SRF Work Item Index.pdf
PDF 34 KB Posted
- Attached to
- USS JOHN CANLEY (ESB-6) MID-TERM AVAILABILITY
- Solicitation number
- N6264926RL015
About this file
This document is an index page for a Job Order document related to USS JOHN L CANLEY (ESB 6), referenced as SING-005-27. The index lists Category II FY-27 Standard Items that may be invoked in the work items of this job order, organized by item number with corresponding titles, change dates, and change designations.
The standard items indexed include maintenance and repair work across multiple ship systems and components. Key work items include: Process Control Procedure (PCP) provision and accomplishment; insulation and lagging; welding, fabrication, and inspection; meter, gauge, switch, and thermometer repair; structural boundary testing; deck covering; cleaning and painting requirements; general woodwork procedures; piping system testing; chemical disinfection procedures; and piping system cleanliness restoration and flushing for non-nuclear systems. Most items are dated as Original effective 10/01/2024, with two items (deck covering and cleaning/painting requirements) showing a CH-2 change dated 06/06/2025. This index represents standard maintenance and operational requirements applicable to the naval vessel's maintenance job order.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Work Item Index Report USS JOHN CANLEY.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .