This is an Addendum 1 to the Request for Proposals (RFP) issued by the Salt River Pima-Maricopa Indian Community (SRPMIC) for the Salt River Elementary School (SRES) Playground Revisions and Shade Canopies project, Solicitation No. PW-23-035. The addendum updates project drawings and provides clarification on key construction requirements. A pre-proposal meeting was held on May 9, 2023, with questions due by May 22, 2023, responses issued by May 24, 2023, and proposals due by May 26, 2023 at 4:00 PM. The project scope includes new playground equipment with shade canopy, site work, and associated improvements. Revised sheets L1.2 and L3.1 incorporate an accessible wheelchair swing into the playground equipment design. The substantial completion target date is January 25, 2024, with an anticipated 145 calendar days from Notice to Proceed. The work is located within an occupied building on the SRPMIC Campus and requires coordination with office schedules, a full-time company superintendent, education background checks for all personnel, cultural sensitivity training, and compliance with community parking and COVID protocols.
The total project cost is $1,154,112, with construction costs of $961,047. The project is fully funded through federal grants and is subject to Davis Bacon/Prevailing Wage Rates. Performance and Payment Bonds are required; however, a Bid Bond is not required. The RFP includes one allowance of $15,000 for off-hours work (nights and weekends) and two alternates: Alternate 1 for a new rubberized walking track surface and Alternate 2 for a new bus canopy. A critical clarification addresses the rubberized play surface base requirements, with the Base Bid requiring a 4-inch concrete or asphalt base and a Deduct Alternate "1A" providing compacted stone base with geotextile as an option. SRPMIC anticipates providing approximately 50 percent of required fill dirt material from an adjacent ECEC construction site, with contractors responsible for transporting onsite material and procuring any additional fill dirt needed, plus providing a unit cost for additional material if the existing stockpile falls short of the estimated 50 percent quantity. Contractors must possess a valid Arizona Registrar of Contractors (ROC) license and acknowledge all addenda in their submittal.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PW-23-035.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Salt River Pima-Maricopa Indian Community 10005 East Osborn Road • Scottsdale, Arizona 85256
Phone (480) 362-7700 • Fax (480) 362-5597
1 | 2
ADDENDUM 1
SOLICITATION NO. PW- 23-035
SALT RIVER ELEMENTARY SCHOOL (SRES)
PLAYGROUND REVISIONS AND SHADE CANOPIES
Issue Date: 5/18/2023
A. GENERAL:
1. Revise as follows:
a. N/A
B. DRAWINGS:
a. Replace Sheet L1.2 in its entirety. Updated playground equipment to include accessible wheelchair swing.
b. Replace Sheet L3.1 in its entirety. Updated playground equipment to include accessible wheelchair swing.
C. SPECIFICATIONS:
a. N/A
D. QUESTION/ ANSWER (RFI):
1. Question- Rubberized track and or playground surface manufacturers may require an asphalt or concrete base for the rubberized surface in order to maintain the manufacturer’s warranty. Details show that the “PREFFERD OPTION” is for a 4” concrete or asphalt base what should be included in the bid price.
Answer- The rubberized play surface as detailed on 4/L3.2 should include 4” concrete or asphalt base for the Base Bid pricing. Contractor to provide a Deduct
Alternate to provide compacted stone base with geotextile.
Alternate 1 - Rubberized Surface at Existing Track Base Bid detail 3/L3.2 should include 4” concrete or asphalt base for the Base Bid pricing.
Contractor to provide a Deduct Alternate “1A” to provide compacted stone base with geotextile.
2. Question- Does SRPMIC have fill dirt that can be used for the project to bring the new playground surface up to the proposed finish grade elevation?
Answer- At this time Contractors can assume that SRPMIC has approximately 50% of the fill dirt material needed to meet the new playground surface finish grade elevation. This material is located on the adjacent ECEC campus just to the
North of the SRES work site. There is gate access off the North of the SRES running track directly into the current ECEC construction site. The
Phone (480) 362-7700 • Fax (480) 362-5597
2 | 2
Contractors Base Bid should include all costs associated with transporting this onsite fill material as well as providing any remaining fill dirt required to meet the new playground surface finish grade elevation. In addition the
Contractor is to provide a Unit Cost for any additional fill dirt that may need to be provided if the existing stockpile is below the anticipated 50% total quantity.
