This is a federal specification and procurement document for specialty control valves, identified as RQ-2025-0633. The procurement requires 6-inch and 8-inch nominal pipe size globe-style control valves designed for flow routing and blocking service. The valves must be ANSI 1500 Class with flat-faced flanges compliant with ASME B16.5, feature an in-line straight-through venturi flow design with a spherical ball control element contained by a cage, and include a diverging nozzle for flow control. Construction materials must be Type 316 stainless steel or equivalent, suitable for compressed air service at 1250°F maximum and 750 psia pressure with a maximum flow of 30 pounds per second and 1 psig maximum pressure drop. Valves must be compatible with Limitorque Series MX-20 and MX-40 actuators, warrantied for 12 months post-installation or 18 months post-shipment, and suitable for adjoining Schedule 120 pipe.
Valve testing must comply with ANSI/FCI 70-2 Control Valve Seat Leakage standards, requiring bubble-tight seating for five minutes when pressure is applied to the valve body cavity and alternately to each end, with the valve fully stroked open-to-close between three consecutive tests. All proposed valves must meet ASME B16.5, B16.10, and B16.34, as well as FCI 70-2, ANSI/ISA 75.01, ISA 75.08.01, and MSS SP-25 standards. Payment is based on completed delivery of purchased materials in accordance with drawings and specifications at respective contract unit prices. Government approval is required for SD-06 Test Reports (Valve Testing) submittal classification, with documentation to be provided to the Contracting Officer Representative.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW - Specialty Control Valves.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RQ-2025-0633 SPECIALTY CONTROL VALVE
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 42 00 05/24 SOURCES FOR REFERENCE PUBLICATIONS
DIVISION 40 - PROCESS INTERCONNECTIONS
40 05 13 10/07, CHG 2: 02/20 PIPELINES, LIQUID PROCESS PIPING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION 01 33 00
SUBMITTAL PROCEDURES
08/18, CHG 4: 02/21
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Submittal Descriptions (SD)
Submittal requirements are specified in the technical sections. Examples and descriptions of submittals identified by the Submittal Description (SD) numbers and titles follow:
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. Unless specified in another section, testing must have been within three years of date of contract award for the project.
Report that includes findings of a test required to be performed on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report that includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Final acceptance test and operational test procedure
1.1.2 Work
As used in this section, on-site and off-site construction required by contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction. In exception, excludes work to produce SD-01 submittals.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
1.3 SUBMITTAL CLASSIFICATION
1.3.1 Government Approved (G)
Within the terms of the Contract Clause SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION, submittals are considered to be "shop drawings."
SECTION 01 33 00 Page 2
1.3.2 For Information Only
Submittals not requiring Government approval will be for information only. Within the terms of the Contract Clause SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION, they are not considered to be "shop drawings."
1.4 PREPARATION
1.4.1 Transmittal Form
1.4.2 Submittal Format
1.4.2.1 Format of SD-01 Preconstruction Submittals
When the submittal includes a document that is to be used in the project, or is to become part of the project record, other than as a submittal, do not apply the Contractor's approval stamp to the document itself, but to a separate sheet accompanying the document.
Provide data in the unit of measure used in the contract documents.
1.4.2.2 Format for SD-02 Shop Drawings
Provide shop drawings not less than 8 1/2 by 11 inches nor more than 30 by 42 inches , except for full-size patterns or templates. Prepare drawings to accurate size, with scale indicated, unless another form is required.
Ensure drawings are suitable for reproduction and of a quality to produce clear, distinct lines and letters, with dark lines on a white background.
a. Include the nameplate data, size, and capacity on drawings. Also include applicable federal, military, industry, and technical society publication references.
b. Dimension drawings, except diagrams and schematic drawings. Prepare drawings demonstrating interface with other trades to scale. Use the same unit of measure for shop drawings as indicated on the contract drawings. Identify materials and products for work shown.
1.4.2.2.1 Drawing Identification
Include on each drawing the drawing title, number, date, and revision numbers and dates, in addition to information required in paragraph
IDENTIFYING SUBMITTALS.
Number drawings in a logical sequence. Each drawing is to bear the number of the submittal in a uniform location next to the title block. Place the Government contract number in the margin, immediately below the title block, for each drawing.
1.4.2.3 Format of SD-03 Product Data
Present product data submittals for each section. Include a table of contents, listing the page and catalog item numbers for product data.
SECTION 01 33 00 Page 3
Indicate, by prominent notation, each product that is being submitted;
indicate the specification section number and paragraph number to which it pertains.
