SRC36212. MSSP fire extinguishers.pdf

PDF 123 KB Posted

Attached to
Conservation/Parks/Monte Sano - Fire Extinguisher Inspection
Solicitation number
SRC0000036212
Issued by
Madison County, Alabama

About this file

This is a fire extinguisher inspection specification for the Alabama Department of Conservation and Natural Resources (DCNR) at Monte Sano State Park in Huntsville, Alabama. The vendor must conduct inspections on 34 fire extinguishers consisting of 22 2.5-pound ABC units, 5 5-pound ABC units, and 7 10-pound ABC units located throughout multiple park buildings and vehicles. All inspections must comply with NFPA 10 requirements and be completed by December 29, 2026, between 8:00 AM and 4:00 PM. The vendor must be certified and insured, with all work performed by a certified technician. The contract includes three quotable line items: inspections, service/repairs/parts (including 6-year maintenance, 12-year maintenance, hydro tests, and recharging), and new extinguisher replacements. The vendor must coordinate scheduling to accommodate rentable buildings that may be occupied during the inspection period.

DCNR intends to establish a multi-year agreement with a maximum contract term not to exceed 5 years and/or $25,000 in cumulative value, with annual renewal options. The inspection date, time, and location for subsequent years will be provided to the vendor at least 2 months in advance. Vendor certification must be attached with the bid submission. This is an "all or none" procurement, requiring the vendor to accept the entire scope of work to be eligible for award.

View the file

Other files

File Type Posted
DOPQQBPV4.08.26.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fire Extinguisher Inspections for Monte Sano State Park Inspection location:

Monte Sano State Park 5105 Nolen AVE SE Huntsville, AL 35801

** This inspection is for the extinguishers in multiple buildings and vehicles throughout the park**

Inspection to be completed by 12/29/2026 between the hours of 8am-4pm.

Please note that the vendor will need to schedule a time to be at this location once the PO is approved. There are several buildings that are rentable and cannot be entered if occupied. Location and the inspection must be worked into the schedule.

VENDOR MUST BE Certified AND Insured.

All Inspections, maintenance, repairs are to be performed by a certified technician.

Line 1: Inspections

Inspections to be compliant with NFPA 10 requirements Vendor must provide inspections on the following 34 (Thirty-Four) extinguishers

- (22) 2.5LB ABC FIRE EXTINGUISHER,

- (5) 5LB ABC FIRE EXTINGUISHERS,

- (7) 10LB ABC FIRE EXTINGUISHER.

Line 2: Service/Repairs/Parts.

This line is a quotable line. This line is for any parts, recharging, and/or maintenance to an extinguisher during the inspection. This includes 6-year maintenance, 12-year maintenance, Hydro Tests, recharging, and any other required services.

Line 3: New Extinguishers/Replacements

This line is a quotable line. This line is for replacing an extinguisher during the inspection.

Inspection to be completed by 12/29/2026 between the hours of 8am-4pm.
VENDOR MUST BE Certified AND Insured.

File details come from the government source that posted it. Updated .