This Sources Sought Notice is issued by the U.S. Army Corps of Engineers, Huntsville Engineering and Support Center (CEHNC) to conduct market research for Architectural & Engineering (A-E) services supporting a microgrid and backup power design project at Camp Walker in the Republic of Korea (ROK). The project involves developing a 100% Design Bid Build package for a smart microgrid system, including 1,650KWdc rooftop and carport solar arrays, 4,000KW diesel generator capacity, a 6,000KW/3,000KWh Battery Energy Storage System, microgrid controls, transformers, and switches. The notice is open only to Korean A-E firms and will be used to determine if the requirement can be set aside exclusively for Korean firms.

Interested Korean A-E firms must submit a 10-page response addressing a detailed Capabilities Questionnaire by 2:00 P.M. Central Time on 12 December 2025. The submission must cover the firm's experience with microgrid design, military construction projects, life cycle cost analysis, personnel qualifications, licenses, registrations, and capacity to execute A-E services in ROK. Firms must be registered in the System for Award Management (SAM) and demonstrate capability to work with Unified Facilities Criteria (UFC) and Unified Facility Guide Specifications (UFGS), with all project deliverables to be provided in English. This is a market research effort and does not constitute a formal solicitation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCES SOUGHT NOTICE

Architectural & Engineering Services in Support of Microgrid and Backup Power Design, Camp Walker, Republic of Korea (ROK)

This is a SOURCES SOUGHT NOTICE that is issued solely for informational and planning purposes and does not constitute a solicitation. This notice is for market research purposes only and IS NOT A REQUEST FOR PROPOSAL, nor does it restrict the Government as to the ultimate acquisition approach.

This notice is open for responses from Korean Architect-Engineer (A-E) Firms Only and responses will be utilized to determine if this requirement can be set-aside for Korean A-E Firms.

The Government will not reimburse respondents for any cost incurred in preparation of a response to this notice. Responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. The Government does not intend to rank submittals or provide any reply to interested companies and responses will not be returned.

1. CONTRACT INFORMATION:

The U.S. Army Corps of Engineers, Huntsville Engineering and Support Center (CEHNC) in Huntsville, Alabama, is conducting market research to identify qualified Korean A-E Firms capable of providing a range of services as part of the Energy Resilience & Conservation Investment Program (ERCIP), to include but not limited to the following: Facility assessment, design development, cost estimation, cost and risk assessment, utility coordination, other associated studies or project support. These services will support all facilities on Camp Walker, ROK.

The Government is performing market research to determine if any Korean A-E Firms possess the capability to execute the requirements within this acquisition. Interested Korean A-E Firms who meet the capability requirements identified in this notice are requested to reply to this notice with a response to the questions below. If no experience or capabilities are associated with a particular question, please specify. All Korean A-E Firms must be registered in the System for Award Management (SAM).

2. PROJECT INFORMATION:

Contractors (KTRs) must have the capability to develop a 100% Design Bid Build package, to include the development of cost estimates and design and construction schedules, of a smart microgrid system to provide energy resilience for all facilities on Camp Walker, ROK, in support of DoD and other Government agencies and activities. All products must be in English. The project will include 1,650KWdc rooftop and carport Photovoltaic (PV) solar arrays, 4,000KW diesel generator capacity, a 6,000KW/3,000KWh Battery Energy Storage System (BESS), microgrid controls, transformers, and switches. The project includes new carports, and structural upgrades and replacement of building roof systems to support the PV solar arrays. The project will integrate 2.5MW of existing diesel generator capacity into the microgrid. Also included in the project is commissioning and testing, cybersecurity, electric service, site improvements, information systems, and environmental air permitting. KTRs will coordinate interconnection

Camp Walker, Republic of Korea (ROK) agreements with Korea Electric Power Corporation. KTRs should have familiarity with Unified Facilities Criteria (UFC) and Unified Facility Guide Specifications (UFGS).

3. SUBMISSION REQUIREMENTS:

Interested firms should submit a document which furnishes information describing relevant demonstrated experience and qualifications in the following format: The submissions should be Times New Roman, font size 12 and should not exceed 10, one-sided, 8 ½" X 11" pages.

The submission will address all questions in the Capabilities Questionnaire listed below and your ability to perform the services stated in the above notice.