1.4.2.3.1 Product Information
Supplement product data with material prepared for the project to satisfy the submittal requirements where product data does not exist. Identify this material as developed specifically for the project, with information and format as required for submission of SD-07 Certificates.
Provide product data in units used in the Contract documents. Where product data are included in preprinted catalogs with another unit, submit the dimensions in contract document units, on a separate sheet.
1.4.2.3.2 Standards
Where equipment or materials are specified to conform to industry or technical-society reference standards of such organizations as the American National Standards Institute (ANSI), ASTM International (ASTM), National Electrical Manufacturer's Association (NEMA), Underwriters Laboratories (UL), or Association of Edison Illuminating Companies (AEIC), submit proof of such compliance. The label or listing by the specified organization will be acceptable evidence of compliance. In lieu of the label or listing, submit a certificate from an independent testing organization, competent to perform testing, and approved by the Contracting Officer. State on the certificate that the item has been tested in accordance with the specified organization's test methods and that the item complies with the specified organization's reference standard.
1.4.2.4 Format of SD-05 Design Data
Provide design data and certificates on 8 1/2 by 11 inch paper.
1.4.2.5 Format of SD-06 Test Reports
By prominent notation, indicate each report in the submittal. Indicate the specification number and paragraph number to which each report pertains.
1.4.2.6 Format of SD-07 Certificates
Provide design data and certificates on 8 1/2 by 11 inch paper.
1.5 INFORMATION ONLY SUBMITTALS
Submittals without a "G" designation must be certified by the QC manager and submitted to the Contracting Officer for information-only. Provide information-only submittals to the Contracting Officer a minimum of 14 calendar days prior to the Preparatory Meeting for the associated Definable Feature of Work (DFOW). Approval of the Contracting Officer is not required on information only submittals. The Contracting Officer will mark "receipt acknowledged" on submittals for information and will return only the transmittal cover sheet to the Contractor. Normally, submittals for information only will not be returned. However, the Government reserves the right to return unsatisfactory submittals and require the Contractor to resubmit any item found not to comply with the contract.
This does not relieve the Contractor from the obligation to furnish
SECTION 01 33 00 Page 4 material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.
1.6 VARIATIONS
Variations from contract requirements require Contracting Officer approval pursuant to contract Clause FAR 52.236-21 Specifications and Drawings for Construction, and will be considered where advantageous to the Government.
1.6.1 Considering Variations
Discussion of variations with the Contracting Officer before submission of a variation submittal will help ensure that functional and quality requirements are met and minimize rejections and resubmittals. For variations that include design changes or some material or product substitutions, the Government may require an evaluation and analysis by a licensed professional engineer hired by the contractor.
Specifically point out variations from contract requirements in a transmittal letter. Failure to point out variations may cause the Government to require rejection and removal of such work at no additional cost to the Government.
1.6.2 Proposing Variations
When proposing variation, deliver a submittal, clearly marked as a "VARIATION" to the Contracting Officer, with documentation illustrating the nature and features of the variation including any necessary technical submittals and why the variation is desirable and beneficial to Government. If lower cost is a benefit, also include an estimate of the cost savings. In addition to documentation required for variation, include the submittals required for the item. Clearly mark the proposed variation in all documentation.
Specifically point out variations from contract requirements in a transmittal letter. Failure to point out variations may cause the Government to require rejection and removal of such work at no additional cost to the Government.
1.6.3 Warranting that Variations are Compatible
When delivering a variation for approval, the Contractor warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.
1.6.4 Review Schedule Extension
In addition to the normal submittal review period, a period of 14 days will be allowed for the Government to consider submittals with variations.
SECTION 01 33 00 Page 5
1.7 GOVERNMENT APPROVING AUTHORITY
When the approving authority is the Contracting Officer, the Government will:
a. Note the date on which the submittal was received.
b. Review submittals for approval within the scheduling period specified and only for conformance with project design concepts and compliance with contract documents.
c. Identify returned submittals with one of the actions defined in paragraph REVIEW NOTATIONS and with comments and markings appropriate for the action indicated.
Upon completion of review of submittals requiring Government approval, stamp and date submittals. Two copies of the submittal will be retained by the Contracting Officer and two copies of the submittal will be returned to the Contractor.
