SS4A_Terms_and_Conditions 2023_02_08.pdf
PDF 583 KB Posted
- Attached to
- 24-017 Safety Action Plan
- Solicitation number
- PE-66098-NONST-2024-000000013
- Issued by
- Fulton County, Georgia
About this file
This document contains the General Terms and Conditions for the Fiscal Year 2022 Safe Streets and Roads for All (SS4A) Grant Program administered by the United States Department of Transportation (USDOT) through the Federal Highway Administration (FHWA). The purpose of this program is to improve roadway safety by significantly reducing or eliminating roadway fatalities and serious injuries through safety action plan development or safety projects focused on all users. Key terms include recipient responsibilities, award amounts and obligations, reporting requirements, performance measurement, noncompliance and remedies, agreement termination, procurement requirements, and cost principles. The USDOT will provide Federal financial assistance to the selected recipients, who must meet Buy America, small and disadvantaged business, and other administrative requirements to complete the proposed safety projects within the specified period of performance.
The document also outlines additional terms related to environmental review, railroad coordination, relocation and property acquisition, and equipment disposition. Payments to the recipients are subject to limitations, liquidation of obligations, and availability of funds. The agreement can be modified bilaterally or unilaterally by the USDOT, and the USDOT maintains oversight, access to records, and the ability to impose remedies for noncompliance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24_017 Safety Action Plan.pdf | ||
| Appendix A Example Scope Crash Database Prepa.pdf | ||
| Addendum 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF TRANSPORTATION
GENERAL TERMS AND CONDITIONS UNDER THE
FISCAL YEAR 2022 SAFE STREETS AND ROADS FOR ALL (“SS4A”) GRANT
PROGRAM:
FHWA PROJECTS
Revision date: February 8, 2023
Table of Contents
Article 7 Purpose
7.1 Purpose
Article 8 USDOT Role
8.1 Division of USDOT Responsibilities
8.2 USDOT Program Contacts
Article 9 Recipient Role
9.1 Statements on the Project
9.2 Statements on Authority and Capacity
9.3 USDOT Reliance
9.4 Project Delivery
9.5 Rights and Powers Affecting the Project
9.6 Notification of Changes to Key Personnel
Article 10 Award Amount, Obligation, and Time Periods
10.1 Federal Award Amount
10.2 Federal Obligations
10.3 Budget Period
10.4 Period of Performance……...……………..……………………………………………………..9 Article 11 Statement of Work, Schedule, and Budget Changes
11.1 Notification Requirement
11.2 Statement of Work Changes…………………………………………………………………
11.3 Schedule Changes………………………………………………………………………………10
11.4 Budget Changes………………………………………………………………………………...10
11.5 USDOT Acceptance of Changes
Article 12 General Reporting Terms
12.1 Report Submission
12.2 Alternative Reporting Methods
12.3 Paperwork Reduction Act Notice
Article 13 Progress and Financial Reporting
13.1 Quarterly Project Progress Reports and Recertifications
13.2 Final Progress Reports and Financial Information
Article 14 Performance Reporting
14.1 Baseline Performance Measurement
14.2 Post-construction Performance Measurement
14.3 Project Outcomes Report
14.4 Performance Reporting Survival
14.5 Program Evaluation…………………………………………………………………………….13
Article 15 Noncompliance and Remedies
15.1 Noncompliance Determinations
15.2 Remedies
15.3 Other Oversight Entities
Article 16 Agreement Termination
16.1 USDOT Termination
16.2 Closeout Termination
16.3 Post-Termination Adjustments
16.4 Non-Terminating Events
16.5 Other Remedies
Article 17 Monitoring, Financial Management, Controls, and Records
17.1 Recipient Monitoring and Record Retention
17.2 Financial Records and Audits
17.3 Internal Controls
17.4 USDOT Record Access
Article 18 Contracting and Subawards
18.1 Build America, Buy America
18.2 Small and Disadvantaged Business Requirements
18.3 Engineering and Design Services
18.4 Foreign Market Restrictions
18.5 Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment. .. 20
18.6 Recipient Responsibilities for Subawards
18.7 Subaward and Contract Authorization
Article 19 Costs, Payments, and Unexpended Funds
19.1 Limitation of Federal Award Amount
19.2 Projects Costs
19.3 Timing of Project Costs
19.4 Recipient Recovery of Federal Funds
19.5 Unexpended Federal Funds
19.6 Timing of Payments to the Recipient
19.7 Payment Method………………………………………………………………………………..21
19.8 Information Supporting Expenditures
19.9 Reimbursement Frequency
Article 20 Liquidation, Adjustments, and Funds Availability
20.1 Liquidation of Recipient Obligations
Article 21 Agreement Modifications
21.1 Bilateral Modifications
21.2 Unilateral Contact Modifications
21.3 USDOT Unilateral Modifications
21.4 Other Modifications
Article 22 Climate Change and Environmental Justice
22.1 Climate Change and Environmental Justice
Article 23 Racial Equity and Barriers to Opportunity
23.1 Racial Equity and Barriers to Opportunity
Article 24 Federal Financial Assistance, Administrative, and National Policy Requirements
24.1 Uniform Administrative Requirements for Federal Awards
24.2 Federal Law and Public Policy Requirements
24.3 Federal Freedom of Information Act
24.4 History of Performance
24.5 Whistleblower Protection
24.6 External Award Terms and Obligations
24.7 Incorporated Certifications
Article 25 Assignment
25.1 Assignment Prohibited
Article 26 Waiver
26.1 Waivers
Article 27 Additional Terms and Conditions
27.1 Effect of Action Plan or Implementation Plan
27.2 Disclaimer of Federal Liability
27.3 Environmental Review
27.4 Railroad Coordination
27.5 Relocation and Real Property Acquisition……………………..………………………………..27
27.6 Equipment Disposition………………………………………………………………………...27
Article 28 Mandatory Award Information
28.1 Information Contained in a Federal Award
Article 29 Construction and Definitions
29.1 Attachments
29.2 Exhibits
29.3 Construction
29.4 Integration
29.5 Definitions
Article 30 Agreement Execution and Effective Date
30.1 Counterparts
30.2 Effective Date
Index of Definitions
Administering Operating Administration Environmental Review Entity………………………………………………………………… Federal Share
FHWA
NOFO
OMB
Program Statute Project……………………………………………………………………………………………19 Project Closeout SS4A Grant
USDOT
GENERAL TERMS AND CONDITIONS
The Infrastructure Investment and Jobs Act (Pub. L. 117–58, November 15, 2021; also referred to as the “Bipartisan Infrastructure Law” or “BIL”) established the Safe Streets and Roads for All (SS4A) Discretionary Grant Program (BIL Section 24112) and appropriated funds to the United States Department of Transportation (the “USDOT”) under Division J, Title VIII of BIL to implement the program. The funds are available to provide Federal financial assistance to support local initiatives to prevent death and serious injury on roads and streets, commonly referred to as “Vision Zero” or “Toward Zero Deaths” initiatives.