E. ATTACHMENTS:
1. Pre-Proposal Meeting Sign-In Sheet
2. Pre-Proposal Meeting Agenda
3. Revised sheet/s L1.2 and L3.1
4. Fill dirt location map
This Addendum shall be considered as part of the bid documents for the above mentioned project as though it had been issued at the same time and shall be incorporated integrally therewith. Where provisions of the following supplementary data differ from those of the original request for proposal documents, this Addendum shall govern and take precedence. OFFERORS MUST ACKNOWLEDGE
ALL ADDENDUM IN THEIR SUBMITTAL.
END OF ADDENDUM
Phone (480) 362-7700 • Fax (480) 362-5597
PRE-PROPOSAL/ BID MEETING AGENDA
1 | 2
Project Name: SRES- PLAYGROUND REVISIONS AND SHADE CANOPIES
Solicitation: PW-23-035 CIP: N/A
Date: Tuesday, May 9, 2023 at 11:00 AM
A. INTRODUCTIONS – SRPMIC STAFF AND CONSULTANTS
Dwayne Wilson Sr. Project Manager e-mail: Dwayne.Wilson@srpmic-nsn.gov phone: 480-362-2666
Taylor Pomahatch DLR tpomahatch@dlrgroup.com 602-381-8580
Emily Niu SRES emily.niu@saltriverschools.org
B. FINANCES/ FUNDING
This Project is fully funded through Federal Grants.
Total Project Cost $1,154,112.00
Construction Cost $961,047.00
Davis Bacon/ Prevailing Wage Rates apply to this project.
The Project is entirely funded through Federal grants, at this time it should be assumed that Davis Bacon/
Prevailing Wage Rates apply to this project and should be included in the proposed pricing form.
C. BONDING & INSURANCE
The following bonding is required for this project:
• Bid Bond IS NOT required.
• Performance Bond IS required.
• Payment Bond IS required.
Insurance requirements as noted in the RFP and/ or “Instruction to Offerors”
D. PROJECT TIMELINE
TASK ITEM DATE COMMENTS
Deadline for questions to SRPMIC Mon, 5/22/2023 4:00 PM
Response to RFI – Addendum Issued Wed, 5/24/2023 4:00 PM
Proposals Due Fri, 5/26/2023 4:00 PM
Substantial Completion Thu, 1/25/2024 Target Date
If you find any perceived conflicts, error/s, omission/s, or discrepancy: submit an RFI via email to Dwayne Wilson, for an interpretation or clarification. If clarification is deemed necessary the response will be issued in an
Addendum to ALL Offerors.
The project is anticipated to be completed in 145 calendar days after Notice to Proceed
E. GENERAL INSTRUCTIONS
• Work time – This is a 1ST SHIFT project. Some off-hours (Nights/ Weekend) work may be required to complete the defined scope of work.
• The Project is located within occupied building/s on the SRPMIC Campus. Work hours will be set by PW
PM and the Contractor, Monday through Friday. Installation and delivery of materials will need to be coordinated around office schedules. Contractor MUST have personnel on site to accept deliveries.
• This Project DOES require a Fulltime Company Superintendent to oversee all subcontractor disciplines.
• This Project DOES require an Education Background Check. For projects on or within the
Community’s Educational Buildings and or/ Complex a background check will be required for
ALL construction personnel who have access to students and who will be on campus more than two times in a calendar year.
PRE-PROPOSAL/ BID MEETING AGENDA
2 | 2
• Onsite parking, staging, dumpster, and storage of materials is limited. All SRPMIC parking requirements and restrictions must be followed during the duration of the Project.
