SS Notice 75N91024Q00085 - DRAFT SON.pdf
PDF 262 KB Posted
- Solicitation number
- SS-75N91024Q00085
About this file
This document is a Statement of Need (SON) for the procurement of one (1) Brand Name or Equal Revvity Envision Nexus Multimodal Plate Reader for the Urologic Oncology Branch (UOB) within the National Cancer Institute (NCI).
The key details are:
- The equipment will be used to support preclinical cancer research, including experiments using fluorescent proteins and for standard and ultrasensitive luminescence, fluorescence intensity, absorbance, luminescence, fluorescence polarization, alpha and time-resolved fluorescence/FRET.
- This shall be a Firm Fixed-Price Purchase Order with delivery required within 4 weeks of award.
- The contractor must provide a 12-month warranty and on-site training for up to 10 users.
- Payment will be made in full after successful delivery, installation, training, and acceptance by the NCI Technical Point of Contact.
- The applicable NAICS code is 334516 (Analytical Laboratory Instrument Manufacturing) with a size standard of 1,000 employees, and the Product Service Code (PSC) is 6640 (Laboratory Equipment and Supply).
- This is a Sources Sought Notice/Request for Information, and responses are due by July 18, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SS Notice 75N91024Q00085.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF NEED (SON)
SS-75N91024Q00085 1
1.0 TITLE
Procurement of One (1) Brand Name or Equal Revvity Envision Nexus Multimodal Plate Reader
2.0 BACKGROUND
The Urologic Oncology Branch (UOB), within the Center for Cancer Research (CCR), at the National Cancer Institute (NCI) is focused on the study of hereditary urologic cancer at the clinical, genetic and molecular levels. UOB performs clinical research contributing to the development of surgical and diagnostic procedures, and therapeutics against human Genitourinary Cancer. UOB has a clinical surgery tumor sample bank, tumor cell lines, patient blood or other samples in a branch repository. UOB is also engaged in translational research via clinical trials. In support of this translational research, UOB is collaborating with the National Center for Advancing Translational Sciences (NCATS) to screen small molecules inhibitors and perform combination matrix screens against several types of kidney cancers as well as bladder cancer. Research Toward a Cure is part of an ongoing effort by UOB researchers to develop tools that enhance scientists' technical capabilities and advance cancer research.
In support of this research, the UOB requires one (1) Brand-Name or Equal Revvity Envision Nexus Multimodal Plate Reader. This equipment will used for experiments using fluorescent proteins and have the option of both standard and Ultrasensitive Luminescence, with the ability to read Fluorescence Intensity (top and bottom), Absorbance, Luminescence, Fluorescence Polarization, Alpha and Time-Resolved Fluorescence/FRET. To support preclinical cancer research.
3.0 TYPE OF ORDER
This shall be a Firm Fixed-Price Purchase Order.
4.0 SPECIAL ORDER REQUIREMENTS
One (1) Brand Name or Equal Revvity EnVision Nexus 2-detector (Product# HH36000002) equipped with
• Brand Name or Equal Revvity EnVision Nexus 2detector base instrument (Product#
HH36000052)
• Brand Name or Equal Revvity Country Kit US/CAN (Product# HH36000100)
• Brand Name or Equal Revvity Ultra-sensitive luminescence module (Product# HH36000200)
• Brand Name or Equal Revvity Enhanced Alpha Module (Product# HH36000220)
• Brand Name or Equal Revvity TRF laser module (Product# HH36000230)
• Brand Name or Equal Revvity Stacker (Product# HH36000250)
• Brand Name or Equal Revvity Barcode Reader Upgrade (Product# HH36000410)
• Brand Name or Equal Revvity laser collimation block (Product# HH36000225)
• Brand Name or Equal Revvity Stacker magazines - 20 plates (Product# HH36000251) http://www.google.com/url?sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&uact=8&sqi=2&ved=0CCYQFjAA&url=http%3A%2F%2Fwww.ncats.nih.gov%2F&ei=NO9fU4qDC6qGyQGjzoDwDA&usg=AFQjCNFs_tihE0B-mczYYky6B-d0BQdTjA&bvm=bv.65397613,d.cWc http://www.google.com/url?sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&uact=8&sqi=2&ved=0CCYQFjAA&url=http%3A%2F%2Fwww.ncats.nih.gov%2F&ei=NO9fU4qDC6qGyQGjzoDwDA&usg=AFQjCNFs_tihE0B-mczYYky6B-d0BQdTjA&bvm=bv.65397613,d.cWc
SS-75N91024Q00085 2
4.1 PRODUCT FEATURES/SALIENT CHARACTERISTICS
The following product features/characteristics are required for this instrument:
• Occupy a space no larger than 60cm x 60cm x 45cm.
• Demonstrate sample sorting capabilities for a variety of cell types.