The USDOT published a Notice of Funding Opportunity (the “NOFO”) to solicit applications for Federal financial assistance in Fiscal Year 2022 for the SS4A Discretionary Grant Program (87 Fed. Reg. 31606 (May 24, 2022; subsequently amended in 87 Fed. Reg.
47818 on August 4, 2022)).
These general terms and conditions are incorporated by reference in a project-specific grant agreement under the fiscal year 2022 SS4A grant program. Articles 1–6 are in the project-specific portion of the agreement. The term “Recipient” is defined in the project-specific portion of the agreement. Attachments A through D are project-specific attachments.
ARTICLE 7
PURPOSE
7.1 Purpose. The purpose of this award is to improve roadway safety by significantly reducing or eliminating roadway fatalities and serious injuries through safety action plan development or projects focused on all users, including pedestrians, bicyclists, public transportation users, motorists, personal conveyance and micromobility users, and commercial vehicle operators. The parties will accomplish that purpose by achieving the following objectives:
(1) timely completing the Project; and
(2) ensuring that this award does not substitute for non-Federal investment in the Project, except as proposed in the Grant Application, as modified by section 3.3 and Attachment B.
ARTICLE 8
USDOT ROLE
8.1 Division of USDOT Responsibilities.
(a) The Office of the Secretary of Transportation is ultimately responsible for the USDOT’s administration of the SS4A Grant Program.
(b) The Federal Highway Administration (the “FHWA”) will administer this grant agreement on behalf of the USDOT. In this agreement, the “Administering Operating Administration” means the FHWA.
8.2 USDOT Program Contacts.
FHWA Safe Streets and Roads for All Federal Highway Administration Office of Safety 1200 New Jersey Avenue SE HSA-1, Mail Drop E71-117 Washington, DC 20590 SS4A.FHWA@dot.gov
(202) 366-2201 and
[enter FHWA Division Office lead point of contact] [enter address] [enter email address] [enter telephone]
ARTICLE 9
RECIPIENT ROLE
9.1 Statements on the Project. The Recipient states that:
(1) all material statements of fact in the Grant Application were accurate when that application was submitted; and
(2) Attachment B documents all material changes in the information contained in that application.
9.2 Statements on Authority and Capacity. The Recipient states that:
(1) it has the authority to receive Federal financial assistance under this agreement;
(2) It has the legal authority to complete the Project, including either ownership and/or maintenance responsibilities over a roadway network; safety responsibilities that affect roadways; or has an agreement from the agency that has ownership and/or maintenance responsibilities for the roadway within the applicant’s jurisdiction; if applicable.
(3) it has the capacity, including institutional, managerial, and financial capacity, to comply with its obligations under this agreement;
(4) not less than the difference between the “Total Eligible Project Cost” and the “SS4A Grant Amount” listed in section 3.3 are committed to fund the Project;
(5) it has sufficient funds available, or an agreement with the agency that has ownership and/or maintenance responsibilities for the roadway within the recipient’s jurisdiction, to ensure that infrastructure completed or improved under this agreement will be operated and maintained in compliance with this agreement and applicable Federal law; and
(6) the individual executing this agreement on behalf of the Recipient has authority to enter this agreement and make the statements in this article 9 and in section 24.7 on behalf of the Recipient.
9.3 USDOT Reliance. The Recipient acknowledges that:
(1) the USDOT relied on statements of fact in the Grant Application to select the Project to receive this award;
(2) the USDOT relied on statements of fact in both the Grant Application and this agreement to determine that the Recipient and the Project are eligible under the terms of the NOFO;
(3) the USDOT relied on statements of fact in both the Grant Application and this agreement to establish the terms of this agreement; and
(4) the USDOT’s selection of the Project to receive this award prevented awards under the NOFO to other eligible applicants.
9.4 Project Delivery.
(a) The Recipient shall complete the Project under the terms of this agreement.
(b) The Recipient shall ensure that the Project is financed, constructed, operated, and maintained in accordance with all applicable Federal laws, regulations, and policies.
(c) The Recipient shall provide any certifications or assurances deemed necessary by the USDOT in ensuring the Recipient’s compliance with all applicable laws, regulations, and policies.
(d) The Recipient shall provide access to records as provided at 2 CFR 200.337.