• ALL on site construction personnel are required to take the Cultural Resources, “Cultural Sensitivity
Training” prior to the start of any work within the Community. Link: https://srpmic-cst-registration.corsizio.com/c/5da79ae843131153e3ab5fa6
• ALL roll-off construction dumpsters are to be ordered through SRPMIC Public Works.
o https://www.srpmic-nsn.gov/government/public-works/solid-waste/#CommercialServices o Email: PWCustomerService@srpmic-nsn.gov o Phone: 480-362-5600
• All contractors working on site are required to comply with the Community’s posted COVID
Policies & Protocol. Social distancing requirements, mask or equivalent PPE are to be worn inside all buildings while in public areas (corridors, common areas, restrooms etc.).
F. PROJECT SCOPE REVIEW
Scope of work includes but is not limited to the following:
☒ Existing Conditions
☒ Demolition
☒ Concrete
☐ Masonry
☒ Structural Steel
☐ Steel Joist Framing
☒ Steel Deck
☒ Metal Fabrications
☒ Rough Carpentry
☐ Water Repellants
☐ Insulation
☐ Stucco - EFIS
☒ Roof System
☐ Sheet Metal
☐ Roof Accessories
☒ Sealants
☐ Doors & Frames -HDW
☐ Overhead Sectional Doors
☐ Finishes
☐ Specialties
☐ Fire Suppression
☐ Plumbing
☐ Mechanical
☐ Electrical
☐ Communications-Data-AV
☐ Security
☐ Fire Alarm
☒ Earthwork & Asphalt
☒ Exterior Improvements
ALLOWANCES -This RFP DOES include Allowances.
Allowance 01: Provide an Allowance of $15,000 for off hours work, including nights and weekends. Extent and scope of work to be determined.
ALTERNATES - This RFP DOES include Alternates.
• Base Bid - Scope to consist of new playground equipment, shade canopy and all associated site work.
• Alternate 1 – New rubberized Walking Track surface and all associated site work.
• Alternate 2 – New Bus Canopy and all associated site work.
UNIT PRICES - This RFP DOES NOT include Unit Prices.
G. PROPOSAL SUBMISSION
(1) Electronic PDF of the Request for Proposal (RFP) must be received on or before the date and time noted.
The RFP package should be emailed to the name and address listed in the Instruction to Offerors, RFPs
WILL NOT be accepted after the stated deadline date/ time. Send questions regarding the submittal requirements to: Purchasing-bids@srpmic-nsn.gov
Use the “Cost Proposal Form”, if one is included as part of the Exhibits to the RFP. Cost Proposal should include
ALL Allowances, Alternates and/ or Unit costs as defined in the RFP, Drawings or Specifications.
H. QUESTIONS & ANSWERES
I. SITE VISIT
Supply and install the following material. Landscape designer to field verify location prior to installation.
LANDSCAPE PLAN LEGEND
Rubberized Surface - Walking Track
DG
GROUND COVER/ HARDSCAPE MATERIAL
Decomposed Granite - 1/2" Screened, 3" Deep (match existing DG color on site) Surrounding New Improvements.
Rubberized Play Surface - Poured In Place
Existing Tree to Remain
0' 15' 30' 60' 120'
D
LR
G ro up
6/
/2
3:
:4
P
M
B
IM
-2
-0
S
R P
-M
IC
E C
E C
/3 0-
2-
_S R
P -M
IC
E
C E
C _A
R _2
0.
rv t
30-22132-00
05/16/2023
S R
P M
IC
S A
LT
R
IV
E
R E
LE
M
E N
TA
R
Y P
LA
Y
G R
O U
N D
R E
P
LA
C E
M E
N T
100%
CONSTRUCTION
DOCUMENTS
N or th C en te r S tre et , S co tts da le
, A Z
LANDSCAPE ARCHITECT STAMP
SCALE: 1" = 10'-0"1 LANDSCAPE PLAN
Landscape Plan
L1.2
2' Wide Low Wall Refer to Detail 2, Sheet L3.1
EXISTING
DRAINAGE
BASIN
Existing 6" Concrete Curb on Both Side of Existing Track to Remain
Rubberized Play Surface (Main) Color: Tan
Rubberized Play Surface (Walkway) Color: Tan
New 6" Concrete Curb, Typ.