• Ensure quality data collection through variety of luminescence.
• Offer efficient throughput and performance characteristics optimized with compatible software.
• Accommodate a variety of absorption/excitation/detection capabilities.
• Capable of supporting a variety of types of experiments.
4.2 WARRANTY
In addition to the Implied warranty contained in FAR Clause 52.212-4, the Contractor is encouraged to provide express warranties. At a minimum, the Contractor shall provide a 12-month warranty from date of final installation on all equipment and associated items provided under, or as a part of this purchase order.
The warranty shall include repair and or replacement of parts, including travel, labor, and materials, at no additional cost to the Government. The warranty shall not exclude or limit the Governments rights for an Implied warranty as established in the terms and conditions of clause 52.212-4.
4.3 DELIVERY / INSTALLATION
Delivery shall be within four (4) weeks of the purchase order award. All shipping/handling (including FOB Destination) and delivery/installation fees shall be included in the quote. Upon delivery, the Contractor shall notify the respective NCI Technical Point of Contact to schedule installation dates and times. Installation shall occur within seven (7) calendar days of delivery and shall be performed by, or under the direct supervision of, a certified operator.
The contractor shall deliver and install the equipment at the following address:
Urologic Oncology Branch National Institutes of Health/NCI 9000 Rockville Pike Bethesda, MD 20892 Technical Point of Contact: [to be provided upon award]
4.3.1 DELIVERY GUIDANCE
The Contractors shall communicate and follow instructions from the Technical Point of Contact (TPOC) to coordinate delivery and installation.
The Contractor shall direct all courier and delivery services – including those not operated by the Contractor (e.g. FedEx, USPS, UPS) – to follow the instructions in this section.
All companies delivering to the NIH main campus must comply with Commercial Vehicle Inspection Facility (CVIF) access procedures. Upon arrival, the CVIF will provide a list of buildings and loading docks to delivery personnel.
SS-75N91024Q00085 3
Deliveries will be logged in at the loading dock, and the loading dock contractor or Government personnel will attempt to contact the TPOC listed on the package. In the event that the TPOC is unable to accept the package, the delivery shall not be left at the loading dock station. The delivery must be returned to the Contractor, and the Contractor must coordinate with the TPOC to deliver on another date at no additional cost.
Deliveries can only be made between 6:00 a.m. and 4:00 p.m. EST, Monday – Friday, excluding federal holidays.
4.4 INSPECTION AND ACCEPTANCE
Pursuant to FAR Clause 52.212-4, all items to be delivered in relation to this Purchase Order are subject to final inspection and acceptance by an authorized representative of the Government. The authorized representative of the Government is the TPOC who is responsible for inspection and acceptance of all services, materials, or supplies to be provided by the Contractor.
The TPOC has limited authority as defined within this Statement of Need. They do not have the authority to commit or obligate Government funds or make changes to the terms and conditions of the purchase order. As such, any changes to the purchase order must be performed by a warranted Government Contracting Officer with appropriate delegated authority to do so.
4.5 TRAINING
The Contractor shall provide on-site training for up to 10 users. Training shall be conducted by a certified operator. The user training shall include an overview of setup approaches, instrument settings, and a demonstration of the performance. Instrument care and maintenance must also be covered and information about accessing unlimited technical support. The training shall be provided at a time specified by the Technical Point of Contact following installation of the device. All training expenses, including materials and/or travel expenses, shall be included in the quoted price.
5.0 PAYMENT
Payment shall be made in full after the successful delivery, installation, training, and acceptance of equipment by the NCI Technical Point of Contact (TPOC). Payment authorization requires submission and approval of invoices to the NCI TPOC and NIH OFM, in accordance with the payment provisions listed below:
The following clause is applicable to all Purchase Orders, Task or Delivery Orders, and Blanket Purchase Agreement (BPA) Calls: Prompt Payment (Jan 2017) FAR 52.232-25.
Highlights of this clause and NIH implementation requirements follow:
I. Invoice Requirements
A. An invoice is the Contractor's bill or written request for payment under the contract for supplies delivered or services performed. A proper invoice is an "Original" which must include the items listed in subdivisions 1 through 12, below, in addition to the requirements of FAR 32.9. If the invoice does not comply with these
SS-75N91024Q00085 4
requirements, the Contractor will be notified of the defect within 7 days after the date the designated billing office received the invoice (3 days for meat, meat food products, or fish, and 5 days for perishable agricultural commodities, dairy products, edible fats, or oils) with a statement of the reasons why it is not a proper invoice. (See exceptions under II., below.) Untimely notification will be considered in the computation of any interest penalty owed the Contractor.
1. Vendor/Contractor: Name, Address, Point of Contact for the invoice (Name, title, telephone number, e-mail and mailing address of point of contact).