1.7.1 Review Notations
Submittals will be returned to the Contractor with the following notations:
a. Submittals marked "approved" or "accepted" authorize proceeding with the work covered.
b. Submittals marked "approved as noted" or "approved, except as noted, resubmittal not required," authorize proceeding with the work covered provided that the Contractor takes no exception to the corrections.
c. Submittals marked "not approved," "disapproved," or "revise and resubmit" indicate incomplete submittal or noncompliance with the contract requirements or design concept. Resubmit with appropriate changes. Do not proceed with work for this item until the resubmittal is approved.
d. Submittals marked "not reviewed" indicate that the submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.
e. Submittals marked "receipt acknowledged" indicate that submittals have been received by the Government. This applies only to "information-only submittals" as previously defined.
1.8 DISAPPROVED SUBMITTALS
Make corrections required by the Contracting Officer. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications, give notice to the Contracting Officer as required under the FAR clause titled CHANGES. The Contractor is responsible for the dimensions and design of connection details and the construction of work. Failure to point out variations may cause the Government to require rejection and removal of such work at the Contractor's expense.
SECTION 01 33 00 Page 6
If changes are necessary to submittals, make such revisions and resubmit in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.
1.9 APPROVED SUBMITTALS
The Contracting Officer's approval of submittals is not to be construed as a complete check, and indicates only that
Approval or acceptance by the Government for a submittal does not relieve the Contractor of the responsibility for meeting the contract requirements or for any error that may exist, because under the Quality Control (QC) requirements of this contract, the Contractor is responsible for ensuring information contained with in each submittal accurately conforms with the requirements of the contract documents.
After submittals have been approved or accepted by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.
1.10 APPROVED SAMPLES
Approval of a sample is only for the characteristics or use named in such approval and is not be construed to change or modify any contract requirements. Before submitting samples, provide assurance that the materials or equipment will be available in quantities required in the project. No change or substitution will be permitted after a sample has been approved.
Match the approved samples for materials and equipment incorporated in the work. If requested, approved samples, including those that may be damaged in testing, will be returned to the Contractor, at its expense, upon completion of the contract. Unapproved samples will also be returned to the Contractor at its expense, if so requested.
Failure of any materials to pass the specified tests will be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make as that material. The Government reserves the right to disapprove any material or equipment that has previously proved unsatisfactory in service.
Samples of various materials or equipment delivered on the site or in place may be taken by the Contracting Officer for testing. Samples failing to meet contract requirements will automatically void previous approvals. Replace such materials or equipment to meet contract requirements.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 01 33 00 Page 7
SECTION 01 33 00 Page 8
SECTION 01 42 00
SOURCES FOR REFERENCE PUBLICATIONS
05/24
PART 1 GENERAL
1.1 REFERENCES
Various publications are referenced in other sections of the specifications to establish requirements for the work. These references are identified in each section by document number, date and title. The document number used in the citation is the number assigned by the standards producing organization (e.g., ASTM B564 Standard Specification for Nickel Alloy Forgings). However, when the standards producing organization has not assigned a number to a document, an identifying number has been assigned for reference purposes.
1.2 ORDERING INFORMATION
The addresses of the standards publishing organizations whose documents are referenced in other sections of these specifications are listed below, and if the source of the publications is different from the address of the sponsoring organization, that information is also provided.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
1899 L Street, NW,11th Floor Washington, DC 20036 Ph: 202-293-8020 Fax: 202-293-9287 E-mail: info@ansi.org Internet: https://www.ansi.org/
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
Two Park Avenue New York, NY 10016-5990 Ph: 800-843-2763 Fax: 973-882-1717 E-mail: customercare@asme.org Internet: https://www.asme.org/
FLUID CONTROLS INSTITUTE (FCI)
1300 Sumner Avenue Cleveland, OH 44115 Ph: 216-241-7333 Fax: 216-241-0105 E-mail: fci@fluidcontrolsinstitute.org Internet: https://fluidcontrolsinstitute.org/
INTERNATIONAL SOCIETY OF AUTOMATION (ISA)
67 T.W. Alexander Drive PO Box 12277 Research Triangle Park, NC 27709 Ph: 919-549-8411 Fax: 919-549-8288 E-mail: info@isa.org
SECTION 01 42 00 Page 9
Internet: https://www.isa.org/
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
127 Park Street, NE Vienna, VA 22180-4602 Ph: 703-281-6613 E-mail: info@msshq.org Internet: http://msshq.org
PART 2 PRODUCTS
Not used
PART 3 EXECUTION
Not used
SECTION 01 42 00 Page 10
SECTION 40 05 13
PIPELINES, LIQUID PROCESS PIPING
10/07, CHG 2: 02/20
PART 1 GENERAL
1.1 UNIT PRICES
Measurement and payment will be based on completed delivery of the purchased materials in accordance with the drawings and specifications .