Submit responses via email to: Antonio Mastin, antonio.l.mastin@usace.army.mil and Cole Harris, cole.p.harris@usace.army.mil. Submissions shall be received NO LATER THAN 2:00 P.M. Central Time on 12 December 2025 (or sooner).

NO HARDCOPY OR FACSIMILE SUBMISSIONS WILL BE ACCEPTED.

Cover letters and extraneous materials (brochures, etc.) will not be considered. Personal visits for the purpose of discussing this announcement will not be scheduled.

4. CAPABILITIES QUESTIONNAIRE

SECTION I: GENERAL

a. Business Name: (Insert Business Name)

b. Business Address: (Insert Business Address)

c. Cage Code/UEI:

d. Responsible Point of Contact: (Insert name, address, phone number, and email address)

SECTION II: CAPABILITY/CORPORATE EXPERIENCE

1. Does your firm have the capability to provide A-E services throughout the ROK? If there are any geographic limitations, please specify the provinces, regions, or installations where services can or cannot be performed.

2. Has your firm performed (or is currently performing) A-E Microgrid design services in the ROK during the past five years? If yes, please provide the following for each project:

a. Customer/ Agency

b. Project location

c. Description and scope of effort

d. Contract or task order dollar value

e. Period of performance

f. Point of contact information mailto:antonio.l.mastin@usace.army.mil mailto:cole.p.harris@usace.army.mil

3. Has your firm performed A-E Microgrid design services for any projects classified as Military

Construction, for the United States Government? Was your firm required to adhere to United Facilities Criteria (UFC) and United Facilities Guide Specifications (UFGS)? Were all products provided in English? If yes to all three questions, please provide the following for each project:

a. Customer/ Agency

b. Project location

c. Description and scope of effort

d. Contract or task order dollar value

e. Period of performance

f. Point of contact information

4. Has your firm ever produced a Life Cycle Cost Analysis following UFC and Engineering

Regulation requirements? If yes, please provide the following for each project:

a. Customer/ Agency

b. Project location

c. Description and scope of effort

d. Contract or task order dollar value

e. Period of performance

f. Point of contact information

5. Does your firm have qualified and experienced personnel capable of performing A-E services as described in this notice, and in accordance with the requirements listed in the above section #2, titled “Project Information”? If yes, provide:

a. Number of qualified key personnel

b. Minimum, maximum, and average years of relevant experience

c. Disciplines represented (e.g., architecture, structural, civil, electrical, mechanical, fire protection, planning, cost engineering, etc.)

6. Does your firm currently possess or have the ability to obtain, the licenses, permits, and certifications required to perform A-E services? Licenses and certifications of interest include, but are not limited to:

a. Professional Engineer

b. Registered Architect

c. Certified Cost Engineer

d. Cybersecurity

i. Individuals performing cybersecurity design functions must meet certification and skills requirements for Information Assurance Management (IAM) Level II Certified Professional outlined in DoD 8570/8140 Information Assurance Workforce Improvement Program.

ii. Use of a subcontractor to meet this requirement is acceptable.

List any additional licenses or certifications your firm possesses that may be advantageous to the Government.

7. Is your firm currently licensed and registered to perform A-E services in the ROK? If yes, provide:

a. Type of registration (local business registration, engineering service registration, etc.)

b. Issuing authority

c. Registration/ license numbers (if applicable)

d. Expiration dates

e. If not currently registered, describe your ability and timeline to obtain required ROK registrations.

8. Provide specific details regarding your firm’s current and projected capacity to execute A-E requirements in the ROK. Include the following:

a. Number of teams or personnel available

b. Estimated annual workload capacity (in dollars or project count)

c. Availability of in-country resources, subcontractors, or partnerships

9. Is your firm compliant with the use of Cost Accounting Standards as detailed in 48 CFR 9904?

If yes, please provide an affirmative response stating as such.

10. Is your firm capable of complying with requirements for certified cost and pricing data as detailed under FAR 15.403-4? If yes, please provide an affirmative response stating as such.

11. Does your firm have experience developing, implementing, and maintaining an effective Quality Control or Quality Assurance program for A-E services? If yes, provide examples that demonstrate:

a. QC processes or procedures

b. Tools used (e.g., checklists, peer reviews)

c. Results achieved (e.g., reduction in rework, improved accuracy)