PostAward Documents.doc

DOC document 32 KB Posted

Attached to
Multiple Award IDIQ General Construction Contracts
Solicitation number
SSA-RFP-10-1039
Issued by

About this file

Attachment C-Post Award Certifications

View the file

Other files

File Type Posted
loading dock ceiling-Model.jpg JPG image
Answers to Site Visit Questions.doc DOC document
SOW Supply Building Repairs-Revised.doc DOC document
Pre Proposal Conference Notes.pdf PDF
Amendment 3 Cover Sheet.pdf PDF
Answers to Site Visit Questions 2.doc DOC document
Amendment 1 Cover Sheet.pdf PDF
MD100037 Wage Determination.pdf PDF
RFTOP-1st Task Order.doc DOC document
MD10001 Wage Determination.pdf PDF
SOW Supply Building Repairs.doc DOC document
SSA-RFP-10-1039.doc DOC document
Solicitation Cover Sheet.pdf PDF
Reference Documents.doc DOC document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C - POST AWARD CERTIFICATION

POSTAWARD CERTIFICATIONS

THE CONTRACTOR SHALL COMPLETE THIS CHECKLIST AND FORWARD IT TO THE

CONTRACTING OFFICER WITHIN 30 CALENDAR DAYS FOLLOWING AWARD OF THE

CONTRACT.

PRIVATE

REQUIREMENT

HAS

COMPLIED

(provide date)

HAS NOT

COMPLIED

Contractor has in place a Personal Protective Equipment (PPE) program and all employees have been trained and certified as required by Title 29 CFR 1910.132-.138 *

Contractor has in place a Hazard Communication Program and all employees have been trained and certified as required by Title 29 CFR 1910.1200

Contractor has in place a Hazardous Energy Source Control (Lockout/Tagout) program and all employees have been trained and certified as required by Title 29 CFR 1910.147

Contractor employees and/or subcontractors have been completed, as required by Title 29 CFR 1926.1101: 1) Asbestos Awareness Training, and 2) if asbestos abatement is required, Operations and Maintenance Training.

In accordance with 29 CFR 1910.269(b)(1), personnel shall be trained in CPR/First Aid if they are performing work on, or associated with, 50 volts or more

Contractor has in place a hearing conversation program and has trained all employees as required by Title 29 CFR 1910.95

For any requirement for which the Contractor does not immediately comply, the Contractor may provide information which would indicate a plan to put the program in place and/or provide the required training. If any such plan is accepted by the Government, the Contractor shall be expected to comply with the requirement within 30 calendar days following submission of the checklist.

CERTIFIED TO BE TRUE AND ACCURATE

Printed Name and Title

Signature/Date

*CFR - Code of Federal Regulation

PAGE

File details come from the government source that posted it. Updated .