9.5 Rights and Powers Affecting the Project.
(a) The Recipient shall not take or permit any action that deprives it of any rights or powers necessary to the Recipient’s performance under this agreement without written approval of the USDOT.
(b) The Recipient shall act, in a manner acceptable to the USDOT, promptly to acquire, extinguish, or modify any outstanding rights or claims of right of others that would interfere with the Recipient’s performance under this agreement.
9.6 Notification of Changes to Key Personnel. The Recipient shall notify all USDOT representatives who are identified in Section 4.4 in writing within 30 calendar days of any change in key personnel who are identified in Section 4.3.
ARTICLE 10
AWARD AMOUNT, OBLIGATION, AND TIME PERIODS
10.1 Federal Award Amount The USDOT hereby awards a SS4A Grant to the Recipient in the amount listed in Section 2.2 as the SS4A Grant Amount.
10.2 Federal Obligations.
This agreement obligates for the period of performance listed in section 2.3 of the grant agreement.
10.3 Budget Period
The budget period for this award begins on the date of this agreement and ends on the budget period end date that is listed in section 2.4, which shall be no later than 5 years from the date of grant execution. In this agreement, “budget period” is used as defined at 2 C.F.R. 200.1.
10.4 Period of Performance.
(a) The period of performance for this award begins on the effective date of award listed in page 1 item 2 and ends on the period of performance end date that is listed in Section 2.3.
(b) In this agreement, “period of performance” is used as defined at 2 C.F.R. 200.1.
ARTICLE 11
STATEMENT OF WORK, SCHEDULE, AND BUDGET CHANGES
11.1 Notification Requirement. The Recipient shall notify all USDOT representatives who are identified in section 4.4 in writing within 30 calendar days of any change in circumstances or commitments that adversely affect the Recipient’s plan to complete the Project. In that notification, the Recipient shall describe the change and what actions the Recipient has taken or plans to take to ensure completion of the Project. This notification requirement under this section 11.1 is separate from any requirements under this article 11 that the Recipient request amendment of this agreement.
11.2 Statement of Work Changes. If the Project’s activities differ from the statement of work that is described in section 3.1 and Attachment B, then the Recipient shall request an amendment of this agreement to update section 3.1.
11.3 Schedule Changes. If one or more of the following conditions are satisfied, then the Recipient shall request an amendment of this agreement to update the relevant dates:
(1) a substantial completion date for the Project or a component of the Project is listed in section 3.2 and the Recipient’s estimate for that milestone changes to a date that is more than six months after the date listed in section 3.2; or
(2) a schedule change would require the period of performance to continue after the period of performance end date listed in section 2.3.
For other schedule changes, the Recipient shall request an amendment of this agreement unless the USDOT has consented, in writing consistent with applicable requirements, to the change.
11.4 Budget Changes.
(a) The Recipient acknowledges that if the cost of completing the Project increases:
(1) that increase does not affect the Recipient’s obligation under this agreement to complete the Project; and
(2) the USDOT will not increase the amount of this award to address any funding shortfall.
(b) The Recipient shall request an amendment of this agreement to update section 3.3 and Attachment B if, in comparing the Project’s budget to the amounts listed in section 3.3:
(1) the “Non-Federal Funds” amount decreases; or
(2) the “Total Eligible Project Cost” amount decreases.
(c) For budget changes that are not identified in section 11.4(b), the Recipient shall request an amendment of this agreement to update section 3.3 and Attachment B unless the USDOT has consented, in writing consistent with applicable requirements, to the change.
(d) If the actual eligible project costs are less than the “Total Eligible Project Cost” that is listed in section 3.3, then the Recipient may propose to the USDOT, in writing consistent with applicable requirements, specific additional activities that are within the scope of this award, as defined in sections 7.1 and 3.1, and that the Recipient could complete with the difference between the “Total Eligible Project Cost” that is listed in section 3.3 and the actual eligible project costs.
(e) If the actual eligible project costs are less than the “Total Eligible Project Cost” that is listed in section 3.3 and either the Recipient does not make a proposal under section
11.4(d) or the USDOT does not accept the Recipient’s proposal under section 11.4(d), then:
(1) in a request under section 11.4(b), the Recipient shall reduce the Federal Share by the difference between the “Total Eligible Project Cost” that is listed in section
3.3 and the actual eligible project costs; and
(2) if that amendment reduces this award and the USDOT had reimbursed costs exceeding the revised award, the Recipient shall request to add additional project work that is within the scope of this project.
In this agreement, “Federal Share” means the sum of the “SS4A Action Plan or Implementation Grant Amount” and the “Other Federal Funds” amounts that are listed in section 3.3.
(f) The Recipient acknowledges that amounts that are required to be refunded under section 11.4(e)(2) constitute a debt to the Federal Government that the USDOT may collect under 2 C.F.R. 200.346 and the Federal Claims Collection Standards (31 C.F.R. parts 900–999).
11.5 USDOT Acceptance of Changes. The USDOT may accept or reject amendments requested under this article 11, and in doing so may elect to consider only the interests of the SS4A grant program and the USDOT. The Recipient acknowledges that requesting an amendment under this article 11 does not amend, modify, or supplement this agreement unless the USDOT accepts that amendment request and the parties modify this agreement under section 21.1.
ARTICLE 12
GENERAL REPORTING TERMS
12.1 Report Submission. The Recipient shall send all reports required by this agreement to all USDOT contacts who are listed in section 4.4. Reports will be added to a central repository maintained by FHWA.