2. Remit-to address (Name and complete mailing address to send payment).
3. Remittance name must match exactly with name on original order/contract. If the
Remittance name differs from the Legal Business Name, then both names must appear on the invoice.
4. Invoice date.
5. Unique invoice #s for all invoices per vendor regardless of site.
6. NBS document number formats must be included for awards created in the NBS:
Contract Number; Purchase Order Number; Task or Delivery Order Number and Source Award Number (e.g., Indefinite Delivery Contract number; General Services Administration number); or, BPA Call Number and BPA Parent Award Number.
7. Unique Entity Identifier (UEI) which is in the System for Award Management (SAM) and replaces the Dun & Bradstreet Data Universal Numbering System (DUNS) number.
8. Federal Taxpayer Identification Number (TIN). In those rare cases where a contractor does not have a UEI number or TIN, a Vendor Identification Number (VIN) must be referenced on the invoice. The VIN is the number that appears after the contractor’s name on the face page of the award document.
9. Identify that payment is to be made using a three-way match.
10. Description of supplies/services that match the description on the award, by line billed.*
11. Freight or delivery charge must be billed as shown on the award. If it is included in the item price do not bill it separately. If identified in the award as a separate line item, it must be billed separately.
12. Quantity, Unit of Measure, Unit Price, Extended Price of supplies delivered or services performed, as applicable, and that match the line items specified in the award.*
NOTE: If your invoice must differ from the line items on the award, please contact the Contracting Officer before submitting the invoice. A modification to the order or contract may be needed before the invoice can be submitted and paid.
Shipping costs will be reimbursed only if authorized by the Contract/Purchase Order.
If authorized, shipping costs must be itemized. Where shipping costs exceed $100, the invoice must be supported by a bill of lading or a paid carrier's receipt.
B. The Contractor shall submit invoices to the Department of Treasury’s Invoice Processing Platform (IPP) at https://www.ipp.gov with a copy to the approving official, as directed below.
The Contractor shall submit a copy of the electronic invoice to the following Approving Official (Technical Point of Contact):
Approving Official: Technical Point of Contact Name- Email Address-https://www.ipp.gov/
SS-75N91024Q00085 5
II. Invoice Payment A. Except as indicated in paragraph B., below, the due date for making invoice payments by the designated payment office shall be the later of the following two events:
1. The 30th day after the designated billing office has received a proper invoice.
2. The 30th day after Government acceptance of supplies delivered or services performed.
B. The due date for making invoice payments for meat and meat food products, perishable agricultural commodities, dairy products, and edible fats or oils, shall be in accordance with the Prompt Payment Act, as amended.
III. Interest Penalties
A. An interest penalty shall be paid automatically, if payment is not made by the due date and the conditions listed below are met, if applicable.
1. A proper invoice was received by the designated billing office.
2. A receiving report or other Government documentation authorizing payment was processed and there was no disagreement over quantity, quality, or contractor compliance with a term or condition.
3. In the case of a final invoice for any balance of funds due the contractor for supplies delivered or services performed, the amount was not subject to further settlement actions between the Government and the Contractor.
B. Determination of interest and penalties due will be made in accordance with the provisions of the Prompt Payment Act, as amended, the Contract Disputes Act, and regulations issued by the Office of Management and Budget.
IV. PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS
SUBCONTRACTORS, FAR 52.232-40 (MAR 2023)
(a) Upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, after receipt of a proper invoice and all other required documentation from the small business subcontractor.
(b) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.
(c) Include the substance of this clause, including this paragraph (c), in all subcontracts with small business concerns, including subcontracts with small business concerns for the acquisition of commercial products or commercial services.
(End of Clause)
V. HHSAR 352.232-71 Electronic Submission of Payment Requests (February 2, 2022)
(a) Definitions. As used in this clause—
Payment request means a bill, voucher, invoice, or request for contract financing payment with associated supporting documentation. The payment request must comply with the
SS-75N91024Q00085 6
requirements identified in FAR 32.905(b), ‘‘Content of Invoices’’ and the applicable Payment clause included in this contract.
(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests electronically using the Department of Treasury Invoice Processing Platform (IPP) or successor system. Information regarding IPP, including IPP Customer Support contact information, is available at www.ipp.gov or any successor site.
(c) The Contractor may submit payment requests using other than IPP only when the Contracting Officer authorizes alternate procedures in writing in accordance with HHS procedures.
(d) If alternate payment procedures are authorized, the Contractor shall include a copy of the Contracting Officer’s written authorization with each payment request.
(End of Clause) http://www.ipp.gov/
| I. Invoice Requirements |
| II. Invoice Payment |
| III. Interest Penalties |
| IV. PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS SUBCONTRACTORS, FAR 52.232-40 (MAR 2023) |
| V. HHSAR 352.232-71 Electronic Submission of Payment Requests (February 2, 2022) |
File details come from the government source that posted it. Updated .