SRC22044. Heat Pump Install at Cheaha State Park.pdf
PDF 98 KB Posted
- Solicitation number
- SRC0000022044
- Issued by
- Clay County, Alabama
About this file
This document is a job specification for a state contract opportunity issued by the Alabama Department of Conservation and Natural Resources for the installation of a new heat pump system at the Cheaha State Park's CCC Museum/Tower facility located at 19644 Highway 281, Delta, AL 36258. The job requirements include the removal of an existing Mitsubishi mini split 2.5-ton system and the installation of a new 2.5-ton Westinghouse ductless mini split heat pump system behind the building. The contract requires the vendor to order and install the specific listed unit, provide a warranty on the product and labor, and complete the work by July 1, 2024. A mandatory site visit is scheduled for May 22, 2024, at 10 a.m. at the project location.
The contract opportunity is an "all or none" bid for the heat pump installation at the Cheaha State Park, located in Clay County, Alabama. The contract is being advertised through the Alabama Department of Conservation and Natural Parks. No additional details are provided regarding pricing terms, set asides, incumbents, funding sources, or other salient information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DCNR Standard_Terms_and_Conditions 1-2023.pdf | ||
| Quick Quote Standard Boilerplate updated 08.31.2023.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Heat Pump Install at Cheaha State Park: 19644 Highway 281, Delta, AL 36258.
JOB SPECS INCLUDE:
• REMOVE ONE EXSISTING MITSBISHI MINI SPLIT 2 1/2 TON SYSTEM AND INSTALL ONE NEW 2 1/2
TON WESTINGHOUSE DUCTLESS MINI SPLIT HEAT PUMP COMPLETE.
• INSTALLATION WILL BE AT THE CCC MUSEUM/TOWER & UNIT IS TO BE INSTALLED BEHIND THE
BUILDING.
• MUST BE ABLE TO ORDER AND INSTALL SPECIFIC UNIT LISTED
• MUST GUARANTEE JOB AND PROVIDE A WARRANTY ON THE PRODUCT AND LABOR
• JOB IS TO BE COMPLETED ON OR BEFORE 7/1/2024
• AFTER PO IS APPROVED, VENDOR MUST CONTACT THE PARK TO SCHEDULE INSTALLATION
MANDATORY SITE VISIT ON 5/22/2024 @ 10am at the address listed above
File details come from the government source that posted it. Updated .