12.2 Alternative Reporting Methods. FHWA may establish processes for the Recipient to submit reports required by this agreement, including electronic submission processes. If the Recipient is notified of those processes in writing, the Recipient shall use the processes required by the FHWA.
12.3 Paperwork Reduction Act Notice.
Under 5 C.F.R. 1320.6, the Recipient is not required to respond to a collection of information that does not display a currently valid control number issued by the Office of Management and Budget (the “OMB”). Collections of information conducted under this agreement are approved under OMB Control No. 2105-0520.
ARTICLE 13
PROGRESS AND FINANCIAL REPORTING
13.1 Quarterly Program Performance Reports. Quarterly, on or before the 20th day of the first month of each calendar year (e.g., reports due on or before January 20th, April 20th, August 20th, and December 20th) and until the end of the period of performance, the Recipient shall submit to the USDOT a Quarterly Project Progress Report in the format and with the content described in Exhibit C (SF-PPR). If the date of this agreement is in the final month of a calendar year, then the Recipient shall submit the first Quarterly Project Progress Report in the second calendar year that begins after the date of this agreement.
13.2 Quarterly Financial Status. Quarterly, on or before the 20th day of the first month of each calendar year, the Recipient shall submit a Federal Financial Report using SF-425.
ARTICLE 14
PERFORMANCE REPORTING
14.1 Baseline Performance Measurement. If the Designation in Section 2.5 is “Implementation,” then:
(1) the Recipient shall collect data for each performance measure that is identified in the Performance Measure Table in Attachment A, accurate as of the Baseline Measurement Date that is identified in Attachment A; and
(2) on or before the Baseline Report Date that is stated in Attachment A, the Recipient shall submit a Baseline Performance Measurement Report that contains the data collected under this section 14.1 and a detailed description of the data sources, assumptions, variability, and estimated levels of precision for each performance measure that is identified in the Performance Measure Table in Attachment A.
14.2 Section 24112(h) Report: The Recipient shall submit to the USDOT, not later than 120 days after the end of the period of performance, a report that describes, consistent with section 24112(g) of BIL:
(1) the costs of carrying out the project;
(2) the outcomes and benefits that each eligible project generated as identified in the grant application and measured by data to the maximum extent practicable (i.e.
number of fatalities and serious injuries that occurred within the limits of the project location); and
(3) the lessons learned, and any recommendations related to future projects or strategies to prevent death and serious injuries on roads and streets.
14.3 Performance Measurement Information.
For each performance measure that is identified in the Performance Measure Table in Attachment A, not later than January 31 of each year that follows a calendar year within the period of performance during which data was collected, the Recipient shall submit to the USDOT a Performance Measurement Report containing the data collected in the previous calendar year and stating the dates when the data was collected.
14.4 Performance Reporting Survival.
The data collection and reporting requirements in this article 14 survive the termination of this agreement which is three years post period of performance.
14.5 Program Evaluation.
As a condition of grant award, the recipient may be required to participate in an evaluation undertaken by USDOT, or another agency or partner. The evaluation may take different forms such as an implementation assessment across grant recipients, an impact and/or outcomes analysis of all or selected sites within or across grant recipients, or a benefit/cost analysis or assessment of return on investment. The Department may require applicants to collect data elements to aid the evaluation. As a part of the evaluation, as a condition of award, grant recipients must agree to: (1) make records available to the evaluation contractor;
(2) provide access to program records, and any other relevant documents to calculate costs and benefits; (3) in the case of an impact analysis, facilitate the access to relevant information as requested; and (4) follow evaluation procedures as specified by the evaluation contractor or USDOT staff.
ARTICLE 15
NONCOMPLIANCE AND REMEDIES
15.1 Noncompliance Determinations.
(a) If the USDOT determines that the Recipient may have failed to comply with the United States Constitution, Federal law, or the terms and conditions of this agreement, the USDOT may notify the Recipient of a proposed determination of noncompliance. For the notice to be effective, it must be written and the USDOT must include an explanation of the nature of the noncompliance, describe a remedy, state whether that remedy is proposed or effective at an already determined date, and describe the process through and form in which the Recipient may respond to the notice.
(b) If the USDOT notifies the Recipient of a proposed determination of noncompliance under section 15.1(a), the Recipient may, not later than 7 calendar days after the notice, respond to that notice in the form and through the process described in that notice. In its response, the Recipient may:
(1) accept the remedy;
(2) acknowledge the noncompliance, but propose an alternative remedy; or
(3) dispute the noncompliance.
To dispute the noncompliance, the Recipient must include in its response documentation or other information supporting the Recipient’s compliance.
(c) The USDOT may make a final determination of noncompliance only:
(1) after considering the Recipient’s response under section 15.1(b); or
(2) if the Recipient fails to respond under section 15.1(b), after the time for that response has passed.
(d) To make a final determination of noncompliance, the USDOT must provide a notice to the Recipient that states the bases for that determination.
15.2 Remedies.
(a) If the USDOT makes a final determination of noncompliance under section 15.1(d), the USDOT may impose a remedy, including:
(1) additional conditions on the award;
(2) any remedy permitted under 2 C.F.R. 200.339–200.340, including withholding of payments; disallowance of previously reimbursed costs, requiring refunds from the Recipient to USDOT; suspension or termination of the award; or suspension and disbarment under 2 C.F.R. part 180; or
(3) any other remedy legally available.
(b) To impose a remedy, the USDOT must provide a written notice to the Recipient that describes the remedy, but the USDOT may make the remedy effective before the Recipient receives that notice.
(c) If the USDOT determines that it is in the public interest, the USDOT may impose a remedy, including all remedies described in section 15.2(a), before making a final determination of noncompliance under section 15.1(d). If it does so, then the notice provided under section 15.1(d) must also state whether the remedy imposed will continue, be rescinded, or modified.