1.1.1 Measurement
1.1.2 Payment
Payment for valves and other appurtenances will be made at the respective contract unit price for each item delivered complete in place. Payment will include the furnishing of all specified material scontract , as indicated and as shown in contract documents.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME B16.5 (2020) Pipe Flanges and Flanged Fittings NPS 1/2 Through NPS 24 Metric/Inch Standard
ASME B16.10 Face-To-Face and End-To-End Dimensions of Valves
ASME B16.34 (2021) Valves - Flanged, Threaded and Welding End
FLUID CONTROLS INSTITUTE (FCI)
FCI 70-2 (2021) Control Valve Seat Leakage
INTERNATIONAL SOCIETY OF AUTOMATION (ISA)
ISA 75.01 Flow Equations for Sizing Control Valves
ISA 75.08.01 Face-to-Face Dimensions for Flanged Globe-Style Control Valve Bodies
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
MSS SP-25 (2018) Standard Marking System for Valves, Fittings, Flanges and Unions
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S"
SECTION 40 05 13 Page 11 classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-06 Test Reports
Valve Testing ; G
PART 2 PRODUCTS
2.1 VALVES
2.1.1 General Requirements For Valves
Valves , in the context of this procurement, means the valve body and internal components. The procurement process for these specialty control valves does not include operator, actuator, handwheel, chain wheel, extension stem, floor stand, worm and gear operator, operating nut, chain, wrench, and all other accessories required for a complete operation.
Ensure valves are suitable for the intended service. Renewable parts are not to be of a lower quality than those specified. Provide valves that are the same size as adjoining pipe. Ensure valve ends are compatible with adjacent piping system.
2.1.2 Specialty Control Valves
2.1.2.1 General Requirements for Specialty Control Valves
(1) Provide a specialty control valve of 6-inch and 8-inch nominal pipe size, that are of globe style with the following attributes, with quatities to be determined at purchase:
(a) Valve shall be designed for flow routing(blocking)service.
(b) Valve shall be ANSI 1500 Class with flat-faced flanges as specified in ASME B16.5 - Steel Pipe Flanges.
(c) Both valves shall have flange face-to-face dimensions meeting the requirements of ASME B16.10 Face-To-Face and End-To-End Dimensions of Valves.
(d) Valves shall be an in-line straight-thru venturi flow design.
(e) The control element, a spherical ball, is to be contained by a cage that positions the ball relative to the downstream seat by means of linear stem travel (rising stem).
SECTION 40 05 13 Page 12
(f) Design shall control exit flow via a diverging nozzle, which controls the expansion and recovery to eliminate turbulence to the flow stream.
(g) Valves must be compatible with Limitorque Series MX-20 (for 6-inch valve) and MX-40 (for 8-inch) actuators for rising stem valves.
(h) The valve body and bonnet shall be Type 316 stainless steel or equivalent alloy suitable for operation with compressed air service conditions in 40 05 13 Subpart 2.1.2.2 Operating Conditions.
(i) Valve internal wear-components must be suitable for the operational conditions in 40 05 13 Subpart 2.1.2.2 Operating Conditions and include features such as hardened or stellite seats to prevent premature wear failure.
(j) Valves shall be suitable for adjoining Schedule 120 pipe.
(k) Valves shall be warrantied against defect for a period of 12 months following installation or 18 months after shipment, whichever occurs first.
2.1.2.2 Operating Conditions
(1) Valve shall be designed for the following service conditions:
(a) Compressed air,
(b) 1250 °F maximum,
(c) 750 psia service,
(d) 30 pounds per second (#/sec) maximum flow,
(e) a maximum pressure drop of 1 psig at maximum flow.
2.1.2.3 Applicable Standards and Specifications
All proposed valves shall meet the requirements of the following published industry standards for design, construction, operation and testing as a minimum.
(1) ASME B16.5 - Pipe Flanges & Flanged Fittings
(2) ASME B16.10 - Face to Face & End to End Dimensions of Valves
(3) ASME B16.34 - Valves - Flanged, Threaded & Welding Ends
(4) FCI 70-2 Control Valve Seat Leakage Testing
(5) ANSI/ ISA 75.01 - Flow Equations for Sizing Control Valves
SECTION 40 05 13 Page 13
(6) ANSI/ ISA 75.08.01 Face-to-Face Dimensions for Flanged Globe-Style Control Valve Bodies
(7) MSS SP-25 - Standard Marking System for Valves, Fittings, Flanges & Unions (ANSI-approved American National Standard)
2.1.2.4 Valve Testing
(1) The valve testing process shall meet the requirements of ANSI/FCI 70-2 Control Valve Seat Leakage as summarized below.
