SRC21961. specs.pdf
PDF 100 KB Posted
- Attached to
- Conservation/Parks/Gulf-Trail Ground Cover
- Solicitation number
- SRC0000021961
- Issued by
- Baldwin County, Gulfcrest CDP, Alabama
About this file
The document provided is a set of specifications for a trail project at Gulf State Park near Gulf Shores, Alabama. The project is located near the Gulf State Park Headquarters at 20115 State Park Road, Gulf Shores, AL 36542. The scope of work includes the installation of a 1,500-foot walkway/path, which requires the removal of small stumps and debris, leveling the existing ground, installing geofabric, adding crushed concrete base, and leveling and packing the base. The project requires 7 loads of crushed concrete base, 1,500 linear feet of geofabric, and landscape pins. A mandatory site visit is scheduled for Monday, May 6th, 2024, at 9:00 AM, and the point of contact is 251-424-0036.
The related state and local contract opportunity is for a Conservation/Parks/Gulf-Trail Ground Cover project, which is an all-or-none contract. The project is located at the same address as the trail project, and the same mandatory site visit applies. The jurisdictions involved are Baldwin County and Gulfcrest CDP.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DCNR Standard_Terms_and_Conditions 1-2023.pdf | ||
| Quick Quote Standard Boilerplate updated 08.31.2023.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Trail Project at Gulf State Park
Project is located near the Gulf State Parks Headquarters @ 20115 State Park Road Gulf Shores, AL 36542
Job Specs:
*Walkway/Path - 1500� x 8� x 3"
-Remove small stumps and debris in path and haul it out.
-Level exis�ng ground and prep for geofabric.
-Install geofabric, pin, and secure with landscape pins.
-Add crushed base along 1500 linear � of fabric.
-Level and pack crushed base.
Materials Needed: 7 loads crushed concrete base, 1500 linear foot of geofabric, and landscape pins.
Job includes material, opera�on, fuel, mobiliza�on, and other expenses complete in accordance with the above specifica�ons.
Site Visit Required – Monday May 6th at 9:00 AM Point of Contact 251-424-0036
File details come from the government source that posted it. Updated .