(d) In imposing a remedy under this section 15.2 or making a public interest determination under section 15.2(c), the USDOT may elect to consider the interests of only the
USDOT.
(e) The Recipient acknowledges that amounts that the USDOT requires the Recipient to refund to the USDOT due to a remedy under this section 15.2 constitute a debt to the
Federal Government that the USDOT may collect under 2 C.F.R. 200.346 and the Federal Claims Collection Standards (31 C.F.R. parts 900–999).
15.3 Other Oversight Entities.
Nothing in this article 15 limits any party’s authority to report activity under this agreement to the United States Department of Transportation Inspector General or other appropriate oversight entities.
ARTICLE 16
AGREEMENT TERMINATION
16.1 USDOT Termination.
(a) The USDOT may terminate this agreement and all of its obligations under this agreement if any of the following occurs:
(1) the Recipient fails to obtain or provide any non-SS4A Grant contribution (all eligible project costs other than the SS4A Grant Amount, as described in section
3.2 table (a) of the grant agreement) or alternatives approved by the USDOT as provided in this agreement and consistent with article 3;
(2) a construction start date for the Project or Strategy is listed in section 3.2 and the Recipient fails to meet that milestone by six months after the date listed in section 3.2;
(3) a substantial completion date for the Project or Strategy is listed in section 3.2 and the Recipient fails to meet that milestone by six months after the date listed in section 3.2;
(4) the Recipient fails to comply with the terms and conditions of this agreement, including a material failure to comply with the schedule in section 3.2 even if it is beyond the reasonable control of the Recipient; or,
(5) the USDOT determines that termination of this agreement is in the public interest.
(6) the Recipient fails to expend the funds within 5 years after the date on which the government executes the grant agreement, which is the date funds are provided for the project.
(b) In terminating this agreement under this section, the USDOT may elect to consider only the interests of the USDOT.
(c) This section 16.1 does not limit the USDOT’s ability to terminate this agreement as a remedy under section 15.2.
(d) The Recipient may request that the USDOT terminate the agreement under this section 16.1.
16.2 Closeout Termination.
(a) This agreement terminates on Project Closeout.
(b) In this agreement, “Project Closeout” means the date that the USDOT notifies the Recipient that the award is closed out. Under 2 C.F.R. 200.344, Project Closeout should occur no later than one year after the end of the period of performance.
16.3 Post-Termination Adjustments. The Recipient acknowledges that under 2 C.F.R.
200.345–200.346, termination of the agreement does not extinguish the USDOT’s authority to disallow costs, including costs that USDOT reimbursed before termination, and recover funds from the Recipient.
16.4 Non-Terminating Events.
(a) The end of the period of performance described under section 10.4 does not terminate this agreement or the Recipient’s obligations under this agreement.
(b) The liquidation of funds under section 20.1 does not terminate this agreement or the Recipient’s obligations under this agreement.
16.5 Other Remedies. The termination authority under this article 16 supplements and does not limit the USDOT’s remedial authority under article 15 or 2 C.F.R. part 200, including 2 C.F.R. 200.339–200.340.
ARTICLE 17
MONITORING, FINANCIAL MANAGEMENT, CONTROLS, AND RECORDS
17.1 Recipient Monitoring and Record Retention.
(a) The Recipient shall monitor activities under this award, including activities under subawards and contracts, to ensure:
(1) that those activities comply with this agreement; and
(2) that funds provided under this award are not expended on costs that are not allowable under this award or not allocable to this award.
(b) If the Recipient makes a subaward under this award, the Recipient shall monitor the activities of the subrecipient in compliance with 2 C.F.R. 200.332(d).
(c) The Recipient shall retain records relevant to the award as required under 2 C.F.R.
200.334.
17.2 Financial Records and Audits.
(a) The Recipient shall keep all project accounts and records that fully disclose the amount and disposition by the Recipient of the award funds, the total cost of the Project, and the amount or nature of that portion of the cost of the Project supplied by other sources, and any other financial records related to the project.
(b) The Recipient shall keep accounts and records described under section 17.2(a) in accordance with a financial management system that meets the requirements of 2 C.F.R.
200.301–200.303, 2 C.F.R. part 200, subpart F, and title 23, United States Code, and will facilitate an effective audit in accordance with 31 U.S.C. 7501–7506.
(c) The Recipient shall separately identify expenditures under the fiscal year 2022 SS4A grants program in financial records required for audits under 31 U.S.C. 7501–7506.
Specifically, the Recipient shall:
(1) list expenditures under that program separately on the schedule of expenditures of Federal awards required under 2 C.F.R. part 200, subpart F, including “FY 2022” in the program name; and
(2) list expenditures under that program on a separate row under Part II, Item 1 (“Federal Awards Expended During Fiscal Period”) of Form SF-SAC, including “FY 2022” in column c (“Additional Award Identification”).
17.3 Internal Controls. The Recipient shall establish and maintain internal controls as required under 2 C.F.R. 200.303.
17.4 USDOT Record Access. The USDOT may access Recipient records related to this award under 2 C.F.R. 200.337.
ARTICLE 18
CONTRACTING AND SUBAWARDS
18.1 Build America, Buy America. This award term implements § 70914(a) of the Build America, Buy America Act, Pub. L. No. 117-58, div. G, tit. IX, subtitle A, 135 Stat. 429, 1294 (2021) and Office of Management and Budget (OMB) Memorandum M-22-11, “Initial Implementation Guidance on Application of Buy America Preference in Federal Financial Assistance Programs for Infrastructure.”