ALTERNATE 1: New Rubberized Surface at Walking Track. Color: Tan Refer to Detail 3, Sheet L3.2
New Playstructure w/ Shade Canopy Refer to Detail 1, Sheet L3.1
Flush 6" Concrete Curb Refer to Detail 2, Sheet L3.2
R=3 5'-
0"
2'-0"
10'-0"
5'-0"
Rubberized Play Surface (Walkway) Color: Tan
Limits of Decomposed Granite, Typ.
Refer to Detail 1, Sheet L3.2
Decomposed Granite Surrounding New Improvements
Decomposed Granite Surrounding New Improvements
Decomposed Granite Surrounding New Improvements
Decomposed Granite
2'-0"
Existing Trees to Remain in Place
Existing Trees to Remain in Place
Existing Trees to Remain in Place
ALTERNATE 1: New Rubberized Surface at Walking Track. Color: Tan Refer to Detail 3, Sheet L3.2
ALTERNATE 1:
New Rubberized Surface at Walking Track. Color: Tan Refer to Detail 3, Sheet L3.2
Poured In-Place Rubber Ramp up to 10" Platform Required.
ADA Accessible Swing Bay
Varies
18"
2'-0"
18"
CAST IN PLACE
CONCRETE
SEATWALL
INTEGRAL CONCRETE
DAVIS COLORS: ADOBE
1" CHAMFERED
EDGE
2'-0" 1" CHAMFERED EDGE
#4 REBAR AT SEAT
CORNERS
#4 REBAR AT 18" O.C. EACHWAY
#4 REBAR
TIED EACH WAY
FINISHED GRADE
18"
3"
8" Min.
6" Min.
RUBBERIZED
PLAYSURFACE
WEEP HOLES
48" O.C. TYP.
D
LR
G ro up
6/
/2
3:
:4
P
M
B
IM
-2
-0
S
R P
-M
IC
E C
E C
/3 0-
2-
_S R
P -M
IC
E
C E
C _A
R _2
0.
rv t
30-22132-00
05/16/2023
S R
P M
IC
S A
LT
R
IV
E
R E
LE
M
E N
TA
R
Y P
LA
Y
G R
O U
N D
R E
P
LA
C E
M E
N T
100%
CONSTRUCTION
DOCUMENTS
N or th C en te r S tre et , S co tts da le
, A Z
LANDSCAPE ARCHITECT STAMP
Details
L3.1
CAST IN-PLACE CONCRETE SEATWALLS
N.T.S.2
SECTION - 2' WIDE SEATWALLS
PLAY STRUCTURE WITH SHADE CANOPY
N.T.S.1
NOTES:
1. MANUFACTUER: LANDSCAPE STRUCTURES
(OR APPROVED EQUAL)
2. AVAILABLE FROM: EXCERPLAY, INC.
12220 N HWY 14, SUITE 1
CEDAR CREST, NM 87008
PHONE: 1.505.281.0155
MODEL/SYSTEM: PLAYBOOSTER
DRAWING NO.: #220613D
Color palette: BT or AL Shade Fabric: Tan, Flame Resistant Fabric shall comply with
NFPA 701 flame spread requirements Shade Structure: Tan
3. INSTALL PER MANUFACTURERS RECOMMENDATION
4. SUMBIT SHOP DRAWINGS FOR APPROVAL
FRONT VIEW
BACK VIEW
Shade Canopy Fabric - Flame Resistant Fabric shall comply with NFPA 701 flame spread requirements.
Color: Tan
Shade Canopy Poles Color: Tan
Ruberized Play Surface Color: Tan Match Walkway
Poured In-Place Rubber Ramp up to 10" Platform Required.
ADA Accessible Swing Bay
SRES Approximate limits of work
Gate access to ECEC site
Approximate location of fill dirt
File details come from the government source that posted it. Updated .