(2) Leak testing of the valve shall be conducted at ambient temperature using a gas at a pressure equal to the ANSI pressure rating of the valve at the design temperature.
(3) Pressure is to be applied in the valve body cavity and alternately in each end of the valve with the valve position closed and water filling the open end.
(4) The seat of the valve shall be bubble tight for a period of not less than five minutes.
(5) The test shall be conducted three times.
(6) The valve shall be fully stroked open-to-close between each of the three tests.
(7) Each valve shall meet the Class V leak requirements in ANSI/ FCI 70-2 Control Valve Seat Leakage, as set forth in 40 05 13 Subpart 2.1.2.3 (4).
(8) The valve testing results shall be documented and provided to the Contracting Officer Representative.
SECTION 40 05 13 Page 14
PART 3 EXECUTION
SECTION 40 05 13 Page 15
SPECIALTY CONTROL VALVE RQ20250633
July 31, 2025 2:30 PM
ADDRESS VERIFICATION REPORT
This report lists any Reference Organization that appears in a Section Reference Article without a corresponding listing in either the Sources for Reference Publications Section (01 42 00, 01420, or 01090) or the Supplemental Reference List.
HINT: With this file opened as a report from the SI Processed Files folder, double-clicking a Section number will open the Section in the Editor.
SECTION REFERENCE ORGANIZATION
ALL REFERENCE ADDRESSES HAVE BEEN VERIFIED
Address Verification Report
BRACKET VERIFICATION REPORT
This report lists all brackets remaining in the text.
HINT: With this file opened as a report from the SI Processed Files folder, double-clicking a Section number will open the Section in the Editor.
SECTION SUBPART BRACKETS EXPLANATORY NOTES
NO BRACKETS FOUND IN TEXT
Bracket Verification Report
REFERENCE VERIFICATION REPORT
Unresolved References
This report lists all References that appear in a Section, but that are not listed in either that Section's Reference Article or the Supplemental Reference List.
HINT: With this file opened as a report from the SI Processed Files folder, double-clicking a Section number will open the Section in the Editor.
SECTION SUBPART REFERENCE
ALL REFERENCES HAVE BEEN VERIFIED
Reference Verification Report
SECTION VERIFICATION REPORT
This report lists all Sections that are referenced in other Sections, but that are not in the Job or Master.
HINT: With this file opened as a report from the SI Processed Files folder, double-clicking a Section number will open the Section in the Editor.
SECTION SUBPART SECTION REFERENCED
ALL SECTIONS HAVE BEEN VERIFIED
Section Verification Report
SUBMITTAL VERIFICATION REPORT
Search for "Submittal Formatting Requirements" in SpecsIntact help for more information about the contents of this report.
Section Submittal Discrepancies
Sections that do not cite Submittal Items in both the Submittal Article and elsewhere in the text, that cite invalid Classifications, or that contain Submittal Descriptions, Classifications, or multiply-defined Submittal Items outside the Submittal Article:
HINT: With this file opened as a report from the SI Processed Files folder, double-clicking a Section number will open the Section in the Editor.
SECTION SUBPART SUBMITTAL DISCREPANCY
Discrepancies Between Submittal Articles and Submittal Procedures Section
Submittal Descriptions from Section Submittal Articles that differ from Descriptions in the Submittal Procedures Section (01 33 00, 01330, or 01300), or that are missing from the Submittal Procedures Section:
HINT: With this file opened as a report from the SI Processed Files folder, double-clicking a Section number will open the Section in the Editor.
STANDARD DESCRIPTION
SECTION SUBPART INVALID DESCRIPTION
All the Submittal Descriptions in Sections processed match.
Submittal Verification Report
REFERENCE TITLE REPORT
This report lists Reference Identifiers with conflicting Reference Titles in two or more Section Reference Articles.
HINT: With this file opened as a report from the SI Processed Files folder, double-clicking a Section number will open the Section in the Editor.
SECTION REFERENCE REFERENCE TITLE
ALL REFERENCES HAVE BEEN VERIFIED
Reference Title Report
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 1 PAGES
SPECIALTY CONTROL VALVE
40 05 13 2.1.2.4 GValve Testing
2.1.2.4 GValve Testing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
| PUBLISH.pdf |
| ADDRVER.pdf |
| BRKTVER.pdf |
| REFVER.pdf |
| SECTVER.pdf |
| SUBMVER.pdf |
| TTLDIFFS.pdf |
| REGISTER.pdf |
File details come from the government source that posted it. Updated .