Requirement to Use Iron, Steel, Manufactured Products, and Construction Materials Produced in the United States.
The Recipient shall not use funds provided under this award for a project for infrastructure unless:
(1) all iron and steel used in the project are produced in the United States—this means all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States;
(2) all manufactured products used in the project are produced in the United States—this means the manufactured product was manufactured in the United States; and the cost of the components of the manufactured product that are mined, produced, or manufactured in the United States is greater than 55 percent of the total cost of all components of the manufactured product; and
(3) all construction materials are manufactured in the United States—this means that all manufacturing processes for the construction material occurred in the United States.
Inapplicability.
The domestic content procurement preference in this award term only applies to articles, materials, and supplies that are consumed in, incorporated into, or affixed to an infrastructure project. As such, it does not apply to tools, equipment, and supplies, such as temporary scaffolding, brought to the construction site and removed at or before the completion of the infrastructure project. Nor does a Buy America preference apply to equipment and furnishings, such as movable chairs, desks, and portable computer equipment, that are used at or within the finished infrastructure project but are not an integral part of the structure or permanently affixed to the infrastructure project.
Waivers.
When necessary, the Recipient may apply for, and the USDOT may grant, a waiver from the domestic content procurement preference in this award term.
A request to waive the application of the domestic content procurement preference must be in writing. The USDOT will provide instructions on the waiver process and on the format, contents, and supporting materials required for any waiver request. Waiver requests are subject to public comment periods of no less than 15 days and must be reviewed by the Office of Management and Budget (OMB) Made in America Office.
When the USDOT has made a determination that one of the following exceptions applies, the awarding official may waive the application of the domestic content procurement preference in any case in which the USDOT determines that:
(1) applying the domestic content procurement preference would be inconsistent with the public interest;
(2) the types of iron, steel, manufactured products, or construction materials are not produced in the United States in sufficient and reasonably available quantities or of a satisfactory quality; or
(3) the inclusion of iron, steel, manufactured products, or construction materials produced in the United States will increase the cost of the overall project by more than 25 percent.
There may be instances where an award qualifies, in whole or in part, for an existing waiver described at https://www.transportation.gov/office-policy/transportation-policy/made-in-america.
Definitions
“Construction materials” includes an article, material, or supply—other than an item of primarily iron or steel; a manufactured product; cement and cementitious materials; aggregates such as stone, sand, or gravel; or aggregate binding agents or additives—that is or consists primarily of:
• non-ferrous metals;
• plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables);
• glass (including optic glass);
• lumber; or
• drywall.
“Domestic content procurement preference” means all iron and steel used in the project are produced in the United States; the manufactured products used in the project are produced in the United States; or the construction materials used in the project are produced in the United States.
“Primarily iron or steel” means that the cost of the iron and steel content in the article, material, or supply exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
“Project” means the construction, alteration, maintenance, or repair of infrastructure in the United States.
(a) Construction materials used in the Project are subject to the domestic preference requirement at § 70914 of the Build America, Buy America Act, Pub. L. No. 117-58, div.
G, tit. IX, subtitle A, 135 Stat. 429, 1294 (2021), as implemented by OMB, USDOT, and FHWA. The Recipient acknowledges that this agreement is neither a waiver of § 70914(a) nor a finding under § 70914(b).
(b) Under 2 C.F.R. 200.322, as appropriate and to the extent consistent with law, the Recipient should, to the greatest extent practicable under this award, provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States. The Recipient shall include the requirements of 2 C.F.R. 200.322 in all subawards including all contracts and purchase orders for work or products under this award.
https://www.transportation.gov/office-policy/transportation-policy/made-in-america
18.2 Small and Disadvantaged Business Requirements. The Recipient shall expend all funds under this award in compliance with the requirements at 2 C.F.R. 200.321 (“Contracting with small and minority businesses, women’s business enterprises, and labor surplus area firms”).
18.3 Engineering and Design Services. The Recipient shall award each contract or sub-contract for program management, construction management, planning studies, feasibility studies, architectural services, preliminary engineering, design, engineering, surveying, mapping, or related services with respect to the project in the same manner that a contract for architectural and engineering services is negotiated under 2 CFR 200.320or an equivalent qualifications-based requirement prescribed for or by the Recipient.
18.4 Foreign Market Restrictions. The Recipient shall not allow funds provided under this award to be used to fund the use of any product or service of a foreign country during the period in which such foreign country is listed by the United States Trade Representative as denying fair and equitable market opportunities for products and suppliers of the United States in procurement and construction.
18.5 Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment. The Recipient acknowledges that Section 889 of Pub. L. No. 115-232, 2 C.F.R. 200.216 and 2 C.F.R. 200.471 prohibit the Recipient and all subrecipients from procuring or obtaining certain telecommunications and video surveillance services or equipment under this award.
18.6 Recipient Responsibilities For Subawards. If the Recipient makes a subaward under this award, the Recipient shall comply with the requirements on pass-through entities under 2 C.F.R. parts 200 and 1201, including 2 C.F.R. 200.331–200.333.
18.7 Subaward and Contract Authorization.
If the USDOT Office for Subaward and Contract Authorization identified in section 5.1 is “FHWA Office of Acquisition and Grants Management,” then the Recipient shall obtain prior written approval from the USDOT agreement officer for the subaward or contracting out of any work under this agreement for Action Plan awards. This provision does not apply to the acquisition of supplies, material, equipment or general support services. That approval will be contingent upon a fair and reasonable price determination on the part of the Recipient and the agreement officer’s concurrence on that determination.
