. SSA will have to release a schedule 5 weeks before project can start.