Swift School Tract Recreational Trail Mulching Specifications

This is a scope of work specification document issued by the State of Alabama for a mulching and trail installation project at the Swift School Tract state lands property. The project requires a vendor to create and mulch a recreational hiking trail spanning approximately 1.236 miles (6,500 feet) with a width of 12 feet throughout its length, plus an additional 2-acre mulching area at the trailhead. The specifications prohibit mulching of trees or stems larger than 8 inches in diameter and recommend use of skid steer-style mulching equipment rather than cutters. All excess debris generated during installation must be mulched in place. A mandatory site visit is scheduled for Wednesday, May 6th at 10:00 AM at the property entrance opposite the Charme Road and Bon Secour Highway intersection in Bon Secour, Alabama. The project must be completed by June 31, 2026, with Jeremy Doss (251-404-3919) serving as the point of contact.

The bid submission includes all labor, materials, supplies, and equipment costs in a single all-or-none pricing structure. No specific pricing terms, set-asides, incumbent contractor information, or funding sources are detailed in the specifications document. The contract appears to be competitively bid with mandatory contractor participation in the site visit requirement prior to proposal submission.

View the file

Other files

File Type Posted
DOPQQBPV4.08.26.pdf PDF
SRC33771. Swift_School_Trail_-_Map.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Swift School Tract Recreational Trail Mulching Vendor is to mulch all trees in respected area; the purpose is to create a hiking trail.

Mulching Service includes:

• Approximately 1.236 miles (~6500 feet) of trail to be created/mulched (path will be GPS’d and marked on the ground.

• Trail to be mulched out approximately 12 ft wide for the full length of the trail.

• Additional mulching to be done at trail head to equal ~ 2-acre total.

• No mulching of trees/stems bigger than 8” will be required

• Work is suggested to be done with skid steer-style mulching head, not cutter.

• All excess debris from installation is to be mulched in place.

• Work to be completed by June 31, 2026

• See attached map

• Price includes ALL labor, materials, supplies and equipment.

Mandatory site visit on Wednesday May 6th @ 10am Site Visit will take place at the entrance to the property opposite the Charme Rd and Bon Secour Hwy intersection in Bon Secour, Alabama Lat 30.318673’ Long -87.728074 Point of contact will be Jeremy Doss 1-251-404-3919