ARTICLE 19
COSTS, PAYMENTS, AND UNEXPENDED FUNDS
19.1 Limitation of Federal Award Amount. Under this award, the USDOT shall not provide funding greater than the amount obligated on the SS4A Grant cover page, Item 11, Federal Funds Obligated. The Recipient acknowledges that USDOT is not liable for payments exceeding that amount, and the Recipient shall not request reimbursement of costs exceeding that amount.
19.2 Projects Costs. This award is subject to the cost principles at 2 C.F.R. part 200 subpart E, including provisions on determining allocable costs and determining allowable costs.
19.3 Timing of Project Costs.
(a) The Recipient shall not charge to this award costs that are incurred after the period of performance.
(b) The Recipient shall not charge to this award costs that were incurred before the effective date of award of this agreement, unless there has been an approval pre-award costs under 2 C.F.R. 200.458. pre-award costs under 2 C.F.R. 200.458.
19.4 Recipient Recovery of Federal Funds. The Recipient shall make all reasonable efforts, including initiating litigation, if necessary, to recover Federal funds if the USDOT determines, after consultation with the Recipient, that those funds have been spent fraudulently, wastefully, or in violation of Federal laws, or misused in any manner under this award. The Recipient shall not enter a settlement or other final position, in court or otherwise, involving the recovery of funds under the award unless approved in advance in writing by the USDOT.
19.5 Unexpended Federal Funds. Any Federal funds that are awarded at section 10.1 but not expended on allocable, allowable costs remain the property of the United States.
19.6 Timing of Payments to the Recipient. When reimbursement is used, the Recipient shall not request reimbursement of a cost before the Recipient has entered an obligation for that cost.
19.7 Payment Method. The USDOT may deny a payment request that is not submitted using the method identified in section 5.2.
19.8 Information Supporting Expenditures
(a) If the USDOT Payment System identified in section 5.2 is “DELPHI eInvoicing,” then when requesting reimbursement of costs incurred or credit for cost share incurred, the Recipient shall electronically submit the SF 270 (Request for Advance or Reimbursement), shall identify the Federal share and the Recipient’s share of costs, and shall submit supporting cost detail to clearly document all costs incurred. As supporting cost detail, the Recipient shall include a detailed breakout of all costs incurred, including direct labor, indirect costs, other direct costs, and travel.
(b) If the Recipient submits a request for reimbursement that the USDOT determines does not include or is not supported by sufficient detail, the USDOT may deny the request or withhold processing the request until the Recipient provides sufficient detail.
19.9 Reimbursement Frequency. If the USDOT Payment System identified in section 5.2 is “DELPHI eInvoicing,” then the Recipient shall not request reimbursement more frequently than monthly.
ARTICLE 20
LIQUIDATION, ADJUSTMENTS, AND FUNDS AVAILABILITY
20.1 Liquidation of Recipient Obligations.
(a) The Recipient shall liquidate all obligations of award funds under this agreement not later than the earlier of (1) 120 days after the end of the period of performance or (2) the statutory availability to eligible entities date, which shall be 5 years after the date on which the grant is provided.
(b) Liquidation of obligations and adjustment of costs under this agreement follow the requirements of 2 C.F.R. 200.344–200.346.
ARTICLE 21
AGREEMENT MODIFICATIONS
21.1 Bilateral Modifications. The parties may amend, modify, or supplement this agreement by mutual agreement in writing signed by the USDOT and the Recipient. Either party may request to amend, modify, or supplement this agreement by written notice to the other party.
21.2 Unilateral Contact Modifications.
(a) The USDOT may update the contacts who are listed in sections 4.4 by written notice to all of the Recipient contacts who are listed in section 4.3.
21.3 USDOT Unilateral Modifications.
(a) The USDOT may unilaterally modify this agreement to comply with Federal law, including the Program Statute.
(b) To unilaterally modify this agreement under this section 21.3(a), the USDOT must provide a notice to the Recipient that includes a description of the modification and state the date that the modification is effective.
21.4 Other Modifications. The parties shall not amend, modify, or supplement this agreement except as permitted under sections 21.1, 21.2, or 21.3. If an amendment, modification, or supplement is not permitted under section 21.1, not permitted under section 21.2, and not permitted under section 21.3, it is void.
ARTICLE 22
CLIMATE CHANGE AND ENVIRONMENTAL JUSTICE
22.1 Climate Change and Environmental Justice. Consistent with Executive Order 14008, “Tackling the Climate Crisis at Home and Abroad” (Jan. 27, 2021), Attachment C documents the consideration of climate change and environmental justice impacts of the Project.
ARTICLE 23
RACIAL EQUITY AND BARRIERS TO OPPORTUNITY
23.1 Racial Equity and Barriers to Opportunity. Consistent with Executive Order 13985, “Advancing Racial Equity and Support for Underserved Communities Through the Federal Government” (Jan. 20, 2021), Attachment D documents activities related to the Project to improve racial equity and reduce barriers to opportunity.
ARTICLE 24
FEDERAL FINANCIAL ASSISTANCE, ADMINISTRATIVE, AND NATIONAL
POLICY REQUIREMENTS
24.1 Uniform Administrative Requirements for Federal Awards. The Recipient shall comply with the obligations on non-Federal entities under 2 C.F.R. parts 200 and 1201.
24.2 Federal Law and Public Policy Requirements.
(a) The Recipient shall ensure that Federal funding is expended in full accordance with the United States Constitution, Federal law, and statutory and public policy requirements:
including but not limited to, those protecting free speech, religious liberty, public welfare, the environment, and prohibiting discrimination.
(b) The failure of this agreement to expressly identify Federal law applicable to the Recipient or activities under this agreement does not make that law inapplicable.
24.3 Federal Freedom of Information Act.
(a) The USDOT is subject to the Freedom of Information Act, 5 U.S.C. 552.
(b) The Recipient acknowledges that the Technical Application and materials submitted to the USDOT by the Recipient related to this agreement may become USDOT records subject to public release under 5 U.S.C. 552.
24.4 History of Performance. Under 2 C.F.R 200.206, any Federal awarding agency may consider the Recipient’s performance under this agreement when evaluating the risks of making a future Federal financial assistance award to the Recipient.
24.5 Whistleblower Protection.
(a) The Recipient acknowledges that it is a “grantee” within the scope of 41 U.S.C. 4712, which prohibits the Recipient from taking certain actions against an employee for certain disclosures of information that the employee reasonably believes are evidence of gross mismanagement of this award, gross waste of Federal funds, or a violation of Federal law related this this award.
(b) The Recipient shall inform its employees in writing of the rights and remedies provided under 41 U.S.C. 4712, in the predominant native language of the workforce.
24.6 External Award Terms and Obligations.
(a) In addition to this document and the contents described in article 29, this agreement includes the following additional terms as integral parts:
(1) Appendix A to 2 C.F.R. part 25: System for Award Management and Universal Identifier Requirements;
(2) Appendix A to 2 C.F.R. part 170: Reporting Subawards and Executive Compensation;
(3) 2 C.F.R 175.15(b): Trafficking in Persons; and
(4) Appendix XII to 2 C.F.R. part 200: Award Term and Condition for Recipient Integrity and Performance Matters.
(b) The Recipient shall comply with:
(1) 49 C.F.R. part 20: New Restrictions on Lobbying;
(2) 49 C.F.R. part 21: Nondiscrimination in Federally-Assisted Programs of the Department of Transportation—Effectuation of Title VI of the Civil Rights Act of 1964;
(3) 49 C.F.R. part 27: Nondiscrimination on the Basis of Disability in Programs or Activities Receiving Federal Financial Assistance; and
(4) Subpart B of 49 C.F.R. part 32: Governmentwide Requirements for Drug-free Workplace (Financial Assistance).
24.7 Incorporated Certifications. The Recipient makes the statements in the following certifications, which are incorporated by reference:
(1) Appendix A to 49 CFR part 20 (Certification Regarding Lobbying).
ARTICLE 25
ASSIGNMENT
25.1 Assignment Prohibited. The Recipient shall not transfer to any other entity any discretion granted under this agreement, any right to satisfy a condition under this agreement, any remedy under this agreement, or any obligation imposed under this agreement.
ARTICLE 26
WAIVER
26.1 Waivers.
(a) A waiver granted by USDOT under this agreement will not be effective unless it is in writing and signed by an authorized representative of USDOT.
(b) A waiver granted by USDOT under this agreement on one occasion will not operate as a waiver on other occasions.
(c) If USDOT fails to require strict performance of a provision of this agreement, fails to exercise a remedy for a breach of this agreement, or fails to reject a payment during a breach of this agreement, that failure does not constitute a waiver of that provision or breach.
ARTICLE 27
ADDITIONAL TERMS AND CONDITIONS
27.1 Effect of Action Plan or Implementation Plan. Based on information that the Recipient provided to the USDOT, including the Technical Application, at indicated in section 2.5, this agreement designates this award as an Action Plan award or a Implementation award, as defined in the NOFO. The Recipient shall comply with the requirements that accompany that designation on minimum award size, geographic location, and cost sharing.
27.2 Disclaimer of Federal Liability. The USDOT shall not be responsible or liable for any damage to property or any injury to persons that may arise from, or be incident to, performance or compliance with this agreement.
27.3 Environmental Review
(a) In this section, “Environmental Review Entity” means:
(1) if the Project is located in a State that has assumed responsibilities for environmental review activities under 23 U.S.C. 326 or 23 U.S.C. 327 and the Project is within the scope of the assumed responsibilities, the State; and
(2) for all other cases, the FHWA.
(b) Except as authorized under section 27.3(c), the Recipient shall not begin final design;
acquire real property, construction materials, or equipment; begin construction; or take other actions that represent an irretrievable commitment of resources for the Project unless and until:
(1) the Environmental Review Entity complies with the National Environmental Policy Act, 42 U.S.C. 4321 to 4370m-12, and any other applicable environmental laws and regulations; and
(2) if the Environmental Review Entity is not the Recipient, the Environmental Review Entity provides the Recipient with written notice that the environmental review process is complete.
(c) If the Recipient is using procedures for early acquisition of real property under 23 C.F.R. 710.501 or hardship and protective acquisitions of real property 23 C.F.R.
710.503, the Recipient shall comply with 23 C.F.R. 771.113(d)(1).
(d) The Recipient acknowledges that:
(1) the Environmental Review Entity’s actions under section 27.3(a) depend on the Recipient conducting necessary environmental analyses and submitting necessary documents to the Environmental Review Entity; and
(2) applicable environmental statutes and regulation may require the Recipient to prepare and submit documents to other Federal, State, and local agencies.
(e) Consistent with 23 C.F.R. 771.105(a), to the extent practicable and consistent with Federal law, the Recipient shall coordinate all environmental investigations, reviews, and consultations as a single process.
(f) The activities described in this agreement may inform environmental decision-making processes, but the parties do not intend this agreement to document the alternatives under consideration under those processes. If a build alternative is selected that does not align information in this agreement, then:
(1) the parties may amend this agreement under section 21.1 for consistency with the selected build alternative; or
(2) if the USDOT determines that